ML091050630

From kanterella
Revision as of 01:13, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Examination 05000368/200930205000368/2009302
ML091050630
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/14/2009
From: Ryan Lantz
Operations Branch IV
To: Mitchell T
Entergy Operations
References
IR-09-302
Download: ML091050630 (5)


See also: IR 05000368/2009302

Text

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125

April 14, 2009

Kevin Walsh, Vice President, Operations

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S.R. 333

Russellville, AR 72802

SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000368/2009302

Dear Mr. Mitchell:

In a telephone conversation on March 16, 2009, between Messrs. Clay Simpson, Operations

Training Superintendent, and Brian Larson, Chief Examiner, arrangements were made for the

administration of licensing examinations at Arkans

as Nuclear One, Unit 2, during the week of

August 10, 2009.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power

Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for

Nuclear Power Plant Operators," Revision 2, Supplement 1. The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered.

To meet the above schedule, it will be necessary

for your staff to furnish the examination

outlines by May 22, 2009. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by June 19, 2009. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. We request that any

personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and

appropriately marked. Any delay in receiving the required examinations and reference

materials, or the submittal of inadequate or incomplete materials, may cause the examinations

to be rescheduled. In addition, your support for on-site validation of the examinations is

required during the week of July 6, 2009.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

Entergy Operations, Inc. - 2 -temperatures, and levels) generated during the dy

namic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your

staff should submit preliminary operator and

senior operator license applications (Office

of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approv

al number 3150-0024), and waiver requests (if

any)(OMB approval number 3150-0090) at least 30 day

s before the first examination date. If

the applications are not received at least 30

days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the

Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC's Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRC's public Web site at

http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Simpson has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Larson at 817-860-8172, or myself

at 817-860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Entergy Operations, Inc. - 3 - Division of Reactor Safety

Docket: 50-368

License: NPF-6

DISTRIBUTION:

Senior Vice President

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Vice President, Oversight

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Manager, Licensing

Entergy Operations, Inc.

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802

Associate General Counsel

Entergy Nuclear Operations

P. O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety & Licensing

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Chief, Radiation Control Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Section Chief, Division of Health

Emergency Management Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Entergy Operations, Inc. - 4 - David E. Maxwell, Director

Arkansas Department of Emergency Management

Bldg. 9501

Camp Joseph T. Robinson

North Little Rock, AR 72199

Pope County Judge

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

ML091050630

Entergy Operations, Inc. - 5 -Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Jeffrey.Josey@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) ANO Site Secretary (Vicki.High@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

K. S. Fuller, RC

OEMail Resource

Senior Enforcement Specialist (Mark.Haire@nrc.gov)

ML091050630

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials

BTL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials

BTL SOE:OB C:OB BTLarson RELantz /RA/ /RA/ 04/09/09 04/14/09 OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax