ML13162A779

From kanterella
Revision as of 19:02, 11 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000390-13-302
ML13162A779
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/06/2013
From: Widmann M T
Division of Reactor Safety II
To: Shea J W
Tennessee Valley Authority
References
IR-13-302
Download: ML13162A779 (6)


See also: IR 05000390/2013302

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

June 6, 2013

Mr. Joseph W. Shea Vice President, Nuclear Licensing

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION 05000390/2013302

Dear Mr. Shea:

In a telephone conversation on May 31, 2013, between Mr. K. Skubisz, Examination Project Manager, and Mr. M. Meeks, Senior Operations Engineer, arrangements were made for the

administration of licensing examinations at Watts Bar Nuclear Plant. The operating test is scheduled to be administered during the weeks of October 14 and October 21, 2013. The

written examination is scheduled to be administered the week of October 28, 2013. The on-site preparatory week is scheduled for the week of September 23, 2013.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss

with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by July 31, 2013. Mr. Meeks provided the

written examination outline to your staff in June 2012. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by August 19, 2013. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

J. Shea 2

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the

Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component

of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

J. Shea 3

Thank you for your cooperation in this matter. Mr. Skubisz has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail: Michael.Meeks@nrc.gov), or me at (404) 997-4550, (Internet E-mail:

Malcolm.Widmann@nrc.gov

). Sincerely, /RA/ Malcolm T. Widmann, Chief

Operations Branch 1

Division of Reactor Safety

Docket No.: 50-390

License No.: NPF-90

cc: (See page 4)

_________________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME MEEKS WIDMANN DATE 6/6/2013 6/6/2013 6/ /2013 6/ /2013 6/ /2013 6/ /2013 6/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

J. Shea 4

cc: Mr. T. P. Cleary

Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority

Electronic Mail Distribution

David H. Gronek

Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority

Electronic Mail Distribution

Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

Mr. E. D. Schrull Manager, Corporate Licensing

Watts Bar Nuclear Plant

Tennessee Valley Authority

1101 Market Street, LP 4B-C

Chattanooga, TN 37402-2801

Edward J. Vigluicci

Associate General Counsel, Nuclear

Tennessee Valley Authority

Electronic Mail Distribution

Gordon P. Arent

Senior Manager, Licensing WBN Unit 2

Watts Bar Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

County Mayor

Watts Bar Unit 1

P.O. Box 156

Decatur, TN 37322

County Executive

Watts Bar Unit 1

375 Church Street

Suite 215

Dayton, TN 37321

Tennessee Department of Environment &

Conservation

Division of Radiological Health

401 Church Street

Nashville, TN 37243

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Watts Bar Nuclear Plant 1260 Nuclear Plant Road

Spring City, TN 37381-2000

Ann Harris

341 Swing Loop

Rockwood, TN 37854

Tennessee Valley Authority

ATTN: Ms. Betsy Eiford-Lee

Training Manager Watts Bar Nuclear Plant P. O. Box 2000

Spring City, TN 37381

Letter to Joseph W. Shea from Malcolm T. Widmann dated June 6, 2013

SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000390/2013302

DISTRIBUTION

RIDSNRRDIRS

PUBLIC RidsNrrPMWattsBar1 Resource

RidsNrrPMWattsBar2 Resource