Closure of Confirmatory Action Letter NRR-07-022 (TAC Nos. MD4166 and MD4167)
ML080160211
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/30/2008
From: Catherine Haney
Plant Licensing Branch III-2
To: Hamilton B H
Duke Power Co
Olshan L N, NRR/DORL, 415-1419
References
TAC MD4166, TAC MD4167, NRR-07-022
Download: ML080160211 (4)


Text

January 30, 2008

Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 2 AND 3 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-022 (TAC NOS. MD4166 AND MD4167)

Dear Mr. Hamilton:

On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070790113) regarding dissimilar metal welds in the pressurizers at Oconee Nuclear Station, Units 2 and 3. This letter acknowledges receipt of your letter dated December 13, 2007 (ADAMS Accession No. ML073532226) informing the NRC of actions taken in response to this CAL at Oconee Unit 3. The NRC has previously acknowledged actions taken at Oconee Unit 2 by letter dated September 12, 2007 (ADAMS Accession No. ML072130497).

In your letter, you informed us of the mitigative actions taken at Oconee Unit 3, which consisted of the application of full structural weld overlays to the Alloy 82/182 welds of the pressurizer surge, spray, and safety/relief nozzle and safe end welds. The results of the ultrasonic examinations were included in the letter.

Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters (ADAMS Accession Nos. ML070390049 and ML070600169) have been met for Oconee Units 2 and 3. No further response is required regarding the CAL.

We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Based on these actions, TAC No. MD4167 will be closed. TAC No. MD4166 was closed previously.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

B. Hamilton

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in t he NRC Public Document Room or from the NRC

=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/ Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-270 and 50-287

cc: See next page

ML080160211 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPL2-1/PM LPL2-1/LA LPL2-1/BC (A)

NAME TLupold TChan LOlshan MO'Brien JStang DATE 1/17/08 1/17/08 1/16/08 01/16/08 1/18/08

OFFICE DCI/D DRS/D RII DORL/D NAME MEvans HChristensen for JShea CHaney DATE 1/17/08 By email 1/30/08 1/30/08 Oconee Nuclear Station, Units 1, 2, and 3 January 31, 2008

cc:

Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672

Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202

Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035

Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672

Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708

Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209

Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation

ON03RC 7800 Rochester Highway Seneca, SC 29672

Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602

Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202

Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721

Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210

Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006

Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852

Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202