ML003716758

From kanterella
Revision as of 11:22, 14 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron
ML003716758
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML003716758 (6)


Text

JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE:

SYSTEM/DUTY AREA

Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE RO:

3.7 SRO:

3.5 KA

REFERENCE:

010 A4.01 APPROVED FOR ADMINISTRATION TO

RO: X SRO:

X TASK LOCATION

INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE

SIMULATOR:

Perform LAB:

POSITION EVALUATED

RO:

SRO:

ACTUAL TESTING ENVIRONMENT

SIMULATOR:

X PLANT SITE:

LAB:

TESTING METHOD

SIMULATE:

PERFORM:

X APPROXIMATE COMPLETION TIME IN MINUTES

6 Minutes REFERENCE(S):

OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME

SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time

Stop Time

Total Time SIGNED__________________________________

DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS

100% Power Operation.

A power escalation has been completed.

Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.

TASK STANDARD

Spray Valve (2CV-4651)isolated.

THIS IS AN ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS

OP 2103.005 section 7.0 and AOP 2203.028.

SIMULATOR SETUP

Run CASE FILE JPM03. This will open 'A' spray valve 100% and trip the breaker when the valve indicates intermediate position.

The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):

Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.

T5 2CV-4651_

a value = 1.0 T5 2HS-4651-3 false (green light)

T5 2 HS-4651-5 false (red light)

JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP 'A' spray valve, 2CV-4651." CRITICAL ELEMENTS (C)

2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.Verify spray valve, 2CV

-4651, isolation valves 2CV

-4655 AND 2CV-4656 are OPEN.

On panel 2C04 verified red lights ON, green lights OFF for 2CV

-4655 and 2CV-4656. N/A SAT UNSAT (C)2.Place RCP 'A' spray valve MAN/AUTO select switch

(2HS-4651B) to MANUAL.On panel 2C04, rotated 2HS

-4651B in the CCW direction to MANUAL. N/A SAT UNSAT (C)3.Energize all available Backup Heaters.On panel 2C04 placed the following handswitches to ON:

Place 2HS-4643 to ON

Place 2HS-4644 to ON

Place 2HS-4645 to ON

Place 2HS-4646 to ON

AND Observed the red light ON and green light OFF above each of the

above backup heater handswitches.

N/A SAT UNSAT EXAMINER'S NOTE:

When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.(C)4.Open 2CV-4651, RCP 'A' spray valve partially.

On panel 2C04 WHEN RCS pressure starts increasing, throttled 2CV

-4651 to the open position.

N/A SAT UNSAT EXAMINER'S NOTE:

The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.

JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)5.Close PZR Spray Block Valves.

On panel 2C04, placed handswitch for 2CV-4655 and 2CV-4656 to "CLOSE".Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-

4656. N/A SAT UNSAT END JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION: ANSWER:

JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:

100% Power Operation.

A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.

INITIATING CUE:

The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP 'A' spray valve, 2CV-4651

."