|
---|
Category:Final Safety Evaluation Report (FSER)
MONTHYEARML18271A1322018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix B - References ML18274A4032018-09-28028 September 2018 Korea Hydro & Nuclear Power Co., Ltd - Review Results to Final Safety Evaluation Report for Six Chapters ML18043A8872018-09-28028 September 2018 APR1400 Chapter 9, Auxiliary Systems, Final Safety Evaluation Report ML18044A1852018-09-28028 September 2018 APR1400 Chapter 10, Steam and Power Conversion System, Final Safety Evaluation Report ML18067A2922018-09-28028 September 2018 APR1400 Chapter 4, Reactor, Final Safety Evaluation Report ML18078A0162018-09-28028 September 2018 APR1400 Chapter 11, Radioactive Waste Management, Final Safety Evaluation Report ML18081A5052018-09-28028 September 2018 APR1400 Chapter 12, Radiation Protection, Final Safety Evaluation Report ML18082A2982018-09-28028 September 2018 APR1400 Chapter 2, Site Characteristics, Final Safety Evaluation Report ML18176A0512018-09-28028 September 2018 APR1400 Chapter 15, Accident and Transient Analyses, Final Safety Evaluation Report ML18197A2192018-09-28028 September 2018 APR1400 Chapter 8, Electric Power, Final Safety Evaluation Report ML18211A5692018-09-28028 September 2018 APR1400 Chapter 5, Reactor Coolant System and Connecting Systems, Final Safety Evaluation Report ML18212A0922018-09-28028 September 2018 APR1400 Chapter 6, Engineered Safety Systems, Final Safety Evaluation Report ML18215A2402018-09-28028 September 2018 APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Final Safety Evaluation Report ML18215A2412018-09-28028 September 2018 APR1400 Chapter 7, Instrumentation and Controls, Final Safety Evaluation Report ML18215A2422018-09-28028 September 2018 APR1400 Chapter 3, Design of Structures, Systems, Components, and Equipment, Final Safety Evaluation Report ML18227A0612018-09-28028 September 2018 APR1400 Chapter 16, Technical Specifications, Final Safety Evaluation Report ML18261A1612018-09-28028 September 2018 APR1400 Chapter 13, Conduct of Operations, Final Safety Evaluation Report ML18264A1412018-09-28028 September 2018 APR1400 Chapter 1, Introduction and General Discussion, Final Safety Evaluation Report ML18269A1742018-09-28028 September 2018 APR1400 Chapter 18, Human Factors Engineering, Final Safety Evaluation Report ML18269A2422018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix C - Acronyms ML18270A0722018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Table of Contents ML18270A3942018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix D - Principal Contributors ML18270A4522018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix E - Index of Nrc'S RAIs ML18271A1212018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix a - Chronology ML18215A2392018-09-28028 September 2018 APR1400 Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation, Final Safety Evaluation Report ML18264A1302018-09-21021 September 2018 Enclosure 3 - Markup of the APR1400 Chapter 6 - FSER ML18264A1292018-09-21021 September 2018 Enclosure 2 - Markup of the APR1400 Chapter 5 - FSER ML18264A1282018-09-21021 September 2018 Enclosure 1 - Markup of the APR1400 Chapter 4 - FSER 2018-09-28
[Table view] |
Text
Code of Federal Regulations
12.1.4.1 Policy Considerations
12.1.4.2 Design Considerations
12.1.4.3 Operational Considerations 12.1.4.4 Radiation Protection Considerations
12.2.4.1 Contained Sources
12.2.4.1.1 The Reactor Core and Fuel
12.2.4.1.2 Reactor Coolant System and Contained Sources Other Than Fuel
12.2.4.2 Airborne Radioactive Material Sources
12.2.4.3 Accident Source Terms
12.3.4.1 Radiation Protection Design Features
12.3.4.1.1 Facility Design Features
12.3.4.1.2 Shielding
12.3.4.1.3 Ventilation 12.3.4.1.4 Area Radiation and Airborne Radioactivity Monitoring Instrumentation
12.3.4.1.5 Minimization of Contamination
12.3.4.2 Dose Assessment