ML19249B974
From kanterella
Revision as of 07:38, 8 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML19249B974 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 08/29/1979 |
From: | Kerlin T ANALYSIS & MEASUREMENT SERVICES CORP. |
To: | |
Shared Package | |
ML19249B970 | List: |
References | |
NUDOCS 7909070168 | |
Download: ML19249B974 (126) | |
Similar Documents at Millstone | |
---|---|
Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20207D8781998-12-0808 December 1998
[Table view]Rev 1 to EMF-98-015, Millstone Unit 2 Loss of Normal FW Flow Transient with Reduced Auxiliary FW Flow ML20217J0691997-08-31031 August 1997 Non-proprietary Rev 5 to WCAP-10992, Westinghouse Setpoint Methodology for Protection Systems,Mnps,Unit 3,24-Month Fuel Cycle Evaluation ML20148P1771997-02-28028 February 1997 Rev 0 to Millstone Unit 2 Uncontrolled CEA Bank Withdrawal from Subcritical/Startup Analysis ML20086S3221995-06-30030 June 1995 Rev 4 to WCAP-10992, W Setpoint Methodology for Protection Systems,Millstone Nuclear Power Station Unit 3 24 Month Fuel Cycle Evaluation ML20080T8361995-01-0303 January 1995 Physics Methodology for PWR Reload Design, Addendum 4 ML20086H4721991-11-30030 November 1991 Analysis of Capsule W-104 Northeast Nuclear Energy Co Millstone Nuclear Power Station,Unit 2 - Reactor Vessel Matl Surveillance Program ML20095L4291991-10-31031 October 1991 Nonproprietary Margin to Overfill Analysis for SGTR for Millstone Nuclear Power Station Unit 3 Three-Loop Operation ML20095L4171991-08-31031 August 1991 Nonproprietary Margin to Overfill Analysis for Stgr for Millstone Nuclear Power Station Unit 3 Four-Loop Operation ML20058F8961990-08-31031 August 1990 Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Millstone 3 Nuclear Power Station ML20058F1081990-04-30030 April 1990 RHR Autoclosure Interlock Removal at Millstone Unit 3 ML20195E4851988-10-25025 October 1988 Milllstone Unit 2 Plant Transient Analysis Rept Analysis of Chapter 15 Events ML20154N5621988-09-30030 September 1988 Plant Transient Analysis Rept,Analysis of Chapter 15 Events ML20155D4281988-09-30030 September 1988 Safety Evaluation Supporting More Negative End-of-Life Moderator Temp Coefficient Tech Spec for Millstone Unit 3 ML20149G5621988-01-31031 January 1988 Nonproprietary Evaluation of Margin to Steam Generator Overfill for Millstone Unit 3 ML20236Q4031987-10-30030 October 1987 Addendum 2 to Physics Methodology for PWR Reload Design ML20238F0331987-06-30030 June 1987 Nonproprietary Resistance Temp Detector Bypass Elimination Licensing Rept for Millstone Unit 3 ML20196J4341986-11-30030 November 1986 Boric Acid Concentration Reduction Effort,Technical Bases & Operational Analysis ML20210A6051986-09-0505 September 1986 Addendum a to Vol II of Nusco 140-2, Nusco Thermal Hydraulic Model Qualification ML20235J4861986-07-31031 July 1986 Summary Rept,Fire Protection Qualification Testing of Silicon Dioxide Mineral Insulated Cable ML20137S5931985-11-30030 November 1985 Westinghouse Setpoint Methodology for Protection Sys, Millstone Nuclear Power Station Unit 3. W/Six Oversize Tables ML20205N4491985-11-30030 November 1985 Nonproprietary Westinghouse Setpoint Methodology for Protection Sys,Millstone Nuclear Power Station Unit 3. W/ Revised Cover Page.Two Oversize Figures Encl ML20133B2721985-10-0101 October 1985 ASEA-Atom BWR Control Blades for Us Bwrs ML20099L0361984-09-30030 September 1984 Evaluation of Acceptability of Reactor Vessel Head Lift Rig,Reactor Vessel Internals Lift Rig,Load Cell & Load Cell Linkage to Requirements of NUREG-0612 ML20098B0251984-06-30030 June 1984 Nonproprietary Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Millstone Unit 3 ML20077N9741983-07-31031 July 1983 Steam Generator Sleeving Rept ML20074A1061983-03-31031 March 1983 Shape Annealing Factor Component of Axial Shape Index Uncertainty ML20079G5361982-04-30030 April 1982 Post-Irradiation Evaluation of Reactor Vessel Surveillance Capsule W-97 ML20039F8631981-12-31031 December 1981 Evaluation of Pressurized Thermal Shock Effects Due to Small Break LOCA W/Loss of Feedwater for Millstone 2 Reactor Vessel. B12413, Point Nuclear Power Station,Unit 1 Single-Loop Operation1980-12-31031 December 1980 Point Nuclear Power Station,Unit 1 Single-Loop Operation ML19249B9741979-08-29029 August 1979 Response Time Qualification of Resistance Thermometers in Nuclear Power Plant Safety Sys. ML20002A1081979-05-0202 May 1979 Sleeved CEA Guide Tube Eddy Current Test Results. ML20062G3871978-12-14014 December 1978 Sleeved Guide Tube Inspec Prog, CEN-104(N)-NP.Describes Inspec Prog to Show Performance Re Wear.Edited to Delete Info W/Held from Pub Disclosure IAW 10CFR2.790 1998-12-08 Category:TEXT-SAFETY REPORT MONTHYEARML20217P5391999-10-25025 October 1999
[Table view]Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19249B974&oldid=1894158"