05000261/FIN-2011005-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Perform Adequate Design Reviews Related to Site Topography Changes Result in Water Intrusion into Safety-Related Buildings |
Description | A self-revealing non-cited violation (NCV) of 10 CFR 50, Appendix B, Criterion III, Design Control, was identified for the licensees failure to consider how the aggregate changes to the sites topography could impact the sites ability to drain storm water runoff and adequately respond to localized flooding during periods of heavy rain. This resulted in the ponding of storm water runoff, the subsequent direction of runoff flow towards the power block, overfilling of the retention basin, backup of the storm drainage system, and ultimately, uncontrolled water intrusion into safety-related equipment rooms in the auxiliary building. The licensee took immediate actions to remove the water from the affected plant buildings and grounds. In addition, within a few weeks of the event, the licensee repaired the washed out area of the berm just to the north of the power block, and performed interim adjustments to site topography to limit ponding near the berm. The licensee plans to perform additional site grade and trench restoration and remediation to permanently prevent site ponding. This issue was entered into the licensees corrective action program as NCR 468235. The licensees failure to consider how the aggregate changes to the sites topography could impact the sites ability to drain storm water runoff and adequately respond to localized flooding during periods of heavy rain as required by procedure EGR-NGGC- 0005, Engineering Change, was a performance deficiency. This performance deficiency was considered more than minor because it was associated with the Initiating Events Cornerstone attributes of the Design Control (plant modifications) and Protection Against External Factors (flood hazard), and adversely affected the cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the failure to consider aggregate changes to the sites topography on the sites ability to drain storm water runoff resulted in uncontrolled water intrusion into safety-related equipment rooms. The inspectors assessed the finding using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), Att. 4, Phase 1 - Initial Screening and Characterization of Findings, and determined the finding was potentially greater than very low safety significance because the finding increases the likelihood of an external flooding event. As a result, the characterization worksheet for Initiating Events required a Phase 3 analysis using the Individual Plant Examination for External Event Submittal (IPEEE) or other existing plant specific analyses as inputs. A Senior Reactor Analyst determined the increase in likelihood of flooding was of very low risk significance i.e., Green. The main contributors to the low risk results were: 1) the low frequency of a severe rainfall necessary to impact equipment in the plant, and 2) the limited impact on risk-significant components affected by the postulated worst-case flood i.e., the 230kV switchyard and none of the equipment in the Auxiliary Building. The inspectors determined that the cause of this finding was related to the trending and assessment aspect in the Corrective Action Program component of the Problem Identification and Resolution cross-cutting area. |
Site: | Robinson |
---|---|
Report | IR 05000261/2011005 Section 1R01 |
Date counted | Dec 31, 2011 (2011Q4) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.01 |
Inspectors (proximate) | C Scott P Lessard R Musser T Chandler |
CCA | P.4, Trending |
INPO aspect | PI.4 |
' | |
Finding - Robinson - IR 05000261/2011005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Robinson) @ 2011Q4
Self-Identified List (Robinson)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||