Letter Sequence Approval |
---|
EPID:L-2021-LLR-0016, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair (Approved, Closed) |
|
MONTHYEARRS-21-034, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair2021-03-0707 March 2021 Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair Project stage: Request RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs Project stage: Request ML21089A0542021-03-15015 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Relief Request I4R-12, Revision 1 Valve Repairs on Valves 2B33-F060A and 2B33-F060B Project stage: Approval RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 Project stage: Supplement RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 Project stage: Request ML21089A0562021-03-30030 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Request for an Alternative I4R-12, Revision 2 Valve Repairs on Valves 2B33-F060A and 2B33-F060B Project stage: Other ML21188A0192021-07-28028 July 2021 Proposed Alternative I4R-12, Revision 2 from Code Surface Examinations Requirements of the ASME Code for Valves 2B33 F60A and 2B33 F60B Repairs Project stage: Other 2021-03-30
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML23328A0132023-11-22022 November 2023 Supplement - Security Rule Exemption Request ISFSI Docket No. Reference (L-2023-LLE-0028) ML23304A0162023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - LaSalle 1 & 2 - Exemption from Security Rule (L-2023-LLE-0028) ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23153A1562023-06-0202 June 2023 NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request ML23151A6602023-05-31031 May 2023 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of I4R-14 ML23150A2482023-05-25025 May 2023 NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request ML23095A1892023-04-0505 April 2023 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Audit Plan PTLR Amendment Request ML23074A0372023-03-14014 March 2023 NRR E-mail Capture - (External_Sender) Implementation of Exigent Amendment ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23044A0452023-02-13013 February 2023 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Lower Downcomer Braces Analysis ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22357A0382022-12-23023 December 2022 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Relocate the Pressure and Temperature Limit Curves ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22138A4112022-05-18018 May 2022 NRR E-mail Capture - Lasalle 1 and 2 - (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) ML22126A0392022-05-0606 May 2022 NRR E-mail Capture - Lasalle 1 and 2 Draft (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to TS Sections 4.3.1 and 5.6.5 ML22066A7622022-03-0707 March 2022 NRR E-mail Capture - Verbal Authorization - EPID-L-2022-LLR-0028, LaSalle Unit 1 Request for Alternative Examination for Repairs of Flow Control Valves 1B33-F060A and 1B33-F060B ML22062B0232022-03-0303 March 2022 NRR E-mail Capture - EPID-L-2022-LLR-0028, LaSalle Unit 1, Request for Additional Information (Rai), LaSalle Unit 1, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0692022-01-14014 January 2022 NRR E-mail Capture - (External_Sender) IEMA Response: State Consultation - LaSalle 1 and 2: License Amendment Request Re; Revision of Technical Specifications to Incorporate GNF CRDA Methodology ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21361A2982021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Control Rod Drop Accident (CRDA) Implementation Schedule ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21210A0942021-07-29029 July 2021 NRR E-mail Capture - La Salle, 1 & 2 - Acceptance of Licensing Action License Amendment Request New Fuel Storage Vault and Spent Fuel Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) ML21207A0072021-07-26026 July 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) License Amendment Request to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology(EPID-L-2021-LLA-0016) ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21120A0552021-04-29029 April 2021 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Closeout of Bulletin 2012-01, Design Vulnerability in Electric Power System ML21119A2282021-04-29029 April 2021 NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle, EPID-L-2020-LLA-0018, License Amendment Request (LAR) TSTF-505 ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21089A0562021-03-30030 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Request for an Alternative I4R-12, Revision 2 Valve Repairs on Valves 2B33-F060A and 2B33-F060B ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application 2024-09-06
[Table view] |
Text
From: Vaidya, Bhalchandra Sent: Monday, March 15, 2021 3:41 PM To: Taken, Jason C.:(Exelon Nuclear); Kusumawatimurray, Putri:(Exelon Nuclear)
Cc: Salgado, Nancy; Mitchell, Matthew
Subject:
LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Relief Request I4R-12, Revision 1 re: Valve Repairs on Valves 2B33-F060A and 2B33-F060B Jason and Dwi, By telephone conversation on March 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) staff provided a verbal authorization to Exelon Generation Company for the proposed Alternative I4R-12, Revision 1, for LaSalle County Station Unit No. 2 from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section III, Rules for Construction of Nuclear Facility Components and Section XI Rules for Inservice Inspection of Nuclear Power Plant Components, related to the current refueling outage L2R18 repairs of Valves 2B33-F060A and 2B33-F060B.
The following NRC and licensee personnel participated in the conference call:
NRC Bhalchandra K. Vaidya, Licensing Project Manager, Plant Licensing Branch III, Office of Nuclear Reactor Regulation Nancy Salgado - Chief, Plant Licensing Branch III, Office of Nuclear Reactor Regulation Matthew Mitchell - Chief, Piping and Head Penetrations Branch, Office of Nuclear Reactor Regulation Exelon Generation Company Kusumawatimurry Putri, Senior Manager Licensing Jason Taken, Licensing Engineer David Anthony - NDE Brendan Casey - Engineering Mark DiRado - Sr Manager, Component Programs Caleb Carten - Engineer Jereme Greenblott - Regulatory Assurance David Gullott - Director, Licensing Armando Johnson - Director, Engineering Terry Lanc - Regulatory Assurance Amy McMartin - Director, Engineering Jay Miller - NDE Sailaja Mokkapati - Sr Manager, Engineering Please contact me if you have any questions.
Bhalchandra K. Vaidya US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing
LPL3 301-415-3308 Bhalchandra.vaidya@nrc.gov VERBAL AUTHORIZATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOR PROPOSED ALTERNATIVE NUMBER I4R-12 ALTERNATIVE EXAMINATION REQUIREMENTS FOR REPAIR OF REACTOR RECIRCULATION FLOW CONTROL VALVES EXELON GENERATION COMPANY, LLC LASALLE COUNTY STATION, UNIT 2 DOCKET NO. 50-374 March 11, 2021 Technical Evaluation read by Matthew Mitchell, Chief of the Piping and Head Penetrations Branch, Office of Nuclear Reactor Regulation By letter to the U.S. Nuclear Regulatory Commission (NRC) dated March 7, 2021, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21067A000), as supplemented by letter dated March 9, 2021 (ADAMS Accession No. ML21068A442) Exelon Generation Company, LLC (the licensee) proposed an alternative to certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section III, Rules for Construction of Nuclear Facility Components and Section XI Rules for Inservice Inspection of Nuclear Power Plant Components, related to the repair of degraded Reactor Recirculation Flow Control Valves 2B33-F060A (the A Valve) and 2B33-F060B (the B Valve) at LaSalle County Station, Unit 2 (LaSalle Unit 2). The licensee submitted proposed alternative I4R-12 for the use of Enhanced Visual Testing (EVT) examination requirements in lieu of the ASME Code-required Penetrant Testing (PT) and Radiographic Examination (RT) for the repairs.
The licensee requested authorization for this alternative in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(z)(2) on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
During refueling outage L2R18 in February 2021, inspections of the A and B Valves discovered damage to each valve's internals and lower body. The licensee will conduct repairs to restore the valves to an acceptable condition. These repairs will consist of machining and grinding the inside surface of the valves and building up the inner surface with weld metal to restore the nominal wall thicknesses of the valves. While the wear on the inside surface of the valves did not go below the minimum wall thicknesses of 2.418 inches, the surface conditioning of the valves will reduce the total thickness to below the minimum by an estimated to 0.135 inches and 0.095 inches for the A and B Valves, respectively. The completed repairs will restore the nominal wall thickness of 3.45 inches for A Valve and 3.7 inches for the B Valve. The weld buildup on these valves will be on the inner surface and will be pressure-retaining in that they restore the valves to over their minimum wall thickness hence being required for structural integrity but not for leak tightness.
The weld repairs must meet the requirements of ASME Code,Section XI, IWA-4411, "Welding, Brazing, Fabrication, and Installation," which require that the welds be performed in accordance with the
construction code. ASME Code,Section III, NB-2570, "Repair of Statically and Centrifugally Cast Products," requires that the internal surface be examined using magnetic particle testing (MT) or PT after machining. ASME Code,Section III, NB-2578, "Elimination of Defects," requires the use of NB-2538, "Elimination of Surface Defects," which requires the use of PT to assure that the defect has been removed or reduced to an acceptable size. ASME Code,Section III, NB-2539.4, Examination of Repair Welds, requires either a PT or MT examination. Additionally, ASME Code,Section III, NB-2539.4 requires an RT on repair welds over 3/8 of an inch or 10 percent of the section thickness. The applicable codes and addenda for LaSalle Unit 2 are the 1971 Edition, Summer through 1972 Addenda for Section III and the 2007 Edition, through 2008 Addenda for Section XI.
The licensee is proposing to use EVT in lieu of PT for the various stages of the repair. EVT is an examination technique that uses remote camera equipment to perform visual inspections of components. EVT has been evaluated by the NRC and industry and is similar in its capabilities to a VT-1 examination as described in ASME Code,Section XI. EVT is not considered to be equivalent to PT, as EVT is more sensitive to issues such as lighting angle, viewing angle, and surface scratches, any of which can hide small cracks. The use of EVT as opposed to PT could result in small cracks being left in the welds.
The licensee is also proposing to not perform the RT examination. Performing the RT of the final repair would detect possible subsurface weld defects such as porosity, lack of fusion, and slag. Not performing the RT examinations increased the probability that such weld defects will remain in the repair.
The weld buildups and final repairs for the A and B Valves will restore more than an inch of material over the required minimum wall thickness. The primary damage mechanism in the repaired area is wear, and the presence of small cracks or weld defects such as porosity and slag would not significantly increase risk of structural failure of the repaired areas. Therefore, the staff concludes that, given the nature of the subject repair, EVT is sufficient to provide reasonable assurance of the structural integrity of the repaired valves.
Furthermore, performing the required PT examinations would result in an additional radiological dose of 5.2 person-REM and performing the required RT would result in an additional radiological dose of approximately 11.8 person-Rem. These doses are significant and the staff finds that they represent a hardship to the licensee consistent with the provisions of 10 CFR 50.55a(z)(2).
Therefore, based on the above, the NRC staff finds that (1) there is reasonable assurance that the licensees proposed alternative has a minimal impact on safety; and (2) the licensees hardship justification is acceptable.
NRC Staff Conclusion read by Nancy Salgado, Branch Chief, Plant Licensing Branch III, Office of Nuclear Reactor Regulation As Chief of the Plant Licensing Branch III, Office of Nuclear Reactor Regulation, I agree with the conclusions of the Piping and Head Penetrations Branch.
The NRC staff concludes that the proposed alternative I4R-12 to use EVT in lieu of PT and to not perform RT at LaSalle Unit 2 will provide reasonable assurance of adequate safety for the subject valve repairs.
The NRC staff finds that complying with the inspection requirements of the ASME Code,Section III and ASME Code,Section XI, as mandated by 10 CFR 50.55a, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes
that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2).
Therefore, effective March 11, 2021, the NRC authorizes the use of the proposed alternative I4R-12 at LaSalle Unit 2 for the current refueling outage L2R18 repairs of Valves 2B33-F060A and 2B33-F060B.
All other requirements in ASME Code,Section XI for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
This verbal authorization does not preclude the NRC staff from asking additional questions and clarifications regarding proposed alternative I4R-12 while preparing the subsequent written safety evaluation.
=========================================================================
Hearing Identifier: NRR_DRMA Email Number: 1093 Mail Envelope Properties (SJ0PR09MB721606F68FDF1F10BA2049398D6C9)
Subject:
LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Relief Request I4R-12, Revision 1 re: Valve Repairs on Valves 2B33-F060A and 2B33-F060B Sent Date: 3/15/2021 3:40:51 PM Received Date: 3/15/2021 3:40:51 PM From: Vaidya, Bhalchandra Created By: Bhalchandra.Vaidya@nrc.gov Recipients:
"Salgado, Nancy" <Nancy.Salgado@nrc.gov>
Tracking Status: None "Mitchell, Matthew" <Matthew.Mitchell@nrc.gov>
Tracking Status: None "Taken, Jason C.:(Exelon Nuclear)" <Jason.Taken@exeloncorp.com>
Tracking Status: None "Kusumawatimurray, Putri:(Exelon Nuclear)" <Putri.Kusumawatimurray@exeloncorp.com>
Tracking Status: None Post Office: SJ0PR09MB7216.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 9518 3/15/2021 3:40:51 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: