MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 2024-09-03
[Table view] |
Text
SECURITY-RELATED INFORMATION
-WITHHOLD UNDER 10 CFR 2.390 Nebraska Public Power District Always there when you need us NLS2014075 50.90 July 28, 2014 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001
Subject:
Supplement to License Amendment Request -Revision of Cyber Security Plan Implementation Schedule Cooper Nuclear Station, Docket No. 50-298, DPR-46
Reference:
Letter from Oscar A. Limpias, Nebraska Public Power District, to U.S. Nuclear Regulatory Commission, dated March 14, 2014, "License Amendment Request -Revision of Cyber Security Plan Implementation Schedule" (NLS2014022)
Dear Sir or Madam:
In the Reference letter, Nebraska Public Power District (NPPD) requested an amendment to Facility Operating License DPR-46 for Cooper Nuclear Station (CNS) to revise the Physical Protection license condition as it relates to the cyber security plan. The License Amendment Request (LAR) proposed a change to the CNS Cyber Security Plan (CSP) Milestone 8 implementation date as set forth in the previously approved CNS CSP Implementation Schedule.The purpose of this letter is to provide a supplement to the LAR submitted by the Reference letter.Attachment 1 of the Reference letter provided an analysis of the proposed change. In the Technical Evaluation provided in Attachment 1 of the Reference letter, NPPD identified the specific requirements of the CNS CSP that CNS needs additional time to implement, as well as the justification for needing additional time to implement those requirements.
NPPD has since determined that additional time is required to implement another aspect of the CNS CSP. This change is discussed in the Attachment to this letter.This LAR supplement does not impact any other aspects of the LAR submitted per the Reference letter. It does not change the conclusions or the basis of the no significant hazards consideration previously provided with the Reference letter. NPPD requests that this supplemental information be considered in conjunction with approval of the Reference LAR.NOTE: The Attachment to this letter contains Security-Related Information.
Upon separation from the Attachment, the cover letter is decontrolled.
COOPER NUCLEAR STATION 5 2(c A P.O. Box 98 / Brownville, NE 68321-0098 Telephone:
(402) 825-3811 / Fax: (402) 825-5211 www.nppd.com SECURITY-RELATED INFORMATION
-WITHHOLD UNDER 10 CFR 2.390 NLS2014075 Page 2 of 2 The Attachment contains security-related information; therefore, NPPD requests that this attachment be withheld from public disclosure in accordance with 10 CFR 2.390.This letter contains no regulatory commitments.
By copy of this letter and its attachments, the appropriate State of Nebraska official is notified in accordance with 10 CFR 50.91(b)(1).
Copies are also being provided to the NRC Region IV office and the CNS Resident Inspector in accordance with 10 CFR 50.4(b)(1).
Should you have any questions concerning this letter, or require additional information, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.I declare under penalty of perjury that the foregoing is true and correct.Executed on: 7______--Since 4ely, Os ar A. Limpias Vice President
-Nuclear and Chief Nuclear Officer/lb
Attachment:
Supplemental Information for License Amendment Request Revision of Cyber Security Plan Implementation Schedule cc: Regional Administrator w/attachment USNRC -Region IV Cooper Project Manager w/attachment USNRC -NRR Project Directorate IV-1 Senior Resident Inspector w/attachment USNRC -CNS Nebraska Health and Human Services w/attachment Department of Regulation and Licensure NPG Distribution w/o attachment CNS Records w/attachment NOTE: The Attachment to this letter contains Security-Related Information.
Upon separation from the Attachment, the cover letter is decontrolled.