ML19077A061

From kanterella
Revision as of 15:55, 22 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 1 Tendon Tunnel Embedded Floor Drain Pipe Survey Unit 06211
ML19077A061
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/09/2019
From: Graham J
ZionSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
ZS-2019-0017
Download: ML19077A061 (32)


Text

=11+++ ()=11 2.6709 ()+0.002 9.7007 ()=4.0009 / ()=11 5.3407 ()+0.002 1.9406 ()=5.0607 /

()=111.0610 ()+180.45 2.7211 ()=1.3209 / ()=112.128 ()+180.45 5.449 ()=2.6407 /

4 12 /524.21

55 1 1 0 0 0 0 1 0 10 20 30 40 50 601.08E+061.45E+061.83E+062.20E+062.58E+062.95E+063.33E+063.70E+06Frequency Bin Histogram