ML17310B023

From kanterella
Revision as of 19:13, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Unit 2 Steam Generator Tube Insp Plan Addendum, Based on 940111 Telcon W/Nrc
ML17310B023
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/27/1994
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17310B024 List:
References
102-02803-JML-R, 102-2803-JML-R, NUDOCS 9402090013
Download: ML17310B023 (6)


Text

ACCELERATED DISTIuBUTION DEMONSTRATION SYSTEM 1 t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9402090013 DOC.DATE: 94/01/27 NOTARIZED:

NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.

Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Addendum to SG Tube Insp Plan based on telecon w/NRC&Palo Verde staff on 940111.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR i ENCL j SIZE: TITLE: OR Submittal:

General Distribution NOTES:Standardized plant.05000529 D RECIPIENT ID CODE/NAME PDV LA POLICH, T INTERNAL: ACRS NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB DC REG 01 EXTERNAL'RC PDR COPIES LTTR ENCL 1 1 2 2 6 6 1 1 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PDV PD TRAN,L NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 0 1 1 , A-D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 22 g I 4 gt l, JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 102-02803-JML/RAB/JRP January 27, 1994 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C.20555

Reference:

Letter 102-02751 dated December 6, 1993, from J.M.Levine, Vice President, Nuclear Production, APS, to USNRC

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 Steam Generator Tube Inspection Plan Addendum File: 94-056-026 The referenced letter forwarded the steam generator tube inspection plan for PVNGS Unit 2 mid-cycle outage (U2M5).The purpose of this letter is to forward an Addendum to the referenced letter based on a telephone conference call with the Nuclear Regulatory Commission (NRC)and members of the Palo Verde staff on Tuesday, January 11, 1994.The enclosure to this letter contains the steam generator tube inspection plan addendum.Should you have any questions, please contact Richard A.Bernier at (602)393-5882.Sincerely, JML/RAB/JRP/did Enclosure cc: W.F.Conway K.E.Perkins K.E.Johnston PDR ll'.E.Holian 040034-9402090013 940127 PDR ADOCK 05000S29 Q

, r II a STATE OF ARIZONA))ss.COUNTY OF MARICOPA)I, J.M.Levine, represent that I am Vice President Nuclear Production, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true and correct.J.M.Levine Sworn To Before Me This Day Of , 1994.Notary Public My Commission Expires

~~