Letter Sequence Other |
---|
|
Results
Other: ML16074A292, RA-13-050, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), RA-15-065, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), RA-15-066, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), RA-16-010, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), RA-16-011, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), RA-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), RS-13-033, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
|
MONTHYEARRS-13-033, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13227A3042013-08-28028 August 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI RA-13-050, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other RA-13-071, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-09-18018 September 2013 Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Response to RAI ML13268A0312013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI RA-15-066, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other RA-15-065, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other RA-16-010, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other RA-16-011, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML16074A2922016-03-28028 March 2016 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other RA-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-12-0101 December 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other 2013-09-18
[Table View] |
|
---|
Category:Letter type:RA
MONTHYEARRA-19-091, Commitment Change Summary Report - 20192019-12-27027 December 2019 Commitment Change Summary Report - 2019 RA-19-080, Response to Request for Additional Information (RAI) Related to Oyster Creek Nuclear Generating Station - Post-Shutdown Decommissioning Activities Report2019-10-18018 October 2019 Response to Request for Additional Information (RAI) Related to Oyster Creek Nuclear Generating Station - Post-Shutdown Decommissioning Activities Report RA-19-076, Request for Continuation of NRC Actions and Approvals Following Transfer of the Licenses from Exelon Generation to Holtec Decommissioning International, LLC2019-09-12012 September 2019 Request for Continuation of NRC Actions and Approvals Following Transfer of the Licenses from Exelon Generation to Holtec Decommissioning International, LLC RA-19-065, Signature Verification and Acceptance of Amendment 19 to Indemnity Agreement No B-37 to Renewed Facility License No. DPR-162019-08-28028 August 2019 Signature Verification and Acceptance of Amendment 19 to Indemnity Agreement No B-37 to Renewed Facility License No. DPR-16 RA-19-052, Security Plan, Training Qualification Plan, Safeguards Contingency Plan, (Revision 18)2019-06-11011 June 2019 Security Plan, Training Qualification Plan, Safeguards Contingency Plan, (Revision 18) RA-19-023, Annual Radioactive Effluent Release Report for 20182019-04-30030 April 2019 Annual Radioactive Effluent Release Report for 2018 RA-19-019, Submittal of Changes to Technical Specifications Bases2019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases RA-19-012, Supplement for License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements2019-03-0707 March 2019 Supplement for License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements RA-19-007, Response to RAI and Supplemental Information Re Request for Changing Emergency Preparedness License Amendment 294 Effective Date (Change to Adiabatic Heat-Up Calculation)2019-02-13013 February 2019 Response to RAI and Supplemental Information Re Request for Changing Emergency Preparedness License Amendment 294 Effective Date (Change to Adiabatic Heat-Up Calculation) RA-19-003, Amendment No. 17 to Indemnity Agreement No. 8-372019-01-0808 January 2019 Amendment No. 17 to Indemnity Agreement No. 8-37 RA-18-103, Annual Sea Turtle Incidental Take Report - 20182018-12-13013 December 2018 Annual Sea Turtle Incidental Take Report - 2018 RA-18-080, License Amendment Request: License Condition Revision for Removal of Cyber Security Plan Requirements2018-11-12012 November 2018 License Amendment Request: License Condition Revision for Removal of Cyber Security Plan Requirements RA-18-098, License Amendment Request Supplement - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-11-0606 November 2018 License Amendment Request Supplement - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RA-18-097, Exelon Nuclear Radiological Emergency Plan and Addendum Revisions2018-10-24024 October 2018 Exelon Nuclear Radiological Emergency Plan and Addendum Revisions RA-18-092, License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-10-22022 October 2018 License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RA-18-093, Request to Reinitiate Consultation Regarding the OCNGS Sea Turtle Incidental Take Statement2018-10-16016 October 2018 Request to Reinitiate Consultation Regarding the OCNGS Sea Turtle Incidental Take Statement RA-18-091, Request to Reclassify Oyster Creek Nuclear Generating Station Under 10 CFR 171.15, Annual Fees: Reactor Licenses and Independent Spent Fuel Storage Licenses2018-10-0101 October 2018 Request to Reclassify Oyster Creek Nuclear Generating Station Under 10 CFR 171.15, Annual Fees: Reactor Licenses and Independent Spent Fuel Storage Licenses RA-18-090, Notice Regarding Proposed Amendment No. 1 to Master Terms for Decommissioning Trust Agreements2018-10-0101 October 2018 Notice Regarding Proposed Amendment No. 1 to Master Terms for Decommissioning Trust Agreements RA-18-083, Certification of Permanent Removal of Fuel from the Reactor Vessel for Oyster Creek Nuclear Generating Station2018-09-25025 September 2018 Certification of Permanent Removal of Fuel from the Reactor Vessel for Oyster Creek Nuclear Generating Station RA-18-088, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek.2018-09-25025 September 2018 Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek. RA-18-087, Response to Request for Additional Information (RAI) Related to Post-Shutdown Decommissioning Activities Report2018-09-24024 September 2018 Response to Request for Additional Information (RAI) Related to Post-Shutdown Decommissioning Activities Report RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test RA-18-078, Submittal of Sea Turtle Incidental Take Report 2018-0042018-08-15015 August 2018 Submittal of Sea Turtle Incidental Take Report 2018-004 RA-18-077, Sea Turtle Incidental Take Report 2018-0032018-08-14014 August 2018 Sea Turtle Incidental Take Report 2018-003 RA-18-072, Pressure and Temperature Limit Report Revision 12018-06-29029 June 2018 Pressure and Temperature Limit Report Revision 1 RA-18-066, Response to Questions Pertaining to Licensed Operator2018-06-18018 June 2018 Response to Questions Pertaining to Licensed Operator RA-18-070, Submittal of Sea Turtle Incidental Take Report 2018-001 on June 04, 20182018-06-0808 June 2018 Submittal of Sea Turtle Incidental Take Report 2018-001 on June 04, 2018 RA-18-068, Response to Request for Additional Information (RAI) Regarding Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for Oyster Creek Nuclear Generating Station2018-06-0606 June 2018 Response to Request for Additional Information (RAI) Regarding Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for Oyster Creek Nuclear Generating Station RA-18-065, Registration of Use of Cask to Store Spent Fuel2018-05-31031 May 2018 Registration of Use of Cask to Store Spent Fuel RA-18-059, Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-05-30030 May 2018 Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events RA-18-055, 10 CFR 50.46 Annual Report2018-05-23023 May 2018 10 CFR 50.46 Annual Report RA-18-053, Update to Spent Fuel Management Plan2018-05-21021 May 2018 Update to Spent Fuel Management Plan RA-18-052, Supplement to Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance and Supplement to Request for Exemption from 10 CFR 140.11(a)(4), Concerning Primary and Secondary ...2018-05-0808 May 2018 Supplement to Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance and Supplement to Request for Exemption from 10 CFR 140.11(a)(4), Concerning Primary and Secondary ... RA-18-049, Registration of Use of Cask to Store Spent Fuel2018-05-0707 May 2018 Registration of Use of Cask to Store Spent Fuel RA-18-046, Oyster Creek, Transmittal of Annual Radiological Environmental Operating Report for 20172018-04-30030 April 2018 Oyster Creek, Transmittal of Annual Radiological Environmental Operating Report for 2017 RA-18-047, Annual Radioactive Effluent Release Report for 20172018-04-30030 April 2018 Annual Radioactive Effluent Release Report for 2017 RA-18-018, Submittal of Changes to Technical Specifications Bases2018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases RA-18-021, Request for Exemption from Record Retention Requirements2018-04-12012 April 2018 Request for Exemption from Record Retention Requirements RA-18-028, Request for Rescission of Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)2018-04-12012 April 2018 Request for Rescission of Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) RA-18-027, Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2018-04-12012 April 2018 Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RA-18-036, Response to Request for Additional Information (RAI) and Supplement Regarding License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ...2018-03-29029 March 2018 Response to Request for Additional Information (RAI) and Supplement Regarding License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ... RA-18-019, Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance2018-03-29029 March 2018 Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance RA-18-020, Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance2018-03-29029 March 2018 Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance RA-18-032, Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2018-03-27027 March 2018 Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues RA-18-034, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv)2018-03-22022 March 2018 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) RA-18-015, Withdrawal of Application to Revise Technical Specifications to Implement BWRVIP-18, Revision 2-A and Relief Request for Extension of Torus Examinations2018-02-15015 February 2018 Withdrawal of Application to Revise Technical Specifications to Implement BWRVIP-18, Revision 2-A and Relief Request for Extension of Torus Examinations RA-18-014, Response to Request for Additional Information (RAI) and Supplemental Regarding License Amendment Request - Proposed Changes to the Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-02-13013 February 2018 Response to Request for Additional Information (RAI) and Supplemental Regarding License Amendment Request - Proposed Changes to the Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-102018-02-0808 February 2018 Summary of Changes to Quality Assurance Topical Report, NO-AA-10 RA-18-010, Supplement to Relief Request for Extension of Torus Examinations2018-01-24024 January 2018 Supplement to Relief Request for Extension of Torus Examinations RA-17-086, Commitment Change Summary Report - 20172017-12-21021 December 2017 Commitment Change Summary Report - 2017 2019-09-12
[Table view] |
Text
Exelon Generation ~
Order No. EA-12-051 RS-16-203 RA-16-088 December 1, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219
Subject:
Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
References:
- 1. NRC Order Number EA-12-051, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
- 2. NRC Interim Staff Guidance JLD-ISG-2012-03, "Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," Revision 0, dated August 29, 2012
- 3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 1, dated August 2012
- 4. Exelon Generation Company, LLC's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated October 25, 2012
- 5. Exelon Generation Company, LLC Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013 (RS-13-033)
- 6. NRC letter to Exelon Generation Company, LLC, Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation, dated August28,2013
- 7. Exelon Generation Company, LLC letter to NRC, Response to Request For Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051),
dated September 18, 2013 (RS-13-212)
- 8. Exelon Generation Company, LLC First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 28, 2013 (RS-13-124)
- 9. Exelon Generation Company, LLC Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2014 (RS-14-023)
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 December 1, 2016 Page 2
- 10. Exelon Generation Company, LLC Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 28, 2014 (RS-14-201)
- 11. Exelon Generation Company, LLC Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 27, 2015 (RS-15-031)
- 12. Exelon Generation Company, LLC Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 28, 2015 (RS-15-203)
- 13. Exelon Generation Company, LLC Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 26, 2016 (RS-16-031)
- 14. Exelon Generation Company, LLC Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 26, 2016 (RS-16-151)
- 15. NRC letter to Exelon Generation Company, LLC, Oyster Creek Nuclear Generating Station - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC No. MF0823), dated November 8, 2013
- 16. NRC letter to Exelon Generation Company, LLC, Oyster Creek Nuclear Generating Station - Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA 051, dated August 29, 2016 On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," (Reference 1) to Exelon Generation Company, LLC (EGC). Reference 1 was immediately effective and directed EGC to install reliable spent fuel pool level instrumentation.
Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an Overall Integrated Plan (OIP) pursuant to Section IV, Condition C. Reference 2 endorsed industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the EGC initial status report regarding reliable Spent Fuel Pool Instrumentation (SFPI). Reference 5 provided the Oyster Creek Nuclear Generating Station OIP.
Reference 1 required submission of a status report at six-month intervals following submittal of the 01 P. References 8, 9, 10, 11, 12, 13, and 14 provided the first, second, third, fourth, fifth, sixth, and seventh six-month status reports, respectively, pursuant to Section IV, Condition C.2, of Reference 1 for Oyster Creek Nuclear Generating Station.
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 December 1, 2016 Page 3 The purpose of this letter is to provide the report of full compliance with the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (Reference 1) pursuant to Section IV, Condition C.3 of the Order for Oyster Creek Nuclear Generating Station.
Oyster Creek Nuclear Generating Station has installed two independent full scale level monitors for the Spent Fuel Pool (SFP) in response to Order EA-12-051 . Oyster Creek Nuclear Generating Station OIP Open Items have been addressed and closed as documented in References 8, 9, 1O, 11, 12, 13, and 14, and are considered complete pending NRG closure.
The information provided herein documents full compliance for Oyster Creek Nuclear Generating Station with Reference 1.
EGC's response to the NRG OIP Requests for Additional Information (OIP RAls), and the NRG Interim Staff Evaluation (ISE) Open Items {ISE RAls) identified in References 6 and 15 have been addressed and closed as documented in References 7, 8, 9, 10, 11, 12, 13, 14 and below, and are considered complete pending NRG closure. EGC's response to the NRG audit questions and additional audit open items have been addressed as documented in the NRG Site Audit Report (Reference 16). Reference 16 contains no remaining audit open items regarding Oyster Creek Nuclear Generating Station compliance with NRG Order EA-12-051.
The following table provides completion references for each NRG OIP RAI and ISE RAI.
OIP Open Item No. 1 Reference 8 OIP RAI No. 1 (Open Item No. 2, Ref. 7) Reference 14 OIP RAI No. 2 (Open Item No. 3, Ref. 7) Reference 14 OIP RAI No. 3 (Open Item No. 4, Ref. 7) Reference 14 OIP RAI No. 4 (Open Item No. 5, Ref. 7) Reference 14 OIP RAI No. 5 (Open Item No. 6, Ref. 7) Reference 14 OIP RAI No. 6 (Open Item No. 7, Ref. 7) Replaced by ISE RAI No. 9 OIP RAI No. 7 (Open Item No. 8, Ref. 7) Reference 14 OIP RAI No. 8 (Open Item No. 9, Ref. 7) Reference 14 OIP RAI No. 9 (Open Item No. 10, Ref. 7) Reference 14 OIP RAI No. 1O (Open Item No. 11, Ref. 7) Replaced by ISE RAI No. 13 OIP RAI No. 11 (Open Item No. 12, Ref. 7) Reference 14 ISE RAI No. 2 (Open Item No. 1, Ref. 15) Reference 14 ISE RAI No. 4 (Open Item No. 2, Ref. 15) Reference 14 ISE RAI No. 5 (Open Item No. 3, Ref. 15) Reference 14 ISE RAI No. 7 (Open Item No. 4, Ref. 15) Reference 14 ISE RAI No. 9 (Open Item No. 5, Ref. 15) Reference 14 ISE RAI No. 12 (Open Item No. 6, Ref. 15) Reference 14 ISE RAI No. 13 (Open Item No. 7, Ref. 15) Reference 14 and updated with this submittal as provided below Table Notes:
- ISE RAls are not duplicated in the table above if previously issued as OIP RAls in Reference 6.
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 December 1, 2016 Page 4 The following table documents the completion of the final remaining open action as identified in Reference 14. As stated above, EGC provides the response for the following item and considers this item to be complete for Oyster Creek Nuclear Generating Station.
Item Description Reference ISE Open Item No. 7 Complete (RAI- 13, Ref. 15) Oyster Creek developed the following procedures/documents addressing the use of Please provide a list of SFP Instrumentation:
the procedures addressing operation 1. Operator Rounds to perform channel (both normal and verifications against each other and against abnormal response), physical pool level.
calibration, test, 2. Operator Rounds to check SFPI is operating maintenance, and on AC power source.
inspection procedures 3. CC-OC-118, Rev. 00 incorporated that will be developed for compensatory actions. Compensatory use of the SFP actions have been incorporated into eSOMS instrumentation. The as a method to log and track unavailability.
licensee is requested to 4. SFPI vendor manual VM-OC-6652. This include a brief document provides instructions for description of the calibration, maintenance, testing and specific technical inspection of SFPI.
objectives to be 5. FSG-09, "Makeup to The Fuel Pool", was achieved within each developed to provide guidance to fill the procedure. SFP, when required, based on SFP level indication.
MILESTONE SCHEDULE - ITEMS COMPLETE Milestone Completion Date Submit 60 Day Status Report October 25, 2012 Submit Overall lnteqrated Plan February 28, 2013 Submit Responses to RAls September 18, 2013 Submit 6 Month Updates:
Update 1 Auqust28,2013 Update 2 February 28, 2014 Update 3 August28,2014 Update 4 February 27, 2015 Update 5 Auqust 28, 2015 Update 6 February 26, 2016 Update 7 AUQUSt26,2016 Modifications:
Conceptual Design 302012 Issue Exelon Fleet contract to procure SFPI 202013
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 December 1, 2016 Page 5 Milestone Completion Date Equipment:
BeQin Detailed DesiQn EnQineerinQ 102015 Complete and Issue SFPI Modification Package 302015 BeQin Installation 202016 Complete SFPI Installation and Put Into Service August04,2016 ORDER EA-12-051 COMPLIANCE ELEMENTS
SUMMARY
The elements identified below for Oyster Creek Nuclear Generating Station, as well as the site overall integrated plan response submittal (Reference 5), and the 6-Month Status Reports (References 8, 9, 10, 11, 12, 13, and 14), demonstrate compliance with Order EA-12-051 .
IDENTIFICATION OF LEVELS OF REQUIRED MONITORING - COMPLETE Oyster Creek Nuclear Generating Station has identified the three required levels for monitoring SFP level in compliance with Order EA-12-051. These levels have been integrated into the site processes for monitoring level during events and responding to loss of SFP inventory.
INSTRUMENT DESIGN FEATURES - COMPLETE The design of the instruments installed at Oyster Creek Nuclear Generating Station complies with the requirements specified in the Order and described in NEI 12-02 "Industry Guidance for Compliance with NRC Order EA-12-051". The instruments have been installed in accordance with the station design control process.
The instruments have been arranged to provide reasonable protection against missiles.
The instruments have been mounted to retain design configuration during and following the maximum expected ground motion. The instruments will be reliable during expected environmental and radiological conditions when the SFP is at saturation for extended periods. The instruments are independent of each other and have separate and diverse power supplies. The instruments will maintain their design accuracy following a power interruption and are designed to allow for routine testing and calibration.
The instrument display is readily accessible during postulated events and allows for SFP level information to be promptly available to decision makers.
PROGRAM FEATURES - COMPLETE Training for Oyster Creek Nuclear Generating Station has been completed in accordance with an accepted training process as recommended in NEI 12-02, Section 4.1.
Operating and maintenance procedures for Oyster Creek Nuclear Generating Station have been developed and integrated with existing procedures. Procedures have been verified and are available for use in accordance with the site procedure control program.
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 December 1, 2016 Page 6 Site processes have been established to ensure the instruments are maintained at their design accuracy.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact David P. Helker at 610-765-5525.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of December 2016.
Respectfully submitted, James Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC cc: Director, Office of Nuclear Reactor Regulation NRC Regional Administrator - Region I NRC Senior Resident Inspector - Oyster Creek Nuclear Generating Station NRC Project Manager, NRR - Oyster Creek Nuclear Generating Station Mr. John D. Hughey, NRR/JLD/JOMB, NRC Manager, Bureau of Nuclear Engineering - New Jersey Department of Environmental Protection Mayor of Lacey Township, Forked River, NJ