ML11311A192

From kanterella
Revision as of 21:45, 8 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
LaSalle County Station, Unit 1 - Acceptance Review for Amendment Regarding Technical Specification Change for Minimum Critical Power Ratio
ML11311A192
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/07/2011
From: Joel Wiebe
Plant Licensing Branch III
To: Pacilio M
Exelon Generation Co
References
Download: ML11311A192 (2)


Text

1 NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Monday, November 07, 2011 11:01 AM To: Michael Pacilio Cc: Mitchel Mathews; David Gullott; Billoch, Araceli

Subject:

LaSalle County Station, Unit 1 - Acceptanc e Review for Amendment Regarding Technical Specification Change for Minimum Critical Power RatioDear Mr. Pacilio By letter dated October 12, 2011(Agencywide Documents Access and Management System (ADAMS)

Accession No. ML112860068), Exelon Generation Company, LLC, submitted a license amendment for LaSalle County Station (LSCS), Unit No.1. The proposed change revises the LSCS, Unit 1 minimum critical power ratio safety limit (MCPR SL) in TS Section 2.1*1, "Reactor Core SLs." This change is required to support the upcoming LSCS, Unit 1, Cycle 15 operation. Cycle 15 will be the first cycle of operation with a mixed core containing the following fuel types: Fresh Global Nuclear Fuel (GNF) GNF2 fuel, and reloaded AREVA ATRIUM-10 fuel. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact Araceli Billoch Colon at (301) 415-3302.

Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_PMDA Email Number: 195 Mail Envelope Properties (Joel.Wiebe@nrc.gov20111107110100)

Subject:

LaSalle County Station, Unit 1 - Acceptance Review for Amendment Regarding Technical Specification Change for Minimum Critical Power Ratio Sent Date: 11/7/2011 11:01:14 AM Received Date: 11/7/2011 11:01:00 AM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients: "Mitchel Mathews" <Mitchel.Mathews@exeloncorp.com> Tracking Status: None "David Gullott" <David.Gullott@ExelonCorp.com> Tracking Status: None "Billoch, Araceli" <Araceli.Billoch@nrc.gov> Tracking Status: None "Michael Pacilio" <Michael.Pacilio@exeloncorp.com> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 2237 11/7/2011 11:01:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: