Waterford Unit 3 - Acceptance of Requested Licensing Action License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event
ML18099A096
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/09/2018
From: April Pulvirenti
Plant Licensing Branch IV
To: Zamber M
Entergy Nuclear Operations
References
Download: ML18099A096 (3)


Text

NRR-DMPSPEm Resource From: Pulvirenti, April Sent: Monday, April 9, 2018 8:09 AM To: Zamber, Maria Cc: Pascarelli, Robert

Subject:

SUBJECT:

WATERFORD UNIT 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE:

LICENSE AMENDMENT REQUEST TO UPDATE THE RESULTS FOR THE INADVERTENT LOADING OF A FUEL ASSEMBLY INTO THE IMPROPER POSITION (FUEL ASSEMBLY MISLOAD) EVENT

SUBJECT:

WATERFORD UNIT 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO UPDATE THE RESULTS FOR THE INADVERTENT LOADING OF A FUEL ASSEMBLY INTO THE IMPROPER POSITION (FUEL ASSEMBLY MISLOAD) EVENT

Maria, By letter dated March 8, 2018 (ADAMS Accession No. ML18068A705), Entergy, the licensee, submitted a license amendment request to the Technical Specifications (TS) for Waterford 3 to update the results for Fuel Assembly Misload Event.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications.

Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 8, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated during the routine interactions with the assigned project manager.

1

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of the scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact the Waterford 3 Project Manager, April Pulvirenti, at (301)-415-1390.

Dr. April Pulvirenti Project Manager, Waterford NRR/DORL/LPL4 OWFN 09F04B 301-415-1390 2

Hearing Identifier: NRR_DMPS Email Number: 278 Mail Envelope Properties (April.Pulvirenti@nrc.gov20180409080800)

Subject:

SUBJECT:

WATERFORD UNIT 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO UPDATE THE RESULTS FOR THE INADVERTENT LOADING OF A FUEL ASSEMBLY INTO THE IMPROPER POSITION (FUEL ASSEMBLY MISLOAD) EVENT Sent Date: 4/9/2018 8:08:37 AM Received Date: 4/9/2018 8:08:00 AM From: Pulvirenti, April Created By: April.Pulvirenti@nrc.gov Recipients:

"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Zamber, Maria" <mzamber@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3643 4/9/2018 8:08:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: