Supplemental (Post-Outage) Response to NRC Generic Letter 2008-01
ML092730359
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/21/2009
From: Gambhir S K
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-08-01, GO2-09-132
Download: ML092730359 (4)


Text

Sudesh K. Gamobhir ENG Vice President, Technical Services NO TH ES Ph. Richland, WA 99352-0968 vJ- "' P.O. Box 968, PEO4 NORT W ESTPh. 509.377.8313 1 F. 509.377.2354 sgamnbhir@

energy-northwest.corn September 21, 2009 G02-09-132 10 CFR 50.54(f)U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Subject; COLUMBIA GENERATING STATION, DOCKET.NO.

50-397 SUPPLEMENTAL (POST-OUTAGE)

RESPONSE TO NRC GENERIC LETTER 2008-01

References:

1. NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling; Decay-Heat Removal, and Containment Spray Systems," dated January 11,.2008 2. Energy Northwest Letter, "Nine-Month Response to NRC Generic Letter 2008-01, 'Managing Gas Accumulation
in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems,'dated October 8, 2008 3. NRC Letter from C.F. Lyon (NRC) to J.V. Parrish (Energy'Northwest),"Columbia Generating Station -Re: Generic Letter 2008-01,'Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems' Proposed Alternative Course of Action (TAC No. MD7812)" dated August 21, 2008

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01 (Reference

1) to request that each licensee evaluate the licensing basis, design, testing, and corrective actions for the emergency core cooling system (ECCS), decay heat removal (DHR), and containment spray systems to ensure that gas accumulation is.maintained less than the amount that challenges operability of these systems, and that appropriate action is taken when conditions adverse to quality are identified.

Please find attached Energy Northwest's post-outage supplementaliresponse to the* nine-month response letter (Reference 2). This supplemental response is being submitted within 90 days of startup from the-refueling outage, as requested by the NRC in Reference 3, for actions that were deferred until the next refuelingoutage.

4A34

'_j ,-SUPPLEMENTAL (POST-OUTAGE)

RESPONSE TO NRC GENERIC LETTER 2008-01 Page 2 In summary., Energy Northwest has concluded that the subject systems at Columbia Generating Station remain operable with respect to the concerns outlined in GL 2008-01 regarding managing gas accumulation in these systems.There are no new commitments being made to the NRC by this letter beyond those previously referenced by Energy Northwest in Reference

2. If you have any questions, please contact MC Humphreys, Licensing Supervisor, at (509) 377-4025.I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.uctfully, SK Gambhir Vice President, Technical Services Attachment cc: EE Collins, Jr. -NRC RIV NJ DiFrancesco

-NRC NRR NRC Senior Resident Inspector/988C WA Horin -Winston & Strawn RN Sherman -BPA/1 399 SUPPLEMENTAL (POST-OUTAGE)

RESPONSE TO NRC GENERIC LETTER 2008-01 Attachment Page 1 of 2 This attachment provides the Supplemental (Post-Outage)

Response to Generic Letter (GL) 2008-01 for actions that were deferred until the next refueling outage as requested by the NRC in Reference 3 of the cover letter.A. EVALUATION RESULTS 1. Design Basis Documents A number of minor clarifications were added to technical analyses based on information from GE Reports that were previously discussed in Energy Northwest's (EN) nine-month response to the GL. In addition, allowable time frames for air to vent from the emergency core cooling system (ECCS) which have either local vent pipes or extended vent pipes directed to floor drains were documented.

2. Confirmatory Walkdowns An evaluation was performed regarding the need to walkdown and/or ultrasonic test remaining inaccessible regions of residual heat removal (RHR) B discharge piping as well as all related ECCS, containment spray, and residual heat removal system piping located in the primary containment.

Based on this evaluation, it was concluded that no further walkdowns of the remaining piping were necessary.

This was based on the following:

ECCS (i.e., high pressure core spray (HPCS), low pressure core spray (LPCS), and low pressure coolant injection (LPCI)) discharge piping from the containment penetration into the reactor vessel is located downstream of motor operated injection valves. As documented in EN's nine-month response, an analysis of ECCS piping downstream of the injection valves has concluded that the existence of air voids will have no adverse consequences related to accident conditions.

Containment spray discharge paths downstream of the containment isolation valves are voided by design.ECCS suppression pool discharge (return) paths entering the containment discharge directly into the Suppression Pool through open ended connections that are below the water level. A section of the return piping is above the suppression pool water level. The configuration of these return lines coupled with the atmospheric pressure of the wetwell will keep these lines full of water.SECGCS suppression pool suction between the containment penetration and the suppression pool involves entirely submerged piping." The remaining RHR B discharge piping outside of the containment is inaccessible due to physical restrictions.

Drawing reviews of this 18 inch piping indicates that this section is horizontal and approximately 43 feet in SUPPLEMENTAL (POST-OUTAGE)

RESPONSE TO NRC GENERIC LETTER 2008-01-Attachment Page 2 of 2 length with all branch lines dropping from the bottom of the main piping. The branch line for the test line to the suppression pool originates off this line near the downstream end and is flow tested quarterly.

The minimum required Froude number of 0.60 with 3000 gpm flow will ensure entrained or trapped air is removed from the system. The quarterly test involves flows of at least 7100 gpm into the wetwell. This test was last performed on September 15, 2009.3. Vent Valves Evaluations have been completed regarding two locations on HPCS discharge piping and one location on LPCS discharge piping. Although not required, the conclusion was made that the addition of valves at these locations could aid in venting affected portions of piping when other means were not available (e.g., dynamic flushing).

Plans have been initiated to develop design change packages to support addition of the vent valves.4. Procedures No new procedure changes beyond those documented in Energy Northwest's nine-month response to the GL were required.B. DESCRIPTION OF NECESSARY ADDITIONAL CORRECTIVE ACTIONS 1. Additional Corrective Actions No new corrective actions were identified.

2. Corrective Action Updates All corrective actions identified in Columbia's nine month response to the GL have been completed with the exception of the following:

0 Correct HPCS drawing discrepancies. (Currently scheduled for completion on 9/30/09 per AR 00176497-27.)

0 Evaluate the feasibility of adding tubing to RHR B system high point vent.(Currently scheduled for completion on 10/20/09 per AR 00176497-33.)

Conclusion Energy Northwest has evaluated the previously unevaluated portions of the applicable systems at Columbia that perform the functions described in the GL and has concluded that these systems remain operable.