ML18153C398

From kanterella
Revision as of 23:18, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Updated Tech Spec Page 6.1-2 to Be Inserted in Place of Previously Submitted Page
ML18153C398
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/12/1990
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153C397 List:
References
NUDOCS 9010240373
Download: ML18153C398 (1)


Text

. .

' " \.

e TS 6.1-2 B. The facility organization shall conform to the following requirements:

1. Each member of the facility staff shall meet or exceed the minimum qualifications of ANS-3.1 (12/79 Draft)* for comparable positions, and the supplemental requirements specified in the March 28, 1980 NRC letter to all licensees, except:
a. The Superintendent - Health Physics shall meet or exceed the qualification of Regulatory Guide 1.8, September 1975.
b. The Superintendent - Operations shall hold (or have previously held) a Senior Reactor Operator License for Surry Power Station or a similar design Pressurized Water Reactor plant.

C. The Supervisor Shift Operations shall hold an active Seniorl Reactor Operator License for Surry Power Station.

2. The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.
3. The Station Manager is responsible for ensuring that retraining and replacement training programs for the facility staff are maintained and that such programs meet or exceed the requirements and recommendations of Section 5 of ANS-3.1 (12/79 Draft)* and Appendix "A" of 1O CFR Part 55 and the supplemental requirements specified in the March 28, 1980 NRC letter to all licensees, and shall include familiarization with relevant industry operational experience identified by the SEC Staff.
4. Each on-duty shift shall be composed of at least the minimum shift crew composition for each unit as shown in Table 6.1-1.
5. A health physics technician shall be on site when fuel is in the reactor.
6. All core alterations shall be observed and directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
  • Exceptions to this requirement are specified in Virginia Power's QA Topical Report, VEP-1, "Quality As.surance Program, Operational Phase"

\

I I

I