05000261/FIN-2012003-01
From kanterella
Revision as of 00:56, 16 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Finding | |
---|---|
Title | Adequacy Of Pre-Planned Mitigating Actions In Response To Declaring The Control Room Envelope Inoperable |
Description | An URI is being opened to provide for additional inspection in response to the actions performed by the licensee after declaring the control room envelope (CRE) inoperable due to not performing an adequate surveillance to demonstrate the integrity of the CRE. The inspectors noted on June 12, 2012, that in response to declaring the CRE inoperable on June 6, 2012, the licensee was required to verify mitigating actions to ensure CRE occupancy for design basis conditions in accordance with Technical Specification (TS) 3.7.9 Action G.2 was completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Those actions are described in PLP-019, Control Room Envelope Habitability Program. An aspect of the mitigating actions included having self-contained breathing apparatus (SCBA) available for the control room occupants. The licensee verified five SCBAs were available in the control room for use by normal shift complement of licensed operators and shift technical advisor. The inspectors questioned whether the emergency communicator should have an SCBA. The licensee responded by adding a sixth SCBA on June 12, 2012. Additional inspection is required to determine if the emergency communicator is required to have an SCBA staged in the control room to support response to design basis conditions. |
Site: | Robinson |
---|---|
Report | IR 05000261/2012003 Section 1R15 |
Date counted | Jun 30, 2012 (2012Q2) |
Type: | URI: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | A Sengupta C Scott D Lanyi G Laska J Hickey M Speck R Musser W Lood Mas-Penaranda M Coursey C Scott M Singletary D Jones L Lake J Hickey R Musse |
INPO aspect | |
' | |
Finding - Robinson - IR 05000261/2012003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Robinson) @ 2012Q2
Self-Identified List (Robinson)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||