ML17313A293

From kanterella
Revision as of 18:36, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 2 to Unit 2 First Yr ISI Program. Document Reflects Final Status of ISI Program Requirements & Contains Addl Relief Requests for Insps Determined to Be Impractical
ML17313A293
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/17/1998
From: Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17313A294 List:
References
102-04096-WEI-A, 102-4096-WEI-A, NUDOCS 9803250395
Download: ML17313A293 (6)


Text

CATEGORY 1 REGULA'l'INFORMATION DISTRIBUTIO

.SYSTEM (RIDS)

SUBJECT:

Forwards"PVNGS Unit 2 first 10 year inservice insp program rev 2.'" ENCL~SIZE:+DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR TITLE: OR Submittal:

Inservice/Testing/Relief A from ASME Code-GL-89-04 T 05000529 E NOTES:Standardized plant.ACCESSION NBR:9803250395 DOC.DATE: 98/03/17 NOTARIZED:

NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION IDE,W.E.Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J INTERNAL: A FILE CENTER-ABSTRACT RES/DET/EIB COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD AEOD/S PD/RAB NRR/DE/EMEB OGC/HDS2 RES/DET/EMMEB COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 EXTERNAL: LITCO'ANDERSON NRC PDR 1 1 1 1 NOAC 1 1 D 0 C E NOTE TO ALI"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 P;ll Commitment.

Innmefton.

Eneyy.Palo Verde Nuclear Generating Station William E.Ide Vice President Nuclear Engineering TEL 602/393-6116 FAX 602/393-6077 Mail Station 7605 P.O.Box 52034 Phoenix, AZ 85072-2034 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 102-04096-WEI/AKK/MLG March 17, 1998

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 60-629 Unit 2 First 10 Year lnservice Inspection Program Revision Enclosed is revision 2 of the Unit 2 First 10 Year Interval ISI Program.This document reflects the final status of ISI program requirements and contains additional relief requests for inspections determined to be impractical.

Included with this revision is an updated record of revisions, revised pages to the program (with change bars), and an update to the relief requests.The revision is submitted pursuant to the requirements of 10 CFR 50.55a (g)(4)and 10 CFR 50.55a (g)(5)(iv).

Approval of the relief requests is requested.

The following commitments to the NRC are contained in this letter: Complete 100%examination of Closure Head Studs, Nuts, and Washers.2 Complete Radiograph on UV654.If full coverage cannot be obtained, an additional valve or valves will be examined.3 Examine an adjacent integrally welded attachment to the attachment for SG-52-H5 during the next refueling outage.4 Portions of Pressurizer longitudinal welds not inspected during U2R7 will be inspected during U2R8.5 Evaluate U1 RCP flange inspection results to determine potential impact on U2 RCPs.;'t'>4i V~i.tt/8032503'F5 9803i7C(PDR ADQCK 05000529 6 P DR~i

U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 Page 2 Please contact Mr.Scott Bauer at (602)393-5978 if you have any questions or would like additional information regarding this matter.Sincerely, WEI/AKK/MLG/rlh Enclosure cc: E.W.Merschoff K.E.Perkins J.W.Clifford J.H.Moorman fl I f.