ML15280A010

From kanterella
Revision as of 17:13, 27 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness - Phase 2 - SGI-Staffing..
ML15280A010
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/28/2015
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-20l5-256
Download: ML15280A010 (2)


Text

'*-. --** --..

DISCLOSURE IS PROHIBITED Sfa_,ifuN i47 ATOMJG ENERGY 1g 54 ." AND iO CFR 73.21 VIOLA.T!fiNC::

s{p:ijFCT l SEP 2 a* 2015 _

.. J.i a.me and k'osxhon)

  • . . Florid?" Power and I.ight Company Turkey Pomt Umts 3 and 4 .Nuclear Energy; Date of Docket Nos. 50-250 and 50-251 Document or Determination PCR<.,1.-z,_

Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness

-Phase 2 -SGI-Staffmg Assessment

References:

(1) NRC Letter, RequeSt for Information Pursuant to Tit(e 10 of the Code 50.54(f) ;Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012, :ML12053A340.

(2) FPL letter, :rvt Kiley (FPL) to NRC (L-2012-208), "60-Day Re.spouse to NRC Letter, "Request for . Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(t) Regarding

  • Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the
  • A.ccident.'._dated March 2012," Accession No ML12144A158,_

May 10, 2012. (3) NEf 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffmg and

  • Communications Capabilities," Revision 0, dated.May 2012, :ML12110A204.

(4) NRC Letter, "U.S. Nuclear Regulatory Commission Review ofNEI 12-01, 'Guideline for Assessing

  • Beyond Design Accident Response Staffing and Communications Capabilities,'

Revision 0, dated May 2012, dated May 15, 2012, :ML12131A043.

  • (5) NRC memorandum issued on March 13, 2013, "Summary of February 19, 2013, Public Meeting.to Discuss Framework of Phase 1 Staffing Submittals-Related to Issues Associated with Near-Term Task Force Recommendation 9.3" (6) FPL Letter, T. Summers (FPL) to NRC (L-2015-254),

to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9 .3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Phase 2-Staffmg Assessment." On March 12, 2012, the NRC staff issued Reference 1 to all power reactor licensees and holders of* construction permits in active or deferred status. Enclosure 5 of Reference 1 contains the specific.

Requested Actions, Requested Information, and Required Response associated with Recommendation 9 .3

-Staffmg. In accordance with 10 CFR 50.54(f), addressees were requested to* submit a written response to the information requests within 90 days. {J!fj ( 'C: SAFEGUARDS INFORMATION (Attachment contains Safeguards Information.

Upon separation this page is decontrolled.)

Sob/ µet_ Florida Power & Light Company 9760 S .. W. 344th Street Homestead, 33035. _4 __ Total pages SAFEGUARDS INFORMATION L-2015-256 Page? In accordance with Reference 1, Enclosure 5, Florida Power and Light Company (FPL) submitted for Turkey Poi.nt Units 3 and 4,. an alternative course of action for performing the requested actions and providing the requested information (Reference 2). Enclosure 1 of Reference 2 described the alternative course of action and schedule for responding to the Emergency Preparedness

-Staffing, Requested Information.

The Reference 3 guideline was developed by the Nuclear Energy Institute (NEI) for the performance of communications and staffing assessments associated with a response to a beyond design basis external event. This NEI guideline was endorsed by the NRC in Reference

4. Reference 6 pr9vided the FPL Turkey Point Phase i Staffing Assessment Report. As discussed in Reference 5, FPL provided the non-SGI Turkey Point responses to staffing assessment questions related to use of the security personnel during a beyond design bases event in the Enclosure of Reference
6. . . The Attachment to this letter provides the FPL Turkey Point Units 3 and 4 Phase 2 Staffing Assessment Report, .Safeguards portion of the responses to staffing assessment questions related to the use of security during a beyond design bases event.
  • The Attachment contaJns Safeguards Information that must be protected from public disclosure as required by 10 CFR 73 .22, "Protection of Safegtiards Information:

Specific Requirements." If you have any questions or require additional infonnation, please contact Mr. Timothy Security Manager at 305 246-6605.

I declare under penalty of,.perjury that the foregoing is true and correct. Executed on 2015 .

  • Sincerely, . kasSummers Site Vice President Turkey Point Nuclear Plant
  • Attachpient cc: USNRC Regional Administrator, Region IT USNRC Project Manager, Turkey Point Nuclear Plant . USNRC Senior Resident Inspector, Turkey Point Nuclear Plant SAFEGUARDS INFORMATION (Attachment contains Safeguards Infonnation.

Upon separation this page is decontrolled.)

'*-. --** --..

DISCLOSURE IS PROHIBITED Sfa_,ifuN i47 ATOMJG ENERGY 1g 54 ." AND iO CFR 73.21 VIOLA.T!fiNC::

s{p:ijFCT l SEP 2 a* 2015 _

.. J.i a.me and k'osxhon)

  • . . Florid?" Power and I.ight Company Turkey Pomt Umts 3 and 4 .Nuclear Energy; Date of Docket Nos. 50-250 and 50-251 Document or Determination PCR<.,1.-z,_

Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness

-Phase 2 -SGI-Staffmg Assessment

References:

(1) NRC Letter, RequeSt for Information Pursuant to Tit(e 10 of the Code 50.54(f) ;Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012, :ML12053A340.

(2) FPL letter, :rvt Kiley (FPL) to NRC (L-2012-208), "60-Day Re.spouse to NRC Letter, "Request for . Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(t) Regarding

  • Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the
  • A.ccident.'._dated March 2012," Accession No ML12144A158,_

May 10, 2012. (3) NEf 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffmg and

  • Communications Capabilities," Revision 0, dated.May 2012, :ML12110A204.

(4) NRC Letter, "U.S. Nuclear Regulatory Commission Review ofNEI 12-01, 'Guideline for Assessing

  • Beyond Design Accident Response Staffing and Communications Capabilities,'

Revision 0, dated May 2012, dated May 15, 2012, :ML12131A043.

  • (5) NRC memorandum issued on March 13, 2013, "Summary of February 19, 2013, Public Meeting.to Discuss Framework of Phase 1 Staffing Submittals-Related to Issues Associated with Near-Term Task Force Recommendation 9.3" (6) FPL Letter, T. Summers (FPL) to NRC (L-2015-254),

to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9 .3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Phase 2-Staffmg Assessment." On March 12, 2012, the NRC staff issued Reference 1 to all power reactor licensees and holders of* construction permits in active or deferred status. Enclosure 5 of Reference 1 contains the specific.

Requested Actions, Requested Information, and Required Response associated with Recommendation 9 .3

-Staffmg. In accordance with 10 CFR 50.54(f), addressees were requested to* submit a written response to the information requests within 90 days. {J!fj ( 'C: SAFEGUARDS INFORMATION (Attachment contains Safeguards Information.

Upon separation this page is decontrolled.)

Sob/ µet_ Florida Power & Light Company 9760 S .. W. 344th Street Homestead, 33035. _4 __ Total pages SAFEGUARDS INFORMATION L-2015-256 Page? In accordance with Reference 1, Enclosure 5, Florida Power and Light Company (FPL) submitted for Turkey Poi.nt Units 3 and 4,. an alternative course of action for performing the requested actions and providing the requested information (Reference 2). Enclosure 1 of Reference 2 described the alternative course of action and schedule for responding to the Emergency Preparedness

-Staffing, Requested Information.

The Reference 3 guideline was developed by the Nuclear Energy Institute (NEI) for the performance of communications and staffing assessments associated with a response to a beyond design basis external event. This NEI guideline was endorsed by the NRC in Reference

4. Reference 6 pr9vided the FPL Turkey Point Phase i Staffing Assessment Report. As discussed in Reference 5, FPL provided the non-SGI Turkey Point responses to staffing assessment questions related to use of the security personnel during a beyond design bases event in the Enclosure of Reference
6. . . The Attachment to this letter provides the FPL Turkey Point Units 3 and 4 Phase 2 Staffing Assessment Report, .Safeguards portion of the responses to staffing assessment questions related to the use of security during a beyond design bases event.
  • The Attachment contaJns Safeguards Information that must be protected from public disclosure as required by 10 CFR 73 .22, "Protection of Safegtiards Information:

Specific Requirements." If you have any questions or require additional infonnation, please contact Mr. Timothy Security Manager at 305 246-6605.

I declare under penalty of,.perjury that the foregoing is true and correct. Executed on 2015 .

  • Sincerely, . kasSummers Site Vice President Turkey Point Nuclear Plant
  • Attachpient cc: USNRC Regional Administrator, Region IT USNRC Project Manager, Turkey Point Nuclear Plant . USNRC Senior Resident Inspector, Turkey Point Nuclear Plant SAFEGUARDS INFORMATION (Attachment contains Safeguards Infonnation.

Upon separation this page is decontrolled.)