RA-18-0132, Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes

From kanterella
Revision as of 05:10, 5 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes
ML18225A274
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/13/2018
From: Wooten B B
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-18-0132
Download: ML18225A274 (14)


Text

(-, DUKE ENERGY August 13, 2018 Serial: RA-18-0132 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Report of 1 O CFR 50.59 Evaluations, 1 O CFR 72.48 Evaluations, and Commitment Changes Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461

Reference:

Letter from Annette H. Pope (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes, dated August 10, 2016, ADAMS Accession Number ML 16238A 150. Ladies and Gentlemen:

In accordance with 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2), Duke Energy Progress, LLC. (Duke Energy), is providing a report summarizing the 1 O CFR 50.59 and 1 O CFR 72.48 evaluations of changes, tests, and experiments implemented during the period from August 1 , 2016, to July 31, 2018. The 1 O CFR 50.59 report is provided in Enclosure 1 and the 1 O CFR 72.48 report is provided in Enclosure

2. In addition, a summary of commitment changes since July 31, 2016 (i.e., the previous report of 1 O CFR 50.59 Evaluations and Commitment Changes), made in accordance with Duke Energy's commitment management program (i.e., AD-LS-ALL-0010, Commitment Management), is provided in Enclosure
3. No new regulatory commitments are contained in this submittal.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager -Regulatory Affairs, at (91 O) 832-2487.

Sincerely, 1~)ik/JtL--

Bryan B. Wooten Director -Organizational Effectiveness Brunswick Steam Electric Plant TMS/tms