CNS-17-041, ISFSI - Registration of Spent Fuel Storage Cask

From kanterella
Revision as of 06:58, 6 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ISFSI - Registration of Spent Fuel Storage Cask
ML17227A243
Person / Time
Site: Catawba, 07201031  Duke Energy icon.png
Issue date: 08/15/2017
From: Simril T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CNS-17-041
Download: ML17227A243 (2)


Text

ENERGY. CNS-17-041 August 15, 2017 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station, Units 1 and 2 Facility Operating License Numbers NPF-35 and NPF-52 Docket Numbers 50-413 and 50-414 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Cask Tom Simril Vice Pres i dent Catawba Nuclear Station Duke Energy CN01 VP I 4800 Concord Road York, SC 297 4 5 o: 803.701.3340 f: 803.701.322 1 tom .sim ril@duke-energy

.com 10 CFR 72.212 Catawba Nuclear Station is currently loading spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model Number MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 2, Revision Number 1. In accordance with 10 CFR 72.212(b )(2), Duke Energy hereby registers the use of Cask Identification Numbers CN-VCC-83 and CN-VCC-84.

Loading of cask CN-VCC-83 was completed and the cask was placed on the ISFSI pad on July 17, 2017. Loading of cask CN-VCC-84 was completed and the cask was placed on the ISFSI pad on July 31, 2017. There are no NRC commitments contained in this letter. Please direct questions on this matter to Carrie Wilson , Sr. Engineer, Catawba Regulatory Affairs, at (803) 701-3014. Sincerely , Tom Simril Vice President , Catawba Nuclear Station www.duke-energy

.com U.S. Nuclear Regulatory Commission CNS-17-041 Page 12 August15,2017 xc: C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 J. D. Austin, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station M. Mahoney, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mailstop 0-8H4A Rockville, MD 20852 S.E. Jenkins, Manager S.C. DEHEC Radioactive

& Infectious Waste Management jenkinse@dhec.sc.gov