Category:Topic
Jump to navigation
Jump to search
Pages in category "Topic"
The following 200 pages are in this category, out of 379 total.
(previous page) (next page)A
- Abnormal operational transient
- Accident Resistant Fuel
- Accident Tolerant Fuel
- Accident Tolerate Fuel
- Accidental discharge
- Adequate work instructions
- Affidavit
- Aging Management
- Alkalisilica reaction
- Alkali–silica reaction
- Anchor Darling
- Anchor/Darling
- Annual Radioactive Effluent Release Report
- Annual Radiological Effluent Release Report
- Annual Radiological Environmental Operating Report
- ANS Design Report
- Anticipated operational occurrence
- Appropriate quantitative or qualitative guidance
- Appropriate work instructions
- Arc flash
- Atmospheric Relative Concentration Values
- Authorized possession limits
- AutoPIPE
B
C
- Cable Tray Ignition
- Channel to control blade interference
- Channel-control blade interference
- Chernobyl
- Coast down
- Coatings
- Code Reconciliation
- Cold shutdown justification
- Commercial Grade
- Commercial Grade Dedication
- Condition Adverse to Quality
- Containment Hardened Vent
- Containment high range radiation monitor
- Contingency analyzer
- Continuous basket shim
- Continuous fire watch
- Contraband
- Control of Heavy Loads
- Control Room Habitability
- Core exit thermocouple
- Core Exit Thermocouple
- Core Exit Thermocouple Nozzle Assembly
- Coronavirus
- Corrosion bonding
- COVID-19
- COVID19
- CRD Blade interference
- Cyber attack
- Cyber Security
- Cyber security attack
D
E
F
- Failure to Scram
- Fast acting solenoid valve
- Fatality
- Fatigue Rule
- Feedwater Controller Failure
- Feedwater Heater
- Final Significance Determination of a White Finding
- Finite Element Analysis
- Fire Barrier
- Fire impairment
- Fire Protection Program
- Fire Watch
- Fish deterrent system
- Fitness for Duty
- FLEX
- Flood Hazard Mitigation Strategies Assessment
- Flooding Focused Evaluation
- Flow Accelerated Corrosion
- Flow Induced Vibration
- Foreign Material Exclusion
- Frazil ice
- Fuel cladding
- Fukushima Dai-Ichi
- Functionality Assessment
G
H
I
- Idle speed run
- Inactive license
- Inadvertent Activation of a Siren
- Inadvertent Emergency Notification Siren Actuation
- Inadvertent Emergency Siren Activation
- Inadvertent Single Emergency Siren Activation
- Inadvertent Siren Activation
- Inadvertent siren activation
- Inattentive
- Incorporated by reference
- Incremental Core Damage Probability Deficit
- Integrated leak rate test
- Integrated Public Alert and Warning System
- Intergranular Stress Corrosion Cracking
- Internal Flooding
L
- Large early release frequency
- Leak Before Break
- Leak before break
- Leak-Before-Break
- Letter of Concern
- License Renewal
- Liquid penetrant
- Local Leak Rate Testing
- Locked High Radiation Area
- Locktite
- Loctite
- Loop seal
- Loss of condenser vacuum
- Loss of Offsite Power
- Low Safety Significance Issue Resolution
M
- Machine learning
- Magnesium Rotor
- Main Steam Line Radiation Monitor
- Main transformer failure
- Maintenance Rule Program
- Management Oversight and Risk Tree
- Manual Operator Action
- Measurement Uncertainty Recapture
- MELLLA
- Met Tower
- Metamic
- Microbiologically influenced corrosion
- Minimum staff
- Missed commitment
- Missed surveillance
- Mission time
- Moisture barrier
- Moisture Density Gauge
- Moisture-Density Gauge
- Moisture/Density Gauge
- Multiple Spurious Operation
- Mururoa