Final Model Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 2)
ML19176A190
Person / Time
Site: Technical Specifications Task Force
Issue date: 08/14/2019
From: Victor Cusumano
NRC/NRR/DSS
To:
Technical Specifications Task Force
Honcharik M, 301-415-1774, NRR/DSS
Shared Package
ML19176A188 List:
References
EPID L-2018-PMP-002, TSTF-569, Rev 2
Download: ML19176A190 (8)


Text

General Directions: This Model safety evaluation (SE) provides the format and content to be used when preparing the plant-specific SE of a license amendment request to adopt TSTF-569, Revision 2. The bolded bracketed information shows text that should be filled in for the specific amendment; individual licensees would furnish site-specific nomenclature or values for these bracketed items. The italicized wording provides guidance on what should be included in each section and should not be included in the SE. for Westinghouse-designed plants use:OR for CE-designed plants use:

OR Federal Register

OR

{NOTE: this may be used interchangeably with the phrase 'pressure transmitter' within this SE due to the usage of these terms in TSTF-569, Revision 2.}

{NOTE: For Westinghouse-designed plants use:}

, , . {NOTE: For CE-designed plants use:} **

, .

, .

Insert description of any variations here.

Code of Federal Regulations

{NOTE: Choose applicable STS}

For CE plants: OR for Westinghouse plants:

{This section is to be prepared by the plant project manager.}

{This section is to be prepared by the plant project manager in accordance with current procedures.}

{This section is to be prepared by the plant project manager.}