Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23151A4362023-05-24024 May 2023 License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 ML23151A4372023-05-24024 May 2023 Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database ML23095A0082023-04-0404 April 2023 Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information2022-03-29029 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology2021-11-19019 November 2021 Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 102021-10-25025 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 102021-10-15015 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 ML21258A3792021-09-14014 September 2021 Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor. L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report2020-06-24024 June 2020 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor2020-06-0808 June 2020 Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re2020-05-21021 May 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements2020-04-16016 April 2020 Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information2020-04-0909 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications2019-07-22022 July 2019 Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications ML19158A5032019-06-0707 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 Consultation L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response2019-06-0404 June 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response L-2019-048, Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 82019-03-15015 March 2019 Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 8 L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses2019-03-0606 March 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses L-2019-033, Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses2019-03-0101 March 2019 Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses ML19056A1252019-02-25025 February 2019 Turky Point SLRA RAIs 1 2 3 4 5 6 7 8 9 11 - Set 8 Rev 1 Irradiated Concrete-Steel Responses L-2019-012, Response to Follow-on NRC RAI No. B.2.3.9-1 a2019-02-13013 February 2019 Response to Follow-on NRC RAI No. B.2.3.9-1 a L-2019-023, Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals2019-01-31031 January 2019 Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals L-2018-234, Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision2018-12-21021 December 2018 Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision L-2018-223, Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses2018-12-14014 December 2018 Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses L-2018-222, Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses2018-12-12012 December 2018 Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses L-2018-218, Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review2018-11-28028 November 2018 Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review L-2018-191, Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review2018-11-28028 November 2018 Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review L-2018-193, Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review2018-11-0202 November 2018 Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings.2018-10-31031 October 2018 WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal ML18299A1172018-10-12012 October 2018 Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines2018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines ML18299A1182018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 ML18283A3102018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application Environmental Review L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review2018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses2018-09-14014 September 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses 2023-08-07
[Table view] |
Text
U.S NUCI.EAR REGULATORY COMMISSION OOCKET NUMBER NRC FORM 195 I2 Td)
FILE NUMSER NRC DISTRIBuTION FCR PART 60 DOCKET MATERIAL FROM: OATE OF OOCUMENT TO George Lear Florida Power G Light Co. 7/27/77 Miami, FL OATS RE CE I V E0 R. E. Uhrig 8/3/77 QNOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVEO IcILETTER QORIOINAL ZfUNCLASSIFI EO JPfOP Y OESCRIPTION ENC! OSURE Enclosed additional info requested in NRC ltr of 7/22/77 concerning the recent inspection of facility steam generators.
1p+10p DO NOI REMORSE PLANT NAFZ: Turkey Point Nuclear Pwr Plt NltjjRRb'.lÃm Unit No. 4 RBT 8/3/77 FOR ACTION/INFORMATION ENVIRHNMENTAL ASSIGNED AD. Ve ((ORE LTR BRANCH CHIEF.
MANAGER: PROJECT MANAGER:
EN ING ASSISTANT LICENSING ASSISTANT:
Be HARLESS INTERNAI. OISTRIBUTION
$ SAFETY PLANT SYSTEMS SITE SAFETY &
EVfEMAN TEDESCO ENVIRON ANALYSIS BENAROYA DENTON & MULLER ENGINEERING IPPOLITO ENVIRO TECH PERA G REACTORS B D BAER GAMMILL 2 SITE ANALYSIS VOLLMR BUNCH J ~ COLLINS EXTERNAL OISTR I BUTION CONTROL NUMBER IC NSIC 77>150334 IV J HANCHETT 16 CYS ACRS SKIT CATEGO Y NRC FORM 105 (2 Td)
i'. O. 3GX OI3IOO, tiiiIAMI, FLORIDA 3310)
~gaguft~tory, .File. Gy,':-"
FLORIDA POWER 3i UGHT COMPANY July 27, 1977 L-77-240 CD Director of Nuclear Reactor Regulation Attention: Mr. George Lear, Chief =a Operating Reactors Branch No. 3 Rgf//Igj Division of Operating Reactors Ossa NII I 97/
U. S. Nuclear Regulatory Commission 2 eamis'OISIN
~n Nashington, D. C. 20555 (~ISSIOu
>>oq
~o
Dear Mr. Lear:
Re: Turkey Point Unity Docket Number 50-251
~Su lemental Information Attached herewith is the additional information which was requested in your letter of. July 22, 1977 concerning our recent inspection of Turkey Point Unit No. 4 steam generators.
Very truly yours, Robert E. Uhrig Vice President REU:GDW:sl cc: Norman Mosely Robert Lowenstein 772i50334 HELPING BUILD FLORIDA
RESPONSES TO REQUEST Re~fy~~~t00~
FOR ADDITIONAL INFORMATION TURKEY POINT UNIT 4 The attachment, INVESTIGATION OF ALLEGED MISSING S/G TUBE PLUGS AT TURKEY POINT ~
UNIT 4, supplements responses numbered 1 (a), 1 (b), 1 (c) and 2.
1 (a). What evidence is there that the plugs were not installed' For the 11 tubes in Row 1 where the plugs are "missing",
were the tube ends checked with a ball gauge or by other means to-evaluate whether tube plugs were installed'
RESPONSE
1 (a). The greatest evidence that the plugs were never installed is the fact that an extensive search of the RC System's credible "hide out" locations was performed without locating any plugs (see attachment for detailed description) .
The eleven tube ends'were measured using snap gauges and the data were analyzed by the NSSS supplier. The results were inconclusive (i.e., it could not be determined whether or not plugs were originally in the tubes).
1 (b) . What piping and components were radiographed to check for the plugs? Discuss estimated sensitivity of this method of inspection for detecting a plug.
RESPONSE
1 (b). The pressurizer spray line was the only auxiliary piping judged as a credible plug "hide out" location, and examined using radiography (NOTE: TV camera was used to it was examine portion of the RC loop piping). All bends and horizontal runs of this 4 inch piping were radiographed.
The radiographs showed the line to be void of plugs. For this application, radiography provided excellent sensitivity.
The radiographs show conclusively that plugs are not p esent in the line (radiographs are at the plant site).
1 (c). What areas in the reactor vessel were inspected? Was the lower grid plate inspected? Discuss the method(s) of inspection.
RESPONSE
1 (c) . The reactor vessel was examined extensively using an underwater miniature TV camera (see attachment). This examination included removing all fuel from the vessel.
The lower grid plate was completely inspected using the TV camera. The removal of the fuel allowed complete access to the lower grid plate.
Describe the inspections of the three Unit No. 4 steam generators to determine whether plugs are "missing" tubes that were scheduled to be plugged and whether from'ther
- plugs were installed in tubes that were not scheduled to be plugged. Discuss plans for photographic records of tube plugging operations.
RESPONSE
l (d) . After completing the plugging operations, all 3 steam generator tube sheets were photographed. These photographs were cross referenced with the current tube sheet maps containing the required plugging p'atterns. The results showed that a total of 4 tubes that should have been plugged were missed, and 5 tubes were plugged which were not scheduled to be plugged. These errors apparently resulted from a combination of improper tube identifications and record keeping errors. These errors were corrected by plugging the tubes which had been missed.
Plans for photographic verification of S/G tube plugging have been implemented at Turkey Point. These plans a tubesheet photograph be taken after the, completion-require'hat of any plugging operation. The photographs are then compared to plugging maps to ensure that the desired plugging pattern has been implemented.
Discuss the potential safety implications No. 4 is operated with one or more loose s if Turkey earn Point generator plugs in the system.
RESPONSE
- 2. Safety implications of operating the Unit with loose steam generator plugs are described in APPENDIX A, (PLANT OPERATION WITH LOOSE S/G PLUGS IN THE RCS) included with this submittal.
- 3. Discuss the loose parts monitor which you plan .to install in Turkey Point, Unit No. 4, including the predicted sensitivity for detecting the presence and location of a steam vessel.
generator plug(s) if a plug was in the reactor
RESPONSE
- 3. The metal impact monitoring system which has been installed on Turkey Point Unit No. 4 consists of 3 transducers mounted on the bottom of the reactor vessel (installed on the in-core instrumentation guide tubes) with associated electronics to constitute 3 independent sound monitoring channels. The system provides "hard.
copy" data by recording results for each channel on magnetic tape.
RESPONSE (cont'd.)
- 3. A steam generator tube plug (or object of similar mass),
loose in the reactor vessel, is easily detected by this system. The system's ability to identify the location of an object within the vessel, is expected to be such that the objects'ocation can be determined within several feet.
4 (a) . Provide a summary of the results of the inservice inspection referenced on page 3-2.
RESPONSE
4 (a). The results of the Reg. Guide 1.83 inservice inspection referenced on. page 3-2 are summarized. below:
A total of 12 tubes were plugged as the result of having indications greater than or equal to 40%, the greatest being 47%. The distribution per generator is as follows:
4 tubes in S/G A, 3 tubes in S/G 3, and 5 tubes in S.G C. Of these 12, one was a peripheral tube (R42-C53 S/G C)'. These indications were all located just above the tubesheet and are indicative of slow wall thinning due to residual phosphate effects.
4 (b). Provide a summary of'he tube support plate inspection referred,to on page 3-4. 't
RESPONSE
4 (b). The tube support plate inspection referenced on page 3-4 is summarized below:
This inspection technique utilizes eddy current testing at. 3.5KHz. The capability of this technique is only to identify abnormal TSP intersections. However, the abnormalities can not be specifically identified as cracks or dents.
The data analysis will not be completed until August 1977; however, the available results show that nearly all intersections show an abnormal signal. These results were expected and are consistent with the extensive denting known to exist in the steam generators.
INVEST ATION OF ALLEGED k'ISSIHG S/G T PLUGS AT TURIN.Y POINT UNIT 4 HISTORY OF SHUTDOViat During the Cycle III-IVrefueling shutdown of Unit 4, which commenced on i~ay 9th,,and during a routine entry into steam generator "B" cold leg for eddy current probing of the S/G tubes, one steam generator plug in Row 1 Column 23 was observed to be missing. This plug was logged as being 'explosively plugged in Hovember of 1976. Efforts to locate the alleged missing plug in the steam generator and associated RCS piping were suspended temporarily to enable the core refueling shuffle to start.
The cavity was'flooded (including the steam generators) and the refueling core shuffle took place. After the refueling was completed, steam gen-erator "B" was opened once again to resolve the missing plug issue and mark tubes for preventive plugging. During this entry into "B" steam generator, additional plugs were observed to be missing in the cold leg.
The tubes with missing plugs were all located along the tube sheet in Row 1. Specific locations were Columns 1 through 9, which were logged as being explo'sively plugged in November of 1976. Also, Row 1 Column 31, recorded as plugged in September 1976, did not contain. a plug.
POSSIBLE LOCATIONS OF HXSSWG PLUGS In conjunction with the HSSS supplier, and after revie~ of the documentation and assurances of the people associated with the plugging efforts in September and November o 1976, we examined the possible locations of the plugs in the reactor coolant system (RCS).
The consensus of best engineering judgment was that the plugs could have migrated to only two locations in the reactor coolant system. These locations were (1) the lower portion of the reactor vesse1 (below the shock absorber plate located below the lower internals (2) spray line to the pressurizer. These areas were the focal points of the investigation; however, for addi.tional conservatism, the scope of the search was broadened as described in the following section.
DESCRIPTIOH OF INVESTIGATION OF RCS Visual examinations of the reactor vessel, lower internals, "B" loop cold leg, and thermal shield ledge were conducted by personnel qualified in accordance with a 8 procedure,."Certification of Visual Examination Personnel". These examinations were conducted with remotely operated television viewing systems. The initial phase of the examination consisted of the removal of nine (9) fuel assemblies from the center of the core at locations G-7, G-8, G-9, H-7, H-8, H-9, J-7, J-8, and J-9. A miniature underwater television camera system was utilized to examine the lower internals, the core support plate, and the bottom portion of the reactor vessel. The only foreign material that was observed was fine debris that was later removed by an underwater eductor. At this time, the re-maining fuel assemblies were removed from the core and the television camera was manipulated through various flow holes in the lower core plate to permit examination of the entire lower area of the vessel. The camera was positioned to pe~t viewing of all available areas of the lower internals, lower core support plate, diffuser plate, and casting to de-
,
termine if any plugs were located in any of these locations. No evidence of any plugs or component damage was detected. The thermal shield ledge
DESCRIPTION OF IV<KSTIGATION OF RCS (COVE.)
was inspected bv removing the flange plugs (for access to the material specimens) and lowerins a TV camera. Ho plugs were detected on the ledge.
This extensive examination of the vessel (with all fuel removed) concluded that the plugs were not in the reactor vessel. The decision was then made to thoroughly examine the cold leg piping.
The cold leg piping of loop "B" was examined by the utilization of an under-water camera mounted on an air-operated skate board. This arrangement per-mitted examination of the cold leg piping between the S/G and RCP. Once again, no plugs or foreign objects were observed.
'
The second location that was credible for a plug to "hide-out" was post, ulated to be the spray line from the stean generator to the pressurizer.
All potential "hide-out" locations in the'pipe were radiographed, and the results indicated that there were no plugs in the pipe.
RCP HIDE-OUT POSSIBILITIES The probability that the 6 oz., 775 inch diameter, 6 inch long plug wi11 lodge in the pump is rather remote. The smallest vane-to-vane dimension in the impeller is 4-.1/2 inches, meaning that an. improbable orientation of the plug is required when passing through the impeller (or diffuser) to permit lodging in the vanes. This occurance is judged to be very unlikely, and considering, multiple occurances, is not deemed credible. Impeller seal ring clearances are .025 to .100 inch (assuming some wear) and are, therefore, not large enough for a plug to enter. Since the diffuser exit velocity is 30 fps, it seems most likely that the plug will readily reach the discharge nozzle and'be carried down the pipe. Even assuming the plug could fall to the bottom of the casing after exiting from the diffuser, the water velocity of the bottom of the casing around the casing adapter O.D. is estimated to be 15 fps which would be sufficient to pick up the plug and move it into
,
a higner velocity area near the discharge nozzle from where it could enter the pipe.
CONCLUSIONS The results of the extensive search of the reactor coolant system re-vealing no loose plugs leads to the conclusion that the plugs were never installed, or remotely, that they may be secured somewhere in the reactor coolant system. These two possibilities will be addressed by implementing the following items: 1 PLUGS NEVER INSTALLED (1) Current plugging practices are to be totally reviewed (both 9 and Florida Power & Light) particular with respect to imoroving plug accountability and verification that plugs are properly installed in the correct tubes. Procedures will be revised to incorporate the improved methods.
(2) Permanent documentation of the- "as plugged conditions" will be required at the conclusion of a plugging operation. A photographic method will be utilized to provide the required documentation.
CONCLUSIONS (CONT.)
PLUGS ARE SECURED IN THE RCS (1) A metal impact monitoring system will be installed on the reactor vessel. This. system will detect the presence .of "loose parts" in the vessel. If upon start-up, or during operations, loose parts are detected, then continued operation of the unit will be evaluated. Safety analysis work to address operations with loose
'plugs in the RC System has concluded that the unit can be safely operated with 4 or less loose plugs.
(2) Start-up surveillance requirements will be in effect so that particular attention is given to reactor vessel "noise" monitoring and reactor coolant pump behavior.
Startu Results and Anal sis Prior to running reactor coolant pumps, a Metal impact Monitoring Syst: em was installed on the bottom outside of the reactor vessel.
This system was then set up to monitor and provide a permanent record of any noises caused by loose objects entering the reactor vessel during startup of the reactor coolant pumps. With this monitoring system in effect the pump runs normally made for system venting were performed. The following is a summary of these runs with commentary regarding the noises associated with each run that was heard at the system speaker.
Some limited noise was heard during the individual one minute pump runs and the first eight minute pump runs. During this first eight minute run, the noise went away when the third pump was running. When the second eight minute run was made, the noise was more frequent, and very distinct during the starting and running of th'e first two pumps. When the third pump was started the noise went away. A third eight minute pump run revealed no noise during the entire run.
The results from the first, three pump runs has been analyzed by the NSSS vendor and it has been concluded that there is a single object in the bottom of the reactor vessel. The mass of the object has been estimated to be less than a pound leaving the possibility that it may be a steam generator tube plug. The object did not appear to be migrating rapidly within the bottom of the vessel. Based on the estimated size of the object, the velocity patterns in the bottom of the vessel, and the construc-tion of the vessel internals it is judged that the object has now come to rest in a low flow area in the bottom of the vessel.
The NSSS vendor has further analyzed the potential consequences of operation with the loose object in the reactor vessel and concluded that its presence poses no safety concerns.
SUMMERY During the recent inspections of Turkey Point Unit No. 4 steam generators eleven steam generator tube plugs were discovered to be not inst'alled as indicated by our records. A search of the reactor vessel, reactor coolant system loop piping and other associated piping resulted in none of the plugs being found.
The areas of the system which were not searched were judged by ourselves and our NSSS vendor to be highly unlikely locations for a single plug to be found. Therefore, the possibility of eleven plugs being in these areas was judged to be extremely remote. The results of those inspections were reviewed by ourselves and our vendor and we concluded that the eleven plugs were either not originally installed, or remotely that they may be secured somewhere in the reactor coolant system.
For additional assurance, a metal impact monitoring system was installed on the reactor vessel. The syst: em was used during the plant heatup during various pump running combinations. The evaluation of the results indicates that a single metal object entered the reactor vessel during the heatup and is now dormant, most likely in a low flow area in the bottom of the reactor vessel. This additional information has been evaluated by our NSSS vendor and ourselves and we have concluded, that returning the plant to full power operation does not pose a safety concern.
The following additional actions are being taken or have been taken:
- 1) Current plugging practices are being totally reviewed, with an emphasis on accountability and verification.
- 2) Photographic records .have been taken and will be taken
'following future plugging operations.
- 3) A metal impact monitoring system has been installed..
- 4) Start-up surveillance is in effect.
The Plant Nuclear Safety Committee and the Company Nuclear Review Board have reviewed the situation and have concluded that the unit may be safely returned to full power operation with the MZMS installed.
APPENDIX A PLANT OPERATION WITH LOOSE S/G PLUGS IN THE RGS Plant operation with one or more steam generator tube plugs misplaced in the RCS has been investigated. Potential effects on the plant safety or integrity have been evaluated.
Tube plugs which enter the RCS from the outlet (cold leg) side of the steam generator can remain in the steam generator channel head or be puWed along by the reactor coolant flow through. the crossover leg piping. No measureable impediment to flow is expected by the presence of one or several tube plugs in the flow path. Flow velocity in the piping is sufficient to carry, plugs along to the reactor vessel.
Passage of a plug through a reactor coolant pump during operation was also considered. Westinghouse experience on canned motor pumps in the shop has shown that'if material which is relatively large (compared to the size of the impeller/diffuser vanes), breaks from the system and passes through or lodges in the pump, that the most noticeable effects will be higher vibration level (if an object lodges in a vane of the impeller) and vane denting or gouging, usually very localized. Since in this. case the plug relative size and weight is small, no significant damage to the impeller or diffusez would be expected in the event a plug were to pass through "he pump hydraulics.
A loose plug bounding around the bottom of the casing will have no detri-mental effect on the casing interior surfaces. The casing itself is 7-1/2 inches thick (minimum) stainless'steel and is unclad so there is no problem of cladding abrasion. Furthermore, there is no delicate instrumentation or fragile hardware within the volute which has any chance of being damaged by a moving plug.
Once in the vessel, the plug will follow'the path of the cold water and end up in the lower plenum. The presence of the plug in the lower plenum presents two potential problems. The first aspect considered was the potentiality or loose pieces impacting the lower internals components.
Due to the low velocities present, only insignificant effects of such impacts can be expected. The plugs are too large to enter either the core region or the drive line azea. The chance that the plug will fracture and small pieces will migrate into the core region is believed to be remote due to the shape of the plug and material used (Inconel).
A second potential problem which may occur is wedging of the tube plugs in close clearance areas during start-.up after a cold shutdown. Only one
, area was identified as a potential problem should wedging occur, The identified area is the clearance between the vessel and the secondary core support base plate. Should a plug become wedged between the base plate and vessel during start-up from cold shutdown, the constriction against thermal growth would cause forces to exist, The existance of such forces acting with the normal hydraulic forces could cause movement of the vessel internals. A sensitivity study indicates that for the most con-servative conditions more than four plugs would need to be 'wedged between the vessel and the baseplate. The forces gener ted by any lesser number of wedged plugs will not be large enough to cause movement of the internals.
'
~ ~
PLANT OPERATION WITH LOOSE S/G PLUGS IN THE RCS (COVZ.)
The potential effects of loose'lugs on the fuel performance and integrity were also evaluated. Since it was previously mentioned tQat no plugs could enter the core through the lower internals, no nuclear, thermal, hydraulic, or mechanical concerns exist. Even if plugs were found on the top surface of the core, no nuclear, thermal, hydraulic, or mechanical damages are expected. When operation commences, any plugs on the top of the core would probably be swept down the hot leg and into a channel head where it would come to rest in a low flow area. The clearances between fuel pins and wssemblies are too small to allow movement of a plug into those areas.
As previously demonstrated, only the wedging of a plug between the secondary core support base plate and the vessel is a potential problem of operation with loose. plugs in the RCS, and greater than 4 loose plugs are required to pose a safety concern.