ML063040418

From kanterella
Revision as of 09:34, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Acceptance for Review of Topical Report No. NEI 06-14, Quality Assurance Program Description, Nuclear Energy Institute, Revision 0 (Project No. 689)
ML063040418
Person / Time
Site: Nuclear Energy Institute
Issue date: 11/22/2006
From: Stephanie Coffin
NRC/NRO/DNRL/AP1000B1
To: Heymer A
Nuclear Energy Institute
Starefos, Joelle,NRR/ADRA/DNRL,415-8488
References
Download: ML063040418 (6)


Text

November 22, 2006Adrian P. Heymer, Senior DirectorNew Plant Deployment Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, QUALITYASSURANCE PROGRAM DESCRIPTION, NUCLEAR ENERGY INSTITUTE, REVISION 0 (PROJECT NO. 689)

Dear Mr. Heymer,

By letter dated October 19, 2006, the Nuclear Energy Institute (NEI) submitted for U.S. NuclearRegulatory Commission (NRC) staff review, its proposed Quality Assurance Program Description, Revision 0. By letter dated October 27, 2006, NEI designated this program as NEI 06-14. The NRC staff has performed an acceptance review of NEI 06-14, Revision 0, and found that the material presented is sufficient to begin our comprehensive review. The staff expects to issue a request for additional information (RAI) letter by December 8, 2006, and issue its safety evaluation report by February 28, 2007. The staff estimates that this review will require approximately 250 staff hours including project management time. The review schedule milestones and estimated costs were discussed in a telephone call with Jim Fisicaro of your staff on October 30, 2006, wherein, it was agreed that NEI would respond to the staff's RAI letter within 30 days barring complications.Section 170.21 of Title 10 of the Code of Federal Regulations requires that topical reports aresubject to fees based upon the full cost of the review. You did not request a fee exemption; therefore, staff hours and the contractor cost, if applicable, will be billed accordingly.Sincerely/RA/Stephanie M. Coffin, ChiefAP1000 Projects Branch 1 Division of New Reactor Licensing Office of New ReactorsProject No. 689 cc: See next page

ML063040418OFFICEDNRL/NWE1:LADNRL/NWE1:PMEQVADNRL/NWE1:BCNAMEMVieraJStarefosDThatcherSCoffinDATE11/14/0611/15/0611/15/0611/22/06 Letter to A .P. Heyman from S. M. Coffin, dated November 22, 2006.

SUBJECT:

ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, QUALITYASSURANCE PROGRAM DESCRIPTION, NUCLEAR ENERGY INSTITUTE, REVISION 0 (PROJECT NO. 689)DISTRIBUTION

PUBLIC NRR_DNRL Carol A bbott, NRR (CFA@nrc.gov

)Randolph Blough, RI (ARB@nrc.gov

)James Caldwell, RIII (JLC1@nrc.gov

)Charles Casto, RII (CAC1@nrc.gov

)Dwight Chamberlain, RIV (DDC@nrc.gov

)Samuel Collins, RI (SJC1@nrc.gov

)Marc Dapas, RI (MLD1@nrc.gov

)Marsha Gamberoni, RI (MKG@nrc.gov

)Geoffrey Grant, RIII (GEG@nrc.gov

)Pat Gwynn, RIV (TPG@nrc.gov

)Brian Holian, RI (BEH@nrc.gov

)Art Howell, RIV (ATH@nrc.gov

)Mark Lesser, RII (MSL1@nrc.gov

)Bruce Mallett, RIV (BSM1@nrc.gov

)Victor McCree, RII (VMM@nrc.gov

)Cynthia Pederson, RIII (CDP1@nrc.gov

)Loren Plisco, RII (LRP@nrc.gov

)Mark Satorius, RIII (MAS@nrc.gov

)William Travers, RII (WDT@nrc.gov

)Kathryn Winsberg, OGC (KLW@nrc.gov

)

Combination List:cc:Mr. Charles BrinkmanWestinghouse Electric Co.

Washington Operations 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852Mr. David Lochbaum, Nuclear Safety EngineerUnion of Concerned Scientists 1707 H Street, NW, Suite 600 Washington, DC 20006-3919Mr. Paul GunterNuclear Information & Resource Service

1424 16 th Street, NW, Suite 404Washington, DC 20036Mr. James RiccioGreenpeace 702 H Street, NW, Suite 300 Washington, DC 20001Mr. Jim FisicaroNuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708Mr. George Alan ZinkeProject Manager Nuclear Business Development Entergy Nuclear M-ECH-683 1340 Echelon Parkway Jackson, MS 39213Ms. Marilyn KrayVice President, Special Projects Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348Mr. Laurence ParmeManager, GT-MHR Safety & Licensing General Atomics Company P.O. Box 85608 San Diego, CA 92186-5608Mr. Joseph D. HegnerLead Engineer - Licensing Dominion Generation Early Site Permitting Project 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Edward L. QuinnLongenecker and Associates Utility Operations Division 23292 Pompeii Drive Dana Point, CA 92629Mr. Paul LeventhalNuclear Control Institute 1000 Connecticut Avenue, NW Suite 410 Washington, DC 20036Mr. Jay M. GutierrezMorgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004Mr. W. Edward CumminsAP600 and AP1000 Projects Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355Mr. Gary Wright, ManagerOffice of Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive Springfield, IL 62704Mr. Brendan HoffmanResearch Associate on Nuclear Energy Public Citizens Critical Mass Energy and Environmental Program 215 Pennsylvania Avenue, SE Washington, DC 20003Mr. Lionel BattyNuclear Business Team Graftech 12300 Snow Road Parma, Ohio 44130 Mr. Ian M. GrantCanadian Nuclear Safety Commission 280 Slater Street, Station B P.O. Box 1046 Ottawa, Ontario

K1P 5S9Mr. Glenn H. ArchinoffAECL Technologies 481 North Frederick Avenue Suite 405 Gaithersburg, MD. 20877Dr. Regis A. MatzieSenior Vice President and Chief Technology Officer Westinghouse Electric Company 2000 Day Hill Road Windsor, CT 06095-0500Mr. Ed Wallace, General ManagerProjects PBMR Pty LTD PO Box 9396 Centurion 0046 Republic of South AfricaMr. Dobie McArthurDirector, Washington Operations General Atomics 1899 Pennsylvania Avenue, NW, Suite 300 Washington, DC 20006Mr. Russell BellNuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708Ms. Vanessa E. Quinn, ChiefRadiological Emergency Preparedness Branch Nuclear and Chemical Preparedness and Protection Division Department of Homeland Security 1800 South Bell Street, Room 837 Crystal City-Arlington, VA 22202-3546Mr. Ron Simard6170 Masters Club Drive Suwanee, GA 30024Ms. Anne W. CottinghamAssistant General Counsel Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006Mr. David RepkaWinston & Strawn LLP 1700 K Street, NW Washington, DC 20006-3817Mr. Robert E. SweeneyIBEX ESI 4641 Montgomery Avenue Suite 350 Bethesda, MD. 20814Mr. Eugene S. GrecheckVice President, Nuclear Support Services Dominion Energy, Inc.

5000 Dominion Blvd.

Glen Allen, VA 23060 E-mailTom Miller (tom.miller@nuclear.energy.gov

)Mark Beaumont (mark.beaumont@wsms.com

)S. Frantz (sfrantz@morganlewis.com

)K. Sutton (ksutton@morganlewis.com

)J. Gutierrez (jgutierrez@morganlewis.com

)Sandra Sloan (sandra.sloan@areva.com

)M. Wetterhahn (mwetterhahn@winston.com

)Guy Cesare (gcesare@enercon.com

)W. Horin (whorin@winston.com

)(erg-xl@cox.net

)Louis Quintana (louis.quintana@ge.com

)Steve Hucik (steven.hucik@ge.com

)David Hinds (david.hinds@ge.com

)Chris Maslak (chris.maslak@ge.com

)M. Giles (mgiles@entergy.com

)Patricia Campbell (patriciaL.campbell@ge.com

)Bob Brown (bob.brown@ge.com

)Peter Hastings (pshastings@duke-energy.com

)Ronald Hagen (ronald.hagen@eia.doe.gov

)Murawski (murawski@newsobserver.com

)Cary Fleming (Cary.Fleming@constellation.com

)Tansel Selekler (tansel.selekler@nuclear.energy.gov

)T. R. Smith (trsmith@winston.com

)James Beard (james1.beard@ge.com

)Rod Krich (rod.krich@constellation.com

)George Wrobel (george.wrobel@constellation.com

)Barbara Lee-Murphy (barbara.lee-muphy@constellation.com

)Tyson Smith (trsmith@winston.com

)