ML11252A658
Letter Sequence Request | |
---|---|
TAC:ME7110, Control Room Habitability, Administratively Control Containment Penetrations, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Open) | |
Initiation Administration Questions Answers | |
MONTHYEARML11222A1232011-07-25025 July 2011
[Table View]License Amendment Request 244: Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Request ML11252A5212011-08-30030 August 2011 License Amendment Request 244: Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Request ML11252A6532011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating License and Technical Specifications Pages, Attachment 2 Project stage: Request ML11252A6542011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating Technical Specifications Bases Pages, Attachment 3 Project stage: Request ML11252A6562011-08-30030 August 2011 License Amendment Request 244, Radiological Accident Analysis and Discussion of Associated Technical Specification Changes, Attachment 4 Project stage: Request ML11252A6572011-08-30030 August 2011 License Amendment Request 244, Evaluation of New Proposed Manual Actions, Attachment 5 Project stage: Request ML11252A6582011-08-30030 August 2011 License Amendment Request 244, Data Files, Kewaunee Power Station Meterological Data 2002-2006 X/Q Calculation Support, Enclosure 1 Project stage: Request ML11252A6512011-08-30030 August 2011 License Amendment Request 244, Discussion of Change, Safety Evaluation, Significant Hazards Determination and Environmental Considerations, Attachment 1 Project stage: Request ML11290A1482011-10-17017 October 2011 NRR E-mail Capture - ME7110 - Chi-over-Q Amendment Application - Non-acceptance with Opportunity to Supplement Project stage: Other ML11298A2652011-10-25025 October 2011 NRR E-mail Capture - FW: ME7110 - Kewaunee Chi-over-Q - Acceptance Review RAL Items - Conference Calls of October 20, 25, 2011 Project stage: Acceptance Review ML11304A1462011-10-27027 October 2011 NRR E-mail Capture - FW: ME7110 - Kewaunee Chi-over-Q - Acceptance Review RAL Items - Conference Calls of October 20, 25, 26, 2011 Project stage: Acceptance Review ML11318A2052011-11-0808 November 2011 Response to Request for Additional Information: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML11325A0782011-11-18018 November 2011 NRR E-mail Capture - ME7110 - Kewaunee - LIC-109 Acceptance Review Results for Chi-over-Q License Amendment Request Project stage: Acceptance Review ML11339A0012011-12-0101 December 2011 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Eicb Request for Additional Information (RAI) Project stage: RAI ML12023A0472012-01-0909 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) Project stage: RAI ML12023A0572012-01-13013 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) - Firm RAI Items Project stage: RAI ML12031A1382012-01-25025 January 2012 Response to Request for Additional Information on License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12033A0102012-01-30030 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Chi-over-Q - Rsxb Request for Additional Information (RAI) Project stage: RAI ML12068A1422012-02-27027 February 2012 Response to Request for Additional Information: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12066A0082012-03-0202 March 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request- Chi-over-Q - Aadb Request for Additional Project stage: Other ML12068A4202012-03-0606 March 2012 E-mail Capture - ME7110 Record of Clarification Conference Call for ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Aadb Request for Additional Information (RAI) Project stage: RAI ML12080A2232012-03-12012 March 2012 Response to Request for Additional Information: License Amendment Request 244. Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12107A1442012-04-13013 April 2012 NRR E-mail Capture - ME7110 Kewaunee - Request for Additional Information (RAI) Aadb and Scvb 2012-04-12 Project stage: RAI ML12124A2832012-04-30030 April 2012 Response to Request for Additional Information: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12138A0072012-05-15015 May 2012 NRR E-mail Capture - ME7110 Scvb Draft RAI Set Adoption of TSTF-51 & TSTF- 448, as Part of Chi-over-Q Action Project stage: Draft RAI ML12137A0032012-05-15015 May 2012 NRR E-mail Capture - ME7110 Agenda for Draft RAI Clarification Call Re Wednesday 3-4 PM ET - Eicb Input Project stage: Draft RAI ML12164A3742012-06-0606 June 2012 Response to Request for Additional Information: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12166A0062012-06-13013 June 2012 NRR E-mail Capture - ME7110 - Kewaunee - Chi-Over-Q - Record of Conference Call - Wednesday, June 13, 2012 3:00 PM Project stage: Other ML12193A6832012-06-19019 June 2012 NRR E-mail Capture - ME7110- Kewaunee LAR 244: Executive Summary of LRA Emergent Issue - Further Information - Generic Implications for Otherv Plants Project stage: Approval ML12193A6842012-07-11011 July 2012 NRR E-mail Capture - Record of ME7110 - Kewaunee - Chi-Over-Q - Progress Review (Dated Wed 7/11/2012 3:00 PM - 4:00 PM from Outlook Invitation) Project stage: Other ML12219A2222012-08-0303 August 2012 Response to Request for Additional Information: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12226A5062012-08-0909 August 2012 Response to Request for Additional Information: License Amendment Request 244. Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Response to RAI ML12236A2062012-08-22022 August 2012 NRR E-mail Capture - FW: ME7110- Kewaunee LAR 244: Executive Summary of LRA Emergent Issue - Further Information - Generic Implications for Other Plants Project stage: Approval ML12248A1492012-08-29029 August 2012 Submittal of Revision to Locked Rotor Radiological Accident Analysis: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications Project stage: Request ML12285A1572012-10-10010 October 2012 NRR E-mail Capture - ME7110 - Kewaunee - Chi-over-Q - Request for Additional Information (RAI) Project stage: RAI ML13058A0722013-02-28028 February 2013 Withdrawal of an Amendment Request Project stage: Withdrawal 2012-03-12 |
ML11252A658 | |
Person / Time | |
---|---|
Site: | Kewaunee ![]() |
Issue date: | 08/30/2011 |
From: | Dominion, Dominion Energy Kewaunee |
To: | Office of Nuclear Reactor Regulation |
References | |
11-025A, LAR 244, TAC ME7110 | |
Download: ML11252A658 (3) | |
Similar Documents at Kewaunee | |
---|---|
Category:Calculation
MONTHYEARML14029A0672014-01-16016 January 2014
[Table view]Sargent & Lundy Calculation 2013-11284, Revision 0 - Maximum Cladding and Fuel Temperature Analysis for Uncovered Spent Fuel Pool ML14029A0662014-01-16016 January 2014 Calculation RA-0050, Revision 0 - Kewaunee Resin Cask Drop Dose Consequence Analysis ML14029A0652014-01-16016 January 2014 Calculation RA-0049, Revision 1, Addendum a - Kewaunee Emergency Action Levels for Post - Cessation of Power Operations ML14029A0632014-01-16016 January 2014 Kewaunee,Calculation 2013-07050, Revision 2 - Maximum Cladding Temperature Analysis for an Uncovered Spent Fuel Pool with No Air Cooling ML14029A0622014-01-16016 January 2014 Calculation RA-0044, Revision 1 - Dose Rate at the KPS Site Boundary Following a Complete Draindown of the Spent Fuel Pool ML11252A6582011-08-30030 August 2011 License Amendment Request 244, Data Files, Kewaunee Power Station Meterological Data 2002-2006 X/Q Calculation Support, Enclosure 1 ML1027303982010-09-0707 September 2010 Calculation C11116, Revision 0, Kewaunee Unit 1 Steam Generator Narrow Range Level Protection Channel Statistical Allowance (Csa) Calculation ML1025714482010-02-0404 February 2010 Enclosure C-1 (RAI 8) Latent Debris Calculation C11928, Revision 0 ML1027304002009-10-14014 October 2009 Calculation C10854, Revision 0 Hi & HI-HI Steam Flow and Low Steam Line Pressure ESF Actuation Csa ML1027303992009-10-14014 October 2009 Calculation C10818, Revision 0 Kewaunee Unit 1 Pressurizer Pressure Protection Channel Statistical Allowance (Csa) Calculation ML0905708632009-01-30030 January 2009 Encl. 2, Supplement 2 to License Amendment Request 247, Emergency Diesel Generator Fuel Oil Technical Specification Changes, Consisting of Calculation C10033, Safeguards Diesel Fuel Oil Storage Volume Calculation ML0826903872008-09-19019 September 2008 Enclosure 1, License Amendment Request 239, Supplement 1 - Request for Review and Approval of Seismic Analysis Methodology for Auxiliary Building Crane ML0821900672008-07-30030 July 2008 Transmittal of 2007 Annual Radioactive Effluent Release Report Offsite Dose Calculation Manual ML0710200802007-04-0505 April 2007 Response to NRC Request for Additional Information Regarding License Amendment Request 230, Emergency Diesel Generator Short-Time Load Testing ML0612401582005-11-29029 November 2005 Offsite Dose Calculation Manual (Odcm), Rev. 9 ML0922306202003-01-13013 January 2003 SIR-00-045, Revision 2, Leak-Before-Break Evaluation 6-Inch to 12-Inch Safety Injection and Residual Heat Removal Piping Attached to the RCS (Kewaunee Nuclear Plant), Enclosure D 2014-01-16 Category:Report MONTHYEARML20035C7592020-01-16016 January 2020
[Table view]Redacted - Kewaunee, Request for Exemption from Certain Code of Federal Regulation Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML14126A0052014-04-29029 April 2014 And Response to Request for Additional Information Regarding License Amendment Request 256, Permanently Defueled License and Technical Specifications ML14118A3822014-04-25025 April 2014 Revision to Post-Shutdown Decommissioning Activities Report ML13066A7802013-02-27027 February 2013 Non-Proprietary - Evaluation of Report Describing the Nature of an Estimated Effect on, Peak Cladding Temperature Resulting from a Significant Emergency Core Cooling System Evaluation Model Error ML12354A4962012-11-27027 November 2012 Report in Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.3 ML12181A2002012-06-21021 June 2012 Post Accident Monitoring Report ML11277A2402011-09-21021 September 2011 TAC ME7250 - Public - 7 Pages - Kewaunee Power Station License Amendment Request 250: Adoption of NFPA-805 Performance-based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML11255A1342011-08-31031 August 2011 Core Operating Limits Report Cycle 31 Revision 2 ML11252A6512011-08-30030 August 2011 License Amendment Request 244, Discussion of Change, Safety Evaluation, Significant Hazards Determination and Environmental Considerations, Attachment 1 ML11252A6532011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating License and Technical Specifications Pages, Attachment 2 ML11252A6582011-08-30030 August 2011 License Amendment Request 244, Data Files, Kewaunee Power Station Meterological Data 2002-2006 X/Q Calculation Support, Enclosure 1 ML11252A6572011-08-30030 August 2011 License Amendment Request 244, Evaluation of New Proposed Manual Actions, Attachment 5 ML1108100712011-03-10010 March 2011 Core Operating Limits Report Cycle 31, Revision 0 ML1032104962010-11-0909 November 2010 Technical Report No. EE-0116 Revision 8, Allowable Values for North Anna Improved Technical Specifications Tables 3.3.1-1 and 3.3.2-1, Setting Limits for Surry Custom Technical Specifications, Section 2.3 and 3.7 and Allowable Values for Ke ML1027001622010-09-23023 September 2010 Response to Request for Additional Information for the Review of the License Renewal Application ML1025714462010-09-0707 September 2010 Holistic Overview of GSI-191 Resolution for Kewaunee Power Station ML1023904192010-08-31031 August 2010 DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML1016102862010-05-11011 May 2010 Report No. 0900090.401, Rev. 0, 60-Year EAF Analyses Summary Report, Kewaunee Power Station Charging Nozzle & RCS Hot Leg Surge Nozzle ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1027303972010-03-30030 March 2010 Allowable Values for North Anna Improved Technical Specifications (ITS) Tables 3.3.1-1 and 3.3.2-1, Setting Limits for Surry Custom Technical Specifications (Cts), Sections 2.3 and 3.7, and Allowable Values for Kewaunee Power Station Improv ML1025714482010-02-0404 February 2010 Enclosure C-1 (RAI 8) Latent Debris Calculation C11928, Revision 0 ML0930701642009-10-15015 October 2009 Technical Report No. EE-0116, Revision 5 ML0921908942009-08-0404 August 2009 Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A ML0919705152009-07-0606 July 2009 Response to Request to Docket Information Related to the Environmental Site Audit, Enclosure D, Hydrology Through ML0919705292009-07-0606 July 2009 Response to Request to Docket Information Related to the Environmental Site Audit, Enclosure E, Non-Radiological Waste ML0919705162009-07-0606 July 2009 Response to Request to Docket Information Related to the Environmental Site Audit, Enclosure F, Archaeological and Cultural Resources ML0919705092009-07-0606 July 2009 Response to Request to Docket Information Related to the Environmental Site Audit, Enclosures D, Appendix a ML1011101282009-06-30030 June 2009 Enclosure 5 - WCAP-16643-NP, Revision 2, Kewaunee Power Station Heatup and Cooldown Limit Curves for Normal Operation ML0826903872008-09-19019 September 2008 Enclosure 1, License Amendment Request 239, Supplement 1 - Request for Review and Approval of Seismic Analysis Methodology for Auxiliary Building Crane ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0816204382008-06-0202 June 2008 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML0809802292008-04-0404 April 2008 Stations - Request for Approval of Appendix C of Fleet Report DOM-NAF-2 Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code ML0807001732008-03-0505 March 2008 U.S. Dept of Homeland Security/Final Report of the December 4, 2007, Radiological Emergency Preparedness Full Participation Plume Pathway Exercise for the Kewaunee Power Station/Report ML0731706782007-05-19019 May 2007 SCS-00684, Rev. Draft-2, Design Report, ASME Bp&V Section III, Class 3, SS-45S8-18622-NSR Ball Valve, SS-45XS8-18623-NSR Ball Valve, Enclosure 2 ML0710603922007-04-16016 April 2007 Request for Approval of Topical Report DOM-NAF-5, Application of Dominion Nuclear Core Design and Safety Analysis Methods to the Kewaunee Power Station (Kps.) ML0710201612007-03-29029 March 2007 Generator Tube Inspection Report ML0705903272007-02-27027 February 2007 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0633906662006-12-0505 December 2006 Closure of Kewaunee Improvement Initiatives to Corrective Action Program ML0632504212006-11-14014 November 2006 Attachment 3, Submittal of Irradiated Reactor Vessel Surveillance Capsule Test Results for Capsule T Per 10 CFR 50 Appendix H ML0632504182006-10-31031 October 2006 Master Curve Assessment of Kewaunee Power Station Reactor Pressure Vessel Weld Metal, WCAP-16609-NP, Revision 0 ML0632504152006-10-31031 October 2006 Analysis of Capsule T from the Dominion Energy Kewaunee Power Station Reactor Vessel Radiation Surveillance Program, WCAP-16641-NP, Revision 0 ML0623300712006-08-16016 August 2006 Fitness-for-Duty Program Semi-Annual Performance Data Report ML0631702802006-07-11011 July 2006 ASP Final Precursor Analysis - Kewaunee Power Station ML0616604372006-06-20020 June 2006 Technical Report (TAC MC7897) on Third 10-Year Inservice Inspection Interval Request for Relief for Nuclear Management Company, LLC ML0634101622006-02-27027 February 2006 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0603804892006-02-0606 February 2006 Closed Gc TAC Report (10/01/2005 - 12/31/2005) ML0536100952005-12-16016 December 2005 Appendix C - Fault Tree Analysis - Attachment 1 - Human Error Probabilities; Attachment 1:A - Human Error Probabilities ML0536101002005-12-0101 December 2005 Safety Significance Evaluation of Kewaunee Power Station Turbine Building Internal Floods - Volume 2, Revision 1 ML0536100922005-12-0101 December 2005 Safety Significance Evaluation of Kewaunee Power Station Turbine Building Internal Floods - Volume 1, Revision 1 2020-01-16 Category:Technical MONTHYEARML20035C7592020-01-16016 January 2020
[Table view]Redacted - Kewaunee, Request for Exemption from Certain Code of Federal Regulation Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System ML11277A2402011-09-21021 September 2011 TAC ME7250 - Public - 7 Pages - Kewaunee Power Station License Amendment Request 250: Adoption of NFPA-805 Performance-based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML11252A6512011-08-30030 August 2011 License Amendment Request 244, Discussion of Change, Safety Evaluation, Significant Hazards Determination and Environmental Considerations, Attachment 1 ML11252A6582011-08-30030 August 2011 License Amendment Request 244, Data Files, Kewaunee Power Station Meterological Data 2002-2006 X/Q Calculation Support, Enclosure 1 ML11252A6532011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating License and Technical Specifications Pages, Attachment 2 ML1032104962010-11-0909 November 2010 Technical Report No. EE-0116 Revision 8, Allowable Values for North Anna Improved Technical Specifications Tables 3.3.1-1 and 3.3.2-1, Setting Limits for Surry Custom Technical Specifications, Section 2.3 and 3.7 and Allowable Values for Ke ML1023904192010-08-31031 August 2010 DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML1016102862010-05-11011 May 2010 Report No. 0900090.401, Rev. 0, 60-Year EAF Analyses Summary Report, Kewaunee Power Station Charging Nozzle & RCS Hot Leg Surge Nozzle ML1027303972010-03-30030 March 2010 Allowable Values for North Anna Improved Technical Specifications (ITS) Tables 3.3.1-1 and 3.3.2-1, Setting Limits for Surry Custom Technical Specifications (Cts), Sections 2.3 and 3.7, and Allowable Values for Kewaunee Power Station Improv ML1025714482010-02-0404 February 2010 Enclosure C-1 (RAI 8) Latent Debris Calculation C11928, Revision 0 ML0930701642009-10-15015 October 2009 Technical Report No. EE-0116, Revision 5 ML1011101282009-06-30030 June 2009 Enclosure 5 - WCAP-16643-NP, Revision 2, Kewaunee Power Station Heatup and Cooldown Limit Curves for Normal Operation ML0826903872008-09-19019 September 2008 Enclosure 1, License Amendment Request 239, Supplement 1 - Request for Review and Approval of Seismic Analysis Methodology for Auxiliary Building Crane ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0809802292008-04-0404 April 2008 Stations - Request for Approval of Appendix C of Fleet Report DOM-NAF-2 Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code ML0731706782007-05-19019 May 2007 SCS-00684, Rev. Draft-2, Design Report, ASME Bp&V Section III, Class 3, SS-45S8-18622-NSR Ball Valve, SS-45XS8-18623-NSR Ball Valve, Enclosure 2 ML0710603922007-04-16016 April 2007 Request for Approval of Topical Report DOM-NAF-5, Application of Dominion Nuclear Core Design and Safety Analysis Methods to the Kewaunee Power Station (Kps.) ML0632504212006-11-14014 November 2006 Attachment 3, Submittal of Irradiated Reactor Vessel Surveillance Capsule Test Results for Capsule T Per 10 CFR 50 Appendix H ML0632504182006-10-31031 October 2006 Master Curve Assessment of Kewaunee Power Station Reactor Pressure Vessel Weld Metal, WCAP-16609-NP, Revision 0 ML0632504152006-10-31031 October 2006 Analysis of Capsule T from the Dominion Energy Kewaunee Power Station Reactor Vessel Radiation Surveillance Program, WCAP-16641-NP, Revision 0 ML0631702802006-07-11011 July 2006 ASP Final Precursor Analysis - Kewaunee Power Station ML0616604372006-06-20020 June 2006 Technical Report (TAC MC7897) on Third 10-Year Inservice Inspection Interval Request for Relief for Nuclear Management Company, LLC ML0536100952005-12-16016 December 2005 Appendix C - Fault Tree Analysis - Attachment 1 - Human Error Probabilities; Attachment 1:A - Human Error Probabilities ML0536101002005-12-0101 December 2005 Safety Significance Evaluation of Kewaunee Power Station Turbine Building Internal Floods - Volume 2, Revision 1 ML0536100922005-12-0101 December 2005 Safety Significance Evaluation of Kewaunee Power Station Turbine Building Internal Floods - Volume 1, Revision 1 ML0510803792005-05-27027 May 2005 Relief, Third and Fourth 10-Year Inservice Inspection Interval Program Requests for Relief ML0508105002005-03-0808 March 2005 Enclosure 2, NMCKWO02-RPT-01-05, Kewaunee Nuclear Power Plant Hatch Closure Task Assessment ML0503502252005-02-18018 February 2005 Relief, Forth 10-Year Inservice Inspection Interval Program Requests for Relief ML0435700172004-12-14014 December 2004 From NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations ML0428903732004-09-30030 September 2004 Response to Request for Additional Information Related to Technical Letter Report on Fourth 10-Year Interval In-Service Inspection Request for Nuclear Management Co., LLC ML0802902312004-02-12012 February 2004 Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 ML0306901592003-02-27027 February 2003 Part 2, Kewaunee, NMC Responses to NRC Request for Additional Information Concerning License Amendment Request 187 ML0305202692003-02-15015 February 2003 Follow-up Report, Reference Event #39516 ML0302805862003-01-20020 January 2003 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60 Day Response for Kewaunee Nuclear Plant, Request for Additional Information ML0922306202003-01-13013 January 2003 SIR-00-045, Revision 2, Leak-Before-Break Evaluation 6-Inch to 12-Inch Safety Injection and Residual Heat Removal Piping Attached to the RCS (Kewaunee Nuclear Plant), Enclosure D ML0302405652003-01-13013 January 2003 License Amendment Request 193, Measurement Uncertainty Recapture Power Uprate, Attachments 1 - 4 ML0302204542003-01-13013 January 2003 License Amendment Request 193, Measurement Uncertainty Recapture Power Uprate, Attachment 8 ML0302204302003-01-13013 January 2003 License Amendment Request 193, Measurement Uncertainty Recapture Power Uprate, Attachments 5, 10 - 12 NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2020-01-16 |
Text
Serial No. 11-025A ENCLOSURE 1
LICENSE AMENDMENT REQUEST 244: PROPOSED REVISION TO RADIOLOGICAL ACCIDENT ANALYSIS AND CONTROL ROOM ENVELOPE HABITABILITY TECHNICAL SPECIFICATIONS
DATA FILES KEWAUNEE POWER STATION METEOROLOGICAL DATA 2002 - 2006 /Q CALCULATION SUPPORT
KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
Serial No. 11-025A Enclosure Page 1 of 2 DATA FILES:
KEWAUNEE POWER STATION METEOROLOGICAL DATA 2002 - 2006 /Q CALCULATION SUPPORT COMPACT DISC (CD-ROM)
Data File Description and File Structure
- 1. Base Met Data File Description BaseMetData.txt 2002-2006 Base Met Data Base Met Data File Structure Name Columns Format Missing Data Year 1-4 Numeric 4 [YYYY](2002-2006) - Day of the Year 6-8 Numeric 3 [DDD](001-366) - Hour of the Day 10-11 Numeric 2 [HH](00-23) - Lower Wind Direction* 13-15 Numeric 3 (1-360°TN) 999 Lower Wind Speed** 17-20 Numeric 4.1 (ex 10.1 m/s) 9999 Stability Class 22-23 Alpha 2 (A-G, right justified) 99 Upper Wind Direction* 25-27 Numeric 3 (1-360°TN) 999 Upper Wind Speed** 29-32 Numeric 4.1 (ex 10.1 m/s) 9999 * "From" Wind Direction
- Lower level (10m);
Upper level (60m)
- 2. PAVAND File Description PAVANDInput.txt PAVAND Input File PAVANDInputs.pdf PAVAND Inputs (description/explanation) PAVANDMetData.pdf 2002-2006 Met Data Joint Frequency Distribution - PAVAND Input (inputted manually) PAVANDOutput.pdf PAVAND Output File (paginated)
PAVANDOutput.txt PAV AND Output File
Serial No. 11-025A Enclosure Page 2 of 2
- 3. ARCON96
File Description ARCON96MetData.txt 2002-2006 Met Data
- ARCON96 Input (same as KWQ02_06.MET in RSF & LOG files below)
ARCON96 Met Data File Structure Name Columns Format Missing Data Year 6-9 Numeric 4 [YYYY](2002-2006) - Day of the Year 10-12 Numeric 3 [DDD](001-366) - Hour of the Day 13-14 Numeric 2 [HH](00-23) - Lower Wind Direction* 17-19 Numeric 3 (1-360°TN) 999 Lower Wind Speed** 20-23 Numeric 4 (ex 101 .1m/s) 9999 Stability Class 25-26 Numeric 2 (1-7, 1=A, 2=B-) 99 Upper Wind Direction* 29-31 Numeric 3 (1-360°TN) 999 Upper Wind Speed** 32-35 Numeric 4 (ex 101 .1m/s) 9999 * "From" Wind Direction
- Lower level (10m);
Upper level (60m)
ARCON96 RSF & LOG Files Source Control Room Intake Isolated CR Worst Inleakage Reactor Building Stack Exhaust KWCEXNCR KWCEXTLW Containment/Shield Building KWCNTNCR KWCNTTLW Auxiliary Building Stack Exhaust KWAUXNCR KWAUXTLE, KWAUXTLW* Containment Equipment Hatch KWEQHNCR KWEQHTLW Fuel Area Roll-Up Door KWAR2NCR
+ KWAR2TLW "A" Steam Generator PORV KWAPVNCR
+ KWAPVTLW "B" Steam Generator PORV KWBPVNCR
+ KWBPVTLW
- Max 8-24hr X/Q was taken from KWAUXTLW; other Max period X/Qs were taken from KWAUXTLE
+ CFD & LOG file names in RSF & L OG files do not match names above due to renaming afterwards