ML18249A151

From kanterella
Revision as of 04:33, 28 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Figures
ML18249A151
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/13/2018
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18249A165 List:
References
RA-18-0131
Download: ML18249A151 (4)


Text

~  !"#$ $$#$!"$!#%!##$ $ !" $!# !' $!( #)%!##$ $ !" $!# !' $!( #(~DUKE ENERGY

(., DUKE ENERGY 80 --* * .,,

  • N 0 f 60 Cl: l&I IL .j C I 40 ... :z: I-0 ... IC ';I. LOW FW RECIRC. RUNBACK l 20 0 20 40 60 80 E % RATED CORE FLOW { % OF 7 7. 0
  • 10 lbs./hr) NOTES 1. See Table 14.2.1 -2 for definition of test conditions
2. Constant Pump Speed Lines a. Natural circulation
b. 20'%, Pump speed c. Analytical lower limit of master flow control d. Contractual lower limit of flow control e. Rated pump speed (results in rated flow at rated power) 100

(., DUKE ENERGY ADMINISTRAT1\IE SUPERVISOR SRO* AOMI .. ISTRATIVE GROUP TRAINING COORDINATOR SRO* OPERATING SUPER\IISOR SRO SHIFT (Al SUPERVISOR SRO SHIFT FOREMAN SRO CONTROL OPERATORS AO AUXILIARY OPERATIONS MAINTENANCE SUPERVISOR SRO* INSTRUMENTATION

  • CONTROL FOREMAN I* C TECHNICIANS ELECT A IC IANS -MECHANIC FOREMAN MECHANICS ENGINEERI

.. C ENIIIRONMENTAL SUPERVISOR

  • RADIATION SRO* CONTROL SUPERVISOR SRO* !ENGINEERS SRO* RADIATION CONTROL* TEST FOREMAN RC* T TECHNICIA

.. S SRO DESIRED, (Al REQUIRED ON SHIFT WHEN SIGNIFICANT TESTING IS IN PROGRESS DURING STARTUI' PROGRAM rLANT MANAGE~~ SRO PLANT QA SUPERINTENOE

.. T SUPERVISOR SAO* SRO* K.NGINl!:IERS SRO* GENSSS OPERATIO .. S MANAGER STARTUP *TEST SUPftRVISOR GE OPERATIONS SUPERINTENDENT STARTUP

  • TEST ENGINEERS GE SHIFT SUPERINTENDENTS H GE I SITE MANAGER GE -LEAD ENGINEER GE 5HIFT TEST ENGINEERS

(~DUKE -c ENERGY QA SUl'll:RVISOR SRO* QA ENGINU;RS SRO* GENSSS OPERATIONS MANAGl:R GIE OPERATIONS SUPl:RINTENCIENT GE SHIFT SUPl!.R,NTl!:NDl!'.NTS GE SITE MANAGKR QI;: LIEAD ENGINEER Q~SHlf"T Tl!ST l:NGINll!:ERS r------------------------------+

ADMINISTRATIVE SUP-ERVISOR SRO* STARTUP* TEST SUPERVISOR STARTUP

  • TEST ENGINEERS r I I I I I L ENGINEERING SUPERVISOR SRO* 7 PLANT MANAGER SRO* PLANT SUPERINTENDENT

-.J ENVIRONMENTAL

& RADIATION CONTROL SUPERVISOR SRO* RACIIATION CONTROL

  • TEST ISOREMAN ENGINEERS SR0 111 ENGINEERS SRO* ' (11) OPERAl"tON SUPERVISOR SRO 7 SHIPT (A) SUPERVISOR SRO SAO DESIRED RC* T TECHNICIANS RC* T TECHNICIANS L--------TO THE LEFT DIS DA5HED LINE SHOWS PERSONNEL ASSIG Nl!D TO UNIT NO.) STARTUP _J SHIFT FOREMAN SAO CONTROL OPERATORS RO AUXILIARY OPERATORS (A) REQUIRED ON SHIFT WHIEN SIGNIFICANT TESTING IS IN PROGRESS DURING INITIAL STARTUP PROGRAM. WHEN SIC:NIFICANT TESTING IS NOT IN PROGRESS.

SHIFT CREW WILL AEV~RT TO NORMAL 2 UNIT OPERATING CREW. (Bl MATTERS CONCERNING UNIT 1 WILL BE COORCIINATll!:D THROUGH STARTUP SUPERVISOR.

L SHll'T PORl!:MAN SAO CDNTADL OPERATORS Ro AUXILIARY OPERATORS MAINTENANCE SUPEAVlliOA SRO r -----7 ADMINISTRATIVE GROUP TRAINING COORDINATOR SRO* I INSTRUMIErtTATION I INSTRUMENTATtON I

  • CONTROi,.

._ _ __,.1-----1

  • CONTROL FOR£MAN FOREMAN __J i*c T£CHNICIANS ELECTRICIANS MECHANIC FOREMAN MECHANICS I I J 1
  • C T!E:CHNICIANS 11!:LECTIUC IANS MECHANIC FOAl:MAN MECHANICS