Proposed Tech Spec 317T Re MCPR Requirements Applicable to Inoperable Rod Block Monitor
ML18036A705
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 05/13/1992
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18036A704 List:
References
NUDOCS 9205200307
Download: ML18036A705 (31)


Text

e ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATION CHANGE (TVA-BFN-TS-317T) 9205200307 9205<~DOC~0500 p PDR 0 0 UNIT 1 LIST OF EFFECTIVE PAGES TVA BFN TS-317T UNIT 2 UNIT 3 NA 3.2/4.2-26 3.5/4.5-19 3.2/4.2-68 NA Note: This Amendment is effective only for unit 2 cycle 6.

0 OTES FOR ABLE The minimum number of OPERABLS channels for each trip function is detailed for the STARTUP and RUH positions of the reactor mode selector switch.The SRM, IRM, and APRM (STARTUP mode), blocks need not be OPERABLS in"RUH" mode, and the APRM (flov biased)rod blocks need not be OPERABLS in"STARTUP" mode.With the number of OPERABLS channels less than required by the minimum OPERABLE channels per trip function requirement, place at least one inoperable channel in the tripped condition within one hour.2, W is the recirculation loop flov in percent of design.Trip level setting is in percent of rated pover (3293 MWt).3.IRM downscale is bypassed when it is on its lovest range.4.SRMs A and C dovnscale functions are bypassed vhen IRMs A, C, S, and G are above range 2.SRMs B and D downscale function is bypassed when IRMs B, D, F, and H are above range 2.SRM detector not in startup position is bypassed when the count rate is yl00 CPS or the above condition is satisfied.

5~During repair or calibration of equipment, not more than one SRM or RBM channel nor more than two APRM or IRM channels may be bypassed.Bypassed channels are not counted as OPERABLE channels to meet the minimum OPSRABLS channel requirements.

Refer to section 3.10.B for SRM requirements during core alterations.

6i IRM channeie A, S, C, G all in range 8 or above bypasses SRM channels A and C functionsi I IRH channels Bp Fp Dy H all in range 8 or above bypasses SRM channels B and D functions.

7.The following operational restrainte apply to the RBM only.a.b.C~Both RBM channels are bypassed when reactor power is g30 percent.or vhen a peripheral (edge)control rod is selected.M The RBM need not be OPERABLS in the"startup" position of the reactbr"inside selector evitch.;,Pgxf Tvo RBM chisels are provided and only one of these may be bypassed w'iHi the console selector.The other channel may also be defeated only if the conditions of"e" or"f" are met>If the inoperable channel cannot be restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and the conditions of"e" or"f" are not met, the inoperable channel shall be placed in the tripped condition vithin one hour.0 BFH Unit 2 d.With both RBM channels inoperable, and the conditions of"e" or"f" not met, place at least one inoperable rod block monitor channel in the tripped condition within one hour.3.2-4.2-26 ta 0 ES FOR-ABLE.C Cont'd)7.(Continued) e.The RBM need not be OPERABLE when reactor pover is y90 percent and MCPR is g1.40.f.The RBM need not be OPERABLE when reactor power is'90 percent and MCPR is g1.70.8.This function is bypassed when the mode switch is placed in RUN.9.This function is only active when the mode svitch is in RUN.This function is automatically bypassed vhen the IRM instrumentation is OPERABLE and not high.10.The inoperative trips are produced by the folloving functions:

a.SRM and IRM (1)Local"operate-calibrate" switch not in operate.(2)Pover supply voltage lov.(3)Circuit boards not in circuit.b.APRM (1)Local"operate-calibrate" svitch not in operate.(2)Less than 14 LPRM inputs.(3)Circuit boards not in circuit.ci RBM (1)Local"operate-calibrate" svitch not in operate.(2)Circuit boards not in circuit.(3)RBH tails to null.(4)f esS than required number of LPRM inputs for rod selected.11.Detectdr trathrS8 iS ad)usted to 114+2 inches, placing the detector lover posl.tide k4 inches below the lover core plate.12.This function hiky be bypassed in the SHUTDOWH or REFUEL mode.If this function is ikbpsiabie at a time vhen opERABILITY is required the channel shall bh tripped or administrative controls shall be immediately iinpbsed to prevent control rod vithdrawal.

0 13.RBM upscale flow-biased setpoint clipped at 106 percent rated reactor powers BFH Unit 2 3.2/4.2-27 L4 0.f 0 3.2 BASES (Cont.'d)The instrumentation which initiates CSCS action is arranged in a dual bus system.As for other vital instrumentation arranged in this fashion, the specification preserves the effectiveness of the system even during periods when maintenance or testing is being performed.

An exception to this is when logic functional testing is being performed.

The control r'od block functions are provided to prevent excessive control rod withdrawal so that MCPR does not decrease to 1.07.The trip logic for this function is 1-out-of-n:

e.g., any trip on one of six APRMsf eight IRMs, or four SRMs will result in a rod block.A General Electric study, GE-HE-770-06-0392 shows for the Unit 2 cycle 6 core that if the initial MCPR is as specified in item 7e or 7f of Table 3.2.C, then no single rod withdrawal error can cause the MCPR to decrease below the MCPR safety limit.When core operating conditions have been verified to be within the limits of items 7e or 7f of Table 3.2.C, the RBM is not required.When the RBM is required, the minimum instrument channel requirements apply.These requirements assure sufficient instrumentation to assure the single failure criteria is met.The minimum instrument channel requirements for the RBM may be reduced by one for maintenance, testing, or calibration.

This does not significantly increase the risk of an inadvertent control rod withdrawal, as the other, channel is available, and the RBM is a backup system to the written sequence for withdrawal of control rods.The APRM rod block function is flow biased and prevents a significant reduction in MCPR, especially during operation at reduced flow.The APRM provides gross core protection; i.e., limits the gross core power increase from withdrawal of control rods in the normal withdrawal sequence.The trips are set so that MCPR is maintained greater than 1.07.The RBM rod block function provides local protection of the core;i.e., the prevention of critical power in a local region of the'core, for a single rod withdrawal error from a limiting control rod pattern, If the IRM channels are in the worst condition of allowed bypass, the sealing arrangement is such that for unbypassed IRM channels, a rod block signal is generated before the detected neutrons flux has increased by more than a factor of 10.A downscale indication is an indication the instrument has failed or the instrument is not sensitive enough.In either case the instrument will not respond t:o changes in control rod motion and thus, control rod motion is prevented.

The refueling interlocks also operate one logic channel, and are required for safety only when the mode switch is in the refueling position.0 For effective emergency core cooling for small pipe breaks, the HPCI system must function since reactor pressure does not decrease rapid enough to allow either core spray or LPCI to operate in time.The automatic pressure relief function ie provided as a backup to the HPCI in the event the HPCI does not operate.The arrangement of the tripping contacts is such as to provide this function when necessary and minimize spurious operation.

The trip settings given in the specification are BFH Unit 2 3/2/4.2-68 0 0'll CORE D COOLI S S S LM GCO I IO 0'0 IO SURVBIL CE RE U REME S 4.5.K inimum Critical Power 0 Except when the provisions of Hote 7 of Table 3.2.C are being employed due to the inoperability of the Rod Block Monitor, the minimum critical power ratio (MCPR)as a function of scram time and core flow, shall be equal to or greater than shown in Figure 3.5.K-l multiplied by the Kf shown in Figure 3.5.2, where:=0 or av A-, whichever is B greater 7A=0.90 sec (Speci.ficeti.on 3.3.0.1 scram time limit to 20K insertion from fully withdrawn)

H 2 1 I B=0.710+1.65-(0.053)[Ref.2]n n ave=C=n number of surveillance rod tests performed to date in cycle (including BOC test).Scram time to 20K insertion from fully withdrawn of the i" rod.tot~number of active rods measured in Specification 4.3ACel at BOC.If at any time during steady-state operation i.t is determined by normal surveillance that the limiting value for MCPR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits.If the steady-state MCPR is not returned to within the prescribed limits within two (2)hours, the reactor shall be brought to the Cold Shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, surveillance and corresponding action shall continue until reactor operation is within the prescribed limits.1.MCPR shall be determined daily during reactor power operation at y 25K rated thermal power and following any change in power level or distribution that would cause operation with a limiting control rod pattern as described in the bases for Specification

~.2.Except as provided by Note 7 of Table 3.2.C, the MCPR limit shall be determined for each fuel type SXS, 8X8R, P8XSR, from Figure 3.5.K-1, respectively, using: a.V=0.0 prior to initial scram time measurements for the cycle, performed in accordance with Specification 4.3.C.1.b., Vas defined in Specifi-cation 3.5.K following the conclusion of each scram-time surveillance test re-quired by Specifications 4.3.C.l and 4.3.C.2.The determination of the limit must be completed within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of each scram-time surveillance required by Specification 4.3.C.BFH Unit 3.5/4.5-19

ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT (BFN)REASON FOR CHANGE: The purpose for this change is to eliminate the requirement for the Rod Block Monitor (RBM)system when the Minimum Critical Power Ratio (MCPR)is within specified limits.Descri tion of Pro osed TS Amendment:

The proposed amendment introduces changes to allow the RBM to be inoperable when the MCPR is within specified limits.The analy-sis which supports this change is applicable to the Unit 2 cycle 6 core design only.This change will expire at the end of the current fuel cycle.Existin TSs: The existing TSs state in note 7 to table 3.2.C: 7~The following operational restraints apply to the RBM only.a~Both RBM channels are bypassed when reactor power is<30 percent and when a peripheral control rod is selected.b.The RBM need not be OPERABLE in the"startup" position of the reactor mode selector switch.c~d.Two RBM channels are provided and only one of these may be bypassed from the console.If the inopera-ble channel cannot be restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the inoperable channel shall be placed in the tripped condition within one hour.With both RBM channels inoperable, place at least one inoperable rod block monitor channel in the trip-ped condition within one hour.

I ENCLOSURE 2 (CONTINUED)

DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT (BFN)The current Bases for 3.2 states: The minimum instrument channel requirements assure sufficient instrumentation to assure the single failure criteria is met.The minimum instrument channel requirements for the RBM may be reduced by one for maint-enance, testing, or calibration.

This does not significantly increase the risk of an inadvertent control rod withdrawal, as the other channel is available, and the RBM is a backup system to the written sequence for withdrawal of control rods.The existing TSs state for section 3.5.K: The minimum critical power ratio (MCPR)as a function of scram time and core flow, shall be equal to or greater than shown in Figure 3.5.K-1 The existing TSs state for section 4.5.K.2: 2.The MCPR limit shall be determined for each fuel type 8X8, 8X8R, P8X8R, from Figure 3.5.K.1, respectively, using: Pro osed Chan e: The proposed change would modify note 7 of table 3.2.C as follows: 7.The following operational restraints apply to the RBM only.a~Both RBM channels are bypassed when reactor power is<30 percent or when a peripheral (edge)con-trol rod is selected.b.The RBM need not be OPERABLE in the"startup" position of the reactor mode selector switch.c Two RBM channels are provided and only one of these may be bypassed I

ENCLOSURE 2 (CONTINUED)

DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT (BFN)with the console selector.The other channel may also be defeat-ed only if the conditions of"e" or"f" are met.If the inopera-ble channel cannot be restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and the condi-tions of"e" or"f" are not met, the inoperable channel shall be placed in the tripped condition within one hour.d.With both RBM channels inoperable, and the conditions of"e" or"f" not met, place at least one inop-erable rod block monitor channel in the tripped condition within one hour.e.The RBM need not be OPERABLE when reactor power is>90 percent and MCPR is>1.40.f.The RBM need not be OPERABLE when reactor power is<90 percent and MCPR is>1.70.The Bases for 3.2 would be changed to: A General Electric study, GE-NE-770-06-0392 shows for the Unit 2 cycle 6 core that if the initial MCPR is as specified in item 7e or 7f of table 3.2.C, then no single rod withdrawal error can cause the MCPR to decrease below the MCPR safety limit.When core operating conditions have been verified to be within the limits of items 7e or 7f of table 3.2.C, the RBM is not required.When the RBM is re-quired, the minimum instrument channel re-quirements apply.These requirements assure sufficient instrumentation to assure the single failure criteria is met.The minimum instrument channel requirements for the RBM may be reduced by one for maintenance, test-ing, or calibration.

This does not signifi-cantly increase the risk of an inadvertent control rod withdrawal, as the other channel 0

ENCLOSURE 2 (CONTINUED)

DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT (BFN)will be available when the RBM is required, and the RBM is a backup system to the written sequence for withdrawal of control rods.Section 3.5.K would be changed as follows: Except when the provisions of note 7 of table 3.2.C are being employed due to the inoperab-ility of the Rod Block Monitor, the minimum critical power ratio (MCPR)as a function of scram time and core flow, shall be equal to or greater than shown in Figure 3.5.K-1 Section 4.5.K.2 is to be changed as follows: 2.Except as provided by note 7 of table 3.2.C, the MCPR limit shall be determined for each fuel type t JUSTIFICATION FOR THE CHANGE: The proposed amendment is be neficial in that it allows control rod withdrawal operations appropriate for proper core management at times when the RBM may be both inoperable and unneeded.The proposed amendment is safe because when there are no operable RBM channels, control rod withdrawal operations are limited to only those conditions where the MCPR is high enough that intervention by the RBM is not needed.The values of MCPR necessary to support rod withdrawal operation when RBM is inoperable are identified in study GE-NE-770-06-0392.

The GE study is applica-ble to the Unit 2 cycle 6 core only.Maintenance of MCPR within limits was previously required by TSs.Changing the value of the required MCPR limits does not add any new administrative require-ments.Substitution of the word"or" for"and" and addition of"(edge)" in note 7a of table 3.2.C is appropriate to clarify the operation of the system.Also, to clarify system operation, the words"from the console" were changed to"with the console selector" in note 7c.

ENCLOSURE 3 PROPOSED DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROWNS FERRY NUCLEAR PLANT (BFN)Bases for the Pro osed No Si nificant Hazards Consideration Determination:

The NRC has provided standards in 10CFR50.92 (c)for determining when a significant hazards consideration is involved.A discus-sion of each of those standards is as follows: The proposed amendment does not cause a significant increase in the probability or consequences of an accident previously evaluated.

The purpose of the Rod Block Monitor (RBM)system is to ensure that the Minimum Critical Power Ratio (MCPR)does not decrease below the fuel integrity safety limit during a rod withdrawal error event.The RBM accomplishes this by termi-nating an erroneous rod withdrawal event which could be in progress due to a human error.Since the RBM is designed to intervene after an error is already in progress, rather than to prevent the error, the probability of such an error being committed is not affected by this amendment.

MCPR is re-quired to be verified within the allowable range whenever reactor power is greater than or equal to 254 and following any change in power level or distribution which could cause operation on a thermal hydraulic limit.This amendment allows rod withdrawal operations with both RBM channels inoperable only when restrictive limits for MCPR are met.Since the pro-posed amendment only changes the range of allowable values for MCPR rather than changing the monitoring requirements, it does not increase the probability of an administrative error that could cause the MCPR to be violated.As shown by study GE-NE-770-06-0392, when the core is operated within the limits for MCPR specified in the proposed amendment, if an erroneous rod withdrawal were to occur, the MCPR would not decrease below the allowable safety limit even without the intervention of the RBM.The higher MCPR requirements speci-fied by the proposed amendment for operations without an operable RBM are within previously analyzed operating MCPR limits and thus are conservative for all other analyzed accidents and transients as well.For the above reasons, this amendment will not cause a significant increase in the probability or consequences of an accident previously evalu-ated.2~The proposed amendment does not create the possibility of a new or different kind of accident from any accident previous-ly evaluated.

0 ENCLOSURE 3 PROPOSED DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROWNS FERRY NUCLEAR PLANT (BFN)The proposed amendment substitutes more restrictive adminis-trative MCPR limits during rod withdrawals when RBM is inop-erable to ensure that the automatic function of the RBM will not be required.No single administrative error could lead to a failure to adequately monitor MCPR and also to a rod withdrawal error, therefore a new failure mode related to administrative requirements is not created.The proposed amendment does not cause or allow any alteration to any release barrier, protection system, or accident mitigation system other than the RBM as discussed above.The plant is not subjected to any new operating modes or environmental conditions as a result of the proposed amendment.

3.The proposed amendment does not involve a significant reduc-tion in a margin of safety.The RBM trip functions are designed to prevent local fuel damage as a result of a single rod withdrawal error.The proposed amendment allows the substitution of administrative limits for MCPR to ensure that rod motion will not have to be halted to prevent local fuel damage for a single rod with-drawal error.As shown by GE study GE-NE-770-06-0392, a postulated single rod withdrawal error under the provisions specified under this amendment would provide protection which is not significantly less than that which would be provided by the RBM.The MCPR requirements specified by the proposed amendment are within the allowable MCPR limits for normal plant operations therefore, analyses of events other than rod withdrawal errors are not adversely affected.Based on the above, this proposed amendment involves no signifi-cant hazards consideration.

,ENCLOSURE 4 GENERAL ELECTRIC REPORT GE-NE-770-06-0392, MARCH 1992 AND APPLICATION FOR WITHHOLDING PROPRIETARY.

INFORMATION FROM PUBLIC DISCLOSURE

('tr General Electric Company AFFIDAVIT I, Robert C, Mitchell, being duly sworn, depose and state as follows: I am Manager, Safety, Environmental 4 Quality Assurance, General Electric Company, and have been delegated the function of reviewing the information described in paragraph 2 which is sought to be withheld from public disclosure and have been authorized to apply for its withholding.

2.The information sought to be withheld is contained in a report to Tennessee Valley Authority, GE-NE-770-06-0392, March, 1992.The GE Proprietary portions are identifiable by the"GB Proprietary Information" designation at the top of the page, 3.In designating material as proprietary, General Electric utilizes the definition of proprietary information and trade secrets set forth in the American Law Institute's Restatement of Torts, Section 757.This definition provides: "A trade secret may consist of any formula, pattern, device or compilation of infor-mation which is used in one's business and which gives him an opportunity to obtain an advantage over competitors who do not know or use it....A substantial element of secrecy must exist, so that, except by the use of improper means, there would be difficulty in acquiring information....

Soine factors to be considered in determining whether given information is one's trade secret are: (1)the extent to which the information is known outside of his business;(2)the extent to which it is known by employees and others involved in his business;(3)the extent of mea-sures taken by him to guard the secrecy of the information; (4)the value of the in-formation to him and to his competitors; (5)the amount of effort or money ex-pended by him in developing the information; (6)the ease or difficulty with which the information could be properly acquired or duplicated by others." 4.Some examples of categories of information which fit into the definition of proprietary infor-mation are;a.Information that disclosed a process, method or apparatus where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; b.Information consisting of supporting data and analyses, including test data, relative to a process, method or apparatus, the application of which provide a competitive economic advantage, e.g., by optimization or improved marketability; c.Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality or licensing of a similar product', d.Information which reveals cost or price information, production capacities, budget levels or coinmercial strategies of General Electric, its customers or suppliers;

~K N 0 Affidavit e.Information which reveals aspects of past, present or future General Electric cus-tomer-funded development plans and programs of potential commercial value to General Electric;f.Information which discloses patentable subject matter for which it may be desirable to obtain patent protection; g.Information which General Electric must treat as proprietary according to agreements with other parties.5.Initial approval of proprietary treatment of a document is typically made by the Subsection manager of the originating component, who is most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge.

Access to such documents within the Company is limited on a"need to know" basis and such documents are clearly identified as proprietary.

6.*The procedure for approval of external release of such a document typically requires review by the Subsection Manager, Project manager, Principal Scientist or other equivalent author-ity, by the Subsection Manager of the cognizant Marketing function (or delegate)and by the Legal Operation for technical content, competitive effect and determination of the accuracy of the proprietary designation in accordance with tlie standards enumerated above, Disclo-sures outside General Electric are generally limited to regulatory bodies, customers and po-tential customers and their agents, suppliers and licensees, and then only with appropriate protection by applicable regulatory provisions or proprietary agreements.

7.The document mentioned in paragraph 2 above has been evaluated in accordance with the above criteria and procedures and has been found to contain information which is propri-etary and which is customarily held in confidence by General Electric.8.The information to the best of my knowledge and belief has consistently been held in confi-dence by the General Electric Company, no public disclosure has been made, and it is not available in public sources,'ll disclosures to third parties have been made pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the infor-mation in confidence.

9.Public disclosure of the information sought to be withheld is likely to cause substantial harm to the competitive position of the General Electric Company and deprive or reduce the availability of profit making opportunities because it would provide other parties, including competitors, with valuable information.

0 I Affidavit STATE OF CALIFORNIA

)COUNTY OF SANTA CLARA)Robert C.Mitchell, being duly sworn, deposes and says: That he has read the foregoing affidavit and the matters stated therein are true and correct to the best of his knowledge, information, and belief.Executed at San Jose, California, this~?day of 1992.Robert C.Mitchell General Electric Company Subscribed and sworn before me this~day of 1992.~I~~~I OFFICIAL SEAl MARY L KENDALL Notuy Pule.CaMcrnia SANTA GMRA COUNTY Qg Ccein.Exp.Mar.28, 39N Notary Public-California Santa Clara County Psst 3 l/g0~4 4.L 0