Letter Sequence Approval |
---|
|
|
MONTHYEARML0828403612008-10-10010 October 2008 Status of Regulatory Framework for the Completion of Operating License Review (Tac MD9424) Project stage: Other ML0902101072009-02-11011 February 2009 Status of Regulatory Framework for the Completion of Corrective Action and Special Programs and Unresolved Safety Issues Project stage: Other ML0911201832009-04-0606 April 2009 Unit 2 - Additional Information Regarding WBN Unit 2 Corrective Action Programs Project stage: Other ML0919601122009-07-10010 July 2009 Unit 2 - Additional Information Regarding WBN Unit 2 Corrective Action Programs Project stage: Other ML0923207072009-09-0808 September 2009 Unit 2 - Safety Evaluation Input Regarding Quality Assurance Records Corrective Action Program (Tac No. ME2168) Project stage: Approval ML0923209142009-09-0909 September 2009 Safety Evaluation Input Regarding Replacement Items Corrective Action Program (Tac No. ME2168) Project stage: Approval ML0926100672009-09-15015 September 2009 Additional Information Regarding Replacement Items Corrective Action Program Project stage: Other ML1109803062011-04-0101 April 2011 Bellefonte Nuclear Plant (Bln), Units 1 (CPPR-122) and 2 (CPPR-123) - Quality Verification Program Project stage: Other ML14064A3602014-02-20020 February 2014 Revision of Commitment - Safety Evaluation Input Regarding Quality Assurance Records - Corrective Action Program Project stage: Other 2009-09-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Safety Evaluation
MONTHYEARML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 – Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 – Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants 2024-08-27
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 September 8, 2009 Mr. Ashok Bhatnagar Senior Vice President Nuclear Generation Development and Construction 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 WATTS BAR NUCLEAR PLANT, UNIT 2 -SAFETY EVALUATION INPUT REGARDING QUALITY ASSURANCE RECORDS CORRECTIVE ACTION PROGRAM (TAC NO. ME2168)
Dear Mr. Bhatnagar:
By letter dated January 29,2008 (ADAMS Accession No. ML080320443), as supplemented by letters dated September 26, 2008 (ADAMS Accession No. ML082750019), and July 10, 2009 (ADAMS Accession No. ML091960112), the Tennessee Valley Authority (TVA) submitted an application for approval of the Quality Assurance Records Corrective Action Program for Watts Bar Nuclear Plant, Unit 2. The staff has reviewed TVA's application including the supplemental letters and find them acceptable.
Enclosed is the staff's safety evaluation completing the staff's efforts for TAC No. ME2168. If you have any questions regarding this issue, please feel free to contact John G. Lamb at (301) 415-3100.
Sincerely, Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
As stated UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING THE QUALITY ASSURANCE RECORDS CORRECTIVE ACTION PROGRAM TENNESSEE VALLEY AUTHORITY (TVA) WATTS BAR NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-391
1.0 INTRODUCTION
The Watts Bar Nuclear Performance Plan (WBNPP) was submitted to the U. S. Nuclear Regulatory Commission (NRC) by Tennessee Valley Authority (TVA) letter dated May 27, 1988 (Agency Document and Management System Accession Number ML080390551).
The NRC staff documented its review and findings concerning the WBNPP in NUREG-1232, Volume 4, "Safety Evaluation Report on Tennessee Valley Authority:
Watts Bar Nuclear Performance Plan." In this safety evaluation, the NRC staff found that there were several issues that required additional information before they could complete their review. The NRC staff stated therein that these programs will continue to be reviewed and monitored and NRC would issue a revised evaluation in a supplement to NUREG-0847, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2." Starting in Supplement 5, a Section on corrective action programs (CAPs) and special programs (SPs) was added to NUREG-0847 to provide the status of TVA's implementation and the status of the NRC staff review. By letter dated September 6, 1991, the TVA transmitted Revision 1 of the WBNPP to the NRC. The NRC staff concluded in NUREG-0847, Supplement 9 that the revision did not necessitate a revision of NUREG-1232.
As reported in NUREG-0847, Supplement 19, all CAPs and SPs were acceptably implemented by the licensee.
Supplement 19 also listed all applicable safety evaluations that found these programs acceptable and the inspection reports that verified implementation.
Because the NRC has not issued a safety evaluation for these programs for Watts Bar Nuclear Plant (WBN) Unit 2, the NRC staff had asked TVA to confirm that previous WBNPP submittals for WBN Unit 1 were also applicable to Unit 2. Further, the NRC staff asked TVA to identify any cases where TVA expects to revise a CAP or SP for use on WBN Unit 2 and provide a schedule for submitting justification for the revision to NRC for its review. Therefore, TVA provided, as one of the enclosures to its January 29, 2008, letter, a table giving the status of these programs and TVA commitments for Unit 2. TVA also provided a separate table listing those CAP and SP items requiring NRC review and approval.
In this regard, TVA stated that it had evaluated these CAPs and SPs and determined that the Quality Assurance (QA) Records CAP will be resolved using the methodology employed for Unit 1. ENCLOSURE
-2 Based on discussions with the NRC staff, TVA agreed to supplement the CAP and SP summaries to provide additional information on the status of these programs, basis for proposed action, and impact on other aspects of the licensing framework due to these programs.
In a letter, dated September 26,2008 (ML082750019), TVA provided the summaries of the CAPs and SPs describing the proposed actions, current status of licensing review, analysis of conformance, impact on final safety analysis report, impact on technical specifications and technical requirements manual, items requiring verification and inspection, and interdependencies of these issues.
2.0 REGULATORY EVALUATION
On September 17, 1985, the Executive Director for Operations of the NRC issued a letter to the Chairman of the Board of Directors of the TVA pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) requesting information on the actions the licensee was taking to resolve NRC's concerns about TVA's nuclear program. TVA's Corporate Nuclear Performance Plan (CNPP), which was prepared in response to the NRC letter, was submitted to the NRC on November 1,1985. In addition to its CNPP, TVA prepared separate plans to address site-specific problems at each of its nuclear plants. NUREG-1232, Volume 4 documents the NRC staff's review of the corrective actions developed by TVA to resolve problems listed in Volume 4 of the CNPP, "Watts Bar Nuclear Performance Plan (WBNPP)." 3.0 TECHNICAL EVALUATION By letter dated May 15, 1992 (ML073550427), TVA provided Revision 5 of the QA Records CAP for NRC review and approval.
By letter dated June 9, 1992, and in Appendix X of NUREG-0847, Supplement 9, "Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391" (ML072060469), the NRC staff approved Revision 5 of the QA Records CAP for WBN Unit 1. By letter, dated April 6, 1994 (ML073230638), TVA provided Revision 6 of the QA Records CAP for NRC review and approval.
By letter, dated April 25, 1994, the NRC staff approved Revision 6 of the QA Records CAP for WBN Unit 1. In a letter, dated January 29,2008 (ML080320443), TVA committed to implement the QA Records CAP for WBN Unit 2 with the WBN Unit 1 approach.
In a letter, dated September 26,2008 (ML082750019), TVA provided the summaries of the CAPs and SPs describing the proposed actions, current status of licensing review, analysis of conformance, impact on final safety analysis report, impact on technical specifications and technical requirements manual, items requiring verification and inspection, and interdependencies of these issues. In a letter, dated February 11, 2009 (ML090210107), the NRC staff asked for clarification of the QA Records CAP. TVA responded in a letter, dated July 10, 2009 (ML091960112).
-3 TVA states that relevant WBN Unit 2 records are similar to WBN Unit 1 records and the same personnel were involved with WBN Unit 1 and WBN Unit 2 records. As a result, TVA concludes that WBN Unit 2 record issues will be similar to WBN Unit 1. TVA further states that based on sampling and subsequent evaluation, procedures were put in place to ensure similar problems would be addressed going forward and that these procedures will be used for WBN Unit 2 activities.
TVA concludes that any potential problems with WBN Unit 2 records will be identified and corrected in the process of QA record use within the scope of CAPs, SPs, and other design, modification and construction activities.
TVA plans to statistically sample WBN Unit 2 QA records by type to ensure their retrievability, storage integrity, and completeness to ensure that QA records issues that exist on WBN Unit 2 are identified and corrected in a timely manner. TVA plans to use a smaller initial sample size for WBN Unit 2 than the WBN Unit 1 Additional Systematic Records Review sample. TVA plans to select from the CAPs, SPs, and several other programs being performed for WBN Unit 2, and the sample will include records similar to those for which technical content issues occurred on WBN Unit 1 to provide additional assurance that these issues are adequately addressed for WBN Unit 2. The NRC staff reviewed and finds acceptable the QA Records CAP for WBN Unit 2 as described in the WBN "Quality Assurance Records Corrective Action Program Plan," Revision 6, dated April 6, 1994 (ML073450660), as supplemented by letters dated January 29, 2008, September 26, 2008, and July 10, 2009. The NRC staff will perform inspections to assure adequate implementation of the QA Records CAP for WBN Unit 2.
4.0 CONCLUSION
The NRC staff concludes that there is reasonable assurance that, when implemented as described, the QA Records CAP will be appropriately resolved for WBN Unit 2. Use of the WBN Unit 1 approach and the sampling plan described in TVA's letter, dated July 10, 2009, is acceptable.
Principle Contributor:
John G. Lamb Date: September 8, 2009 Mr. Ashok Bhatnagar Senior Vice President Nuclear Generation Development and Construction 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 WATTS BAR NUCLEAR PLANT, UNIT 2 -SAFETY EVALUATION INPUT REGARDING QUALITY ASSURANCE RECORDS CORRECTIVE ACTION PROGRAM (TAC NO. ME2168)
Dear Mr. Bhatnagar:
By letter dated January 29,2008 (ADAMS Accession No. ML080320443), as supplemented by letters dated September 26, 2008 (ADAMS Accession No. ML082750019), and July 10, 2009 (ADAMS Accession No. ML091960112), the Tennessee Valley Authority (TVA) submitted an application for approval of the Quality Assurance Records Corrective Action Program for Watts Bar Nuclear Plant, Unit 2. The staff has reviewed TVA's application including the supplemental letters and find them acceptable.
Enclosed is the staff's safety evaluation completing the staff's efforts for TAC No. ME2168. If you have any questions regarding this issue, please feel free to contact John G. Lamb at (301) 415-3100.
Sincerely, IRAI L. Raghavan, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
As stated DISTRIBUTION:
PUBLIC RidsNRRDorlLpwb RidsRgn2MainCenter Resource RidsAcrsAcnw_MailCTR Resouce RidsNrrPMWattsBar2 Resource Lpwb rlf RidsNrrLaBClayton ADAMS ACCESSION NO'
- via e-mail OFFICE DORLlWBSP/PI\t1 DORLIWBSP/LA RII DORLIWBSP/BC NAME JLamb BClayton RHaag
- LRaghavan DATE 09/08/09 09/08/09 08/19/09 09/08/09 OFFICIAL RECORDS