MONTHYEARML22224A1902022-08-12012 August 2022 Notification of NRC Initial Operator Licensing Examination 05000368/2023301 ML0619503772006-01-12012 January 2006 1-2006 - Draft Written Exam Comments ML0037167442000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging Pump ML0037166572000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin JPM A-1-2 ML0037166622000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin RO JPM A-1-1 ML0037166662000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-1-1 ML0037166722000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-4 ML0037166772000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM A-2 ML0037167372000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity Feed ML0037167422000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75 ML0037167472000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit Breaker ML0037167502000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally Manually ML0037167522000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct Test ML0037167582000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron ML0037167602000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPs ML0037167622000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps ML0037255901999-12-19019 December 1999 ANO, Unit 1, Initial Examinations, Draft Operating Submittal 2022-08-12
[Table view] Category:Draft
MONTHYEARML22224A1902022-08-12012 August 2022 Notification of NRC Initial Operator Licensing Examination 05000368/2023301 ML0619503772006-01-12012 January 2006 1-2006 - Draft Written Exam Comments ML0423000682004-09-0101 September 2004 Section 3.0, Aging Management Reviews Results - ANO-2 SER Final Draft W/Open and Confirmatory Items ML0423000912004-09-0101 September 2004 Section 3.1, Aging Management of Reactor Vessel, Internals, and Reactor Coolant System - ANO-2 SER Final W/Open and Confirmatory Items ML0423001282004-09-0101 September 2004 Section 3.2, Aging Management of Engineered Safety Features Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001342004-09-0101 September 2004 Section 3.3, Aging Management of Auxiliary Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001482004-09-0101 September 2004 Section 3.4, Aging Management of Steam and Power Conversion Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001532004-09-0101 September 2004 Section 3.5, Aging Management of Structures and Component Supports - ANO-2 SER Final W/Open and Confirmatory Items ML0423001572004-09-0101 September 2004 Section 3.6, Aging Management of Electrical and Instrumentation and Controls - ANO-2 SER Final W/Open and Confirmatory Items ML0037166722000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-4 ML0037166572000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin JPM A-1-2 ML0037166622000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin RO JPM A-1-1 ML0037166662000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-1-1 ML0037166772000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM A-2 ML0037167372000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity Feed ML0037167422000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75 ML0037167442000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging Pump ML0037167472000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit Breaker ML0037167502000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally Manually ML0037167522000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct Test ML0037167582000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron ML0037167602000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPs ML0037167622000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps ML0037255901999-12-19019 December 1999 ANO, Unit 1, Initial Examinations, Draft Operating Submittal 2022-08-12
[Table view] |
Text
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 1 of 6 SYSTEM/DUTY AREA:
Stator Water Cooling System
TASK: Shift Stator Water Cooling Pumps
JTA #: None
KA VALUE RO: 3.9 SRO: 3.4 KA
REFERENCE:
045 2.1.30
APPROVED FOR ADMINISTRATION TO:
NLO: X RO: X SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
LAB:
POSITION EVALUATED:
NLO:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
X LAB:
TESTING METHOD:
SIMULATE: X PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
5 minutes
REFERENCE(S):
OP 2106.004 Rev.012-01-0 EXAMINEE'S NAME:
SSN:
-
-
EVALUATOR'S NAME:
DATE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
__________
Start Time
__________
Stop Time__________
Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED:
DATE:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS:
Predictive maintenance would like to take vibration readings on "B" stator water cooling pump (2P-25B). 2P-25A is running.
TASK STANDARD:
2P-25A has been started and 2P
-25B has been secured.
TASK PERFORMANCE AIDS:
OP 2106.004, Section 7.2
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 3 of 6 INITIATING CUE:
The SS/CRS directs, "Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2."
CRITICAL ELEMENTS (C):
1, 2
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)1.Place 2P-25A/B select switch (2HS-9784) to B-RUN A-RES.
POSITIVE CUE
- For 2P-25B, red light on; green light off.
NEGATIVE CUE:
For 2P-25B, green light on; red light off.
On panel 2C140, rotated 2HS
-9784 CCW to "B-RUN A-RES".
Observed 2P
-25B pump indication red light on; green light off.
N/A SAT UNSAT (C)2.Push the Reserve Coolant Pump Cutout pushbutton.
POSITIVE CUE
- For 2P-25A, green light on; red light off.
NEGATIVE CUE:
For 2P-25A, red light on; green light off.
At panel 2C140, pushed the Reserve Coolant Pump Cutout pushbutton.
Observed the 2P
-25A pump running status lights.
N/A SAT UNSAT 3.Verify the following readings are normal: - Pump discharge pressure (2PI-9799) - Stator Inlet Flow (2FIS-9722) - Stator Inlet Pressure (2PI-9798)
POSITIVE CUE:
2PI-9799 shows 120 psig.
2FIS-9722 shows between 510 and 525 gpm.2PI-9798 shows 60 psig.
Verified pressures and flow to be normal. N/A SAT UNSAT JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 4 of 6 PERFORMANCE CHECKLIST STANDARDS (Circle One) 4.Notify control room of pump shift and pump status.
Using the plant telephone, notified the control room that 2P
-25B is running. N/A SAT UNSAT END STOP TIME:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 5 of 6 Question: Answer:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 6 of 6 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Predictive maintenance would like to take vibration readings on "B" stator water cooling pump (2P-25B). 2P-25A is running.
INITIATING CUE:
The SS/CRS directs, "Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2."