ML18337A363
From kanterella
Revision as of 04:30, 22 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML18337A363 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 05/10/2017 |
From: | Hamilton T M Duke Energy Progress |
To: | Office of Nuclear Reactor Regulation |
Barillas M C DORL/LPL2-2 301-415-2760 | |
Shared Package | |
ML18337A205 | List:
|
References | |
HNP-17-029 | |
Download: ML18337A363 (32) | |
Similar Documents at Harris | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23118A1392023-04-28028 April 2023
[Table view]Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes RA-23-0049, Enclosure 1 - Shearon Harris Nuclear Power Plant, Unit 1, Updated Final Safety Analysis Report, Amendment 65 - Redacted Version (Publicly Available Information)2023-04-28028 April 2023 Enclosure 1 - Shearon Harris Nuclear Power Plant, Unit 1, Updated Final Safety Analysis Report, Amendment 65 - Redacted Version (Publicly Available Information) RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes ML20147A0412020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Documents Incorporated by Reference Updated Since Amendment No. 62 RA-20-0134, Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 22020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 2 ML20147A0182020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20147A0222020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML20147A0322020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 15, Accident Analysis ML20147A0232020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (Redacted) ML20147A0242020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML20147A0252020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 8, Electric Power ML20147A0422020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 1 of 2 ML20147A0362020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Appendices ML20147A0372020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Figures Flagged for Redaction ML20147A0342020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 17, Quality Assurance During Design and Construction ML20147A0302020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML20136A1632020-05-15015 May 2020 Submittal of Updated Final Safety Analysis Report (Amendment 63), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes ML20147A0332020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification ML20147A0312020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML20147A0382020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, List of Effective Pages ML20147A0282020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20147A0272020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 10, Summary Description ML20147A0392020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Information Removed from Amendment ML20147A0292020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 12, Radiation Protection (Redacted) ML20147A0262020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 9, New and Spent Storage and Handing (Redacted) ML20147A0172020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Cover Sheet ML20147A0212020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 4, Reactor ML20147A0352020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 18, Final Safety Analysis Supplement for License Renewal RA-19-0160, Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 32019-03-29029 March 2019 Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3 HNP-17-029, UFSAR Rev 61, End Appendices2017-05-10010 May 2017 UFSAR Rev 61, End Appendices ML18337A3992017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 8 ML18337A3952017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 7 ML18337A3922017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 6 ML18337A3892017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 5 ML18337A3862017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Drawings Part 4 ML18337A3842017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Drawings Part 3 ML18337A3832017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Drawings Part 2 ML18337A3792017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings Part 1 ML18337A3632017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 18, Final Safety Analysis Report Supplement for License Renewal ML18337A3522017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Chapter 16, Preliminary Technical Specification (PSAR) ML18337A3482017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 15, Accident Analysis ML18337A3432017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 14, Initial Test Program ML18337A3372017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 13, Conduct of Operations ML18337A3342017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 12, Radiation Protection ML18337A3292017-05-10010 May 2017 UFSAR Rev 61, Chapter 11, Radioactive Waste Management ML18337A3092017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 10, Summary Description ML18337A3032017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 9, New and Spent Fuel Storage and Handling ML18337A2872017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 7, Instrument and Controls ML18337A2792017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 6, Engineered Safety Features ML18337A2782017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 5, Reactor Coolant System and Connected Systems 2023-04-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18337A363&oldid=1344092"