Letter Sequence Withholding Request Acceptance |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML16085A301, ML16105A441, ML16168A026, ML16176A316
|
MONTHYEARML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 FWS to NRC, Updated List of Threatened and Endangered Species that May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Supplement 7, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Supplement 7, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Supplement ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16125A4232016-05-19019 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate2016-05-26026 May 2016 Update on Progress of Facility Modifications for MSIV Leak Rate Project stage: Other CNL-16-091, Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendment2016-05-27027 May 2016 Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendments Project stage: Response to RAI CNL-16-094, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information2016-06-0909 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information Project stage: Supplement ML16146A6352016-06-13013 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16161A0642016-06-15015 June 2016 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority and Its Consultant, GEH, Regarding Steam Dryers Structural Adequacy for Browns Ferry Units 1, 2 & 3 Extended Power Uprate (EPU) License Amendment Request (LAR) Project stage: Meeting CNL-16-093, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information2016-06-17017 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information Project stage: Supplement ML16154A5442016-06-21021 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16168A0262016-06-23023 June 2016 Summary Report for the April 19 to 21, 2016 Audit in Support of Replacement Steam Dryer Review Associated to Extended Power Uprate License Amendment Request (CAC Nos. MF6741, MF6742, and MF6743) Project stage: Other CNL-16-105, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information2016-06-24024 June 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information Project stage: Supplement ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16176A3162016-07-11011 July 2016 Summary Report for the May 3 to May 5, 2016 Audit in Support Containment Accident Pressure Associated to Extended Power Uprate License Amendment Request Project stage: Other CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates2016-07-13013 July 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates Project stage: Supplement CNL-16-119, Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers2016-07-13013 July 2016 Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers Project stage: Supplement ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 Project stage: Meeting ML16194A2292016-07-21021 July 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-116, Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 252016-07-27027 July 2016 Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 25 Project stage: Supplement CNL-16-118, Response to Request for Additional Information on Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 272016-07-29029 July 2016 Response to Request for Additional Information on Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 27 Project stage: Supplement 2016-04-07
[Table View] |
|
---|
Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) ML24190A1292024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints ML24185A1512024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24176A1022024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 ML24141A2462024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision ML24115A1652024-04-24024 April 2024 Breaker Trip Automatically Started an Emergency Diesel Generator CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup2024-04-22022 April 2024 Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup ML24087A2302024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24108A1832024-04-17017 April 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24106A2632024-04-16016 April 2024 Ltr to State Recognized Tribes-Hamilton, Cher-O-Creek Intra Tribal Indians ML24106A2572024-04-16016 April 2024 Ltr to Federally Recognized Tribes-Yahola, Kialegee Tribal Town 2024-09-03
[Table view] Category:Proprietary Information Review
MONTHYEARML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML23045A1192023-02-15015 February 2023 Proprietary Determination Letter Enclosure - Browns Ferry Atrium 11 LAR Supp. 6 ML23009B7502023-02-15015 February 2023 Request for Withholding Information from Public Disclosure for Supplement 6 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML23010A0932023-02-13013 February 2023 Request for Withholding Information from Public Disclosure for Supplement 7 to Browns Ferry License Amendment Request Transition to Atrium 11 Fuel ML22297A2352023-01-10010 January 2023 Request for Withholding Information from Public Disclosure Regarding Use of Atrium 11 Fuel ML22276A1012022-10-25025 October 2022 Request for Withholding Information from Public Disclosure for Supplement 4 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22276A1002022-10-0404 October 2022 Request for Withholding Information from Public Disclosure for Supplement 3 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22157A3272022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22154A1292022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22125A2632022-06-0101 June 2022 Request for Withholding Information from Public Disclosure for Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure ML19008A1752019-01-15015 January 2019 Request for Withholding Information from Public Disclosure ML16305A2142016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC Nos. MF6741, MF6742, MF6743) ML16292A7222016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16270A3662016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - EPU LAR GE-Hitachi Proprietary Approval Letter (CAC Nos. MF6741, MF6742, and MF6743) ML16224A1202016-09-26026 September 2016 Browns Ferry Nuclear Plant Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC. Nos. MF6741, MF6742, And MF6743) ML16209A3992016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16211A4352016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16217A4432016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16144A2982016-07-0707 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741 and MF6742, and MF6743) ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure ML16124B0062016-05-19019 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16123A3352016-05-16016 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16124B1062016-05-12012 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16120A0722016-05-12012 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure ML16027A1612016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML16027A2312016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML15345A0102015-12-22022 December 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15289A5392015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15289A5822015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Plant, Unit 3 ML15281A1682015-11-0505 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15170A3162015-09-0404 September 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15044A4802015-03-16016 March 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15006A3602015-01-26026 January 2015 Request for Withholding of Proprietary Information from Public Disclosure ML14352A2872015-01-0808 January 2015 Request for Withholding Information from Public Disclosure Regarding Tennessee Valley Authority Compensatory Measures That Revise the Pressure and Temperature Limits Curves ML14099A1032014-04-30030 April 2014 Request for Withholding Information from Public Disclosure for Tennessee Valley Authority Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Technical Specifications 2.1.1.2 in Support. ML14099A0842014-04-30030 April 2014 Request for Withholding Information from Public Disclosure for Response to Request for Additional Information on Technical Specification Change TS-478 2024-06-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801 July 7, 2016
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NOS. MF6741, MF6742, AND MF6743)
Dear Mr. Shea:
By letter to the U.S. Nuclear Regulatory Commission (NRC), dated December 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15351A113), Tennessee Valley Authority submitted an affidavit dated December 4, 2015, executed by Mr. Morris Byram, Manager, AREVA, Inc. (AREVA), requesting that the information contained in the following proprietary document (Enclosure 5 of the letter dated December 15, 2015) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: FS1-0024827, Revision 1.0, "MICROBURN-82 Low Flow Issues Impact," (Proprietary)
December 2015 A non proprietary copy of document FS 1-0024828, Revision 1.0, (Enclosure 6 of the letter dated December 15, 2015) "MICROBURN-B2 Low Flow Issues Impact," December 2015, has been placed in the NRC's Public Document Room and added to the NRC Library in ADAMS under Accession No. ML 15351A113.
The AREVA affidavit dated December 3, 2015, stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (c) The Information includes test data or analytical techniques concerning a process, methodology, or component, the appliocation of which results in a competitive advantage for AREVA. (d) The Information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
We have reviewed your application and the material in accordance with the requirements of 1 O CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
J.Shea Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296 cc: Mr. Morris Byram Manager, Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional Distribution via Listserv Sincerely, *j-IY Farideh E. Saba, Senior Project Manager Plant Licensing 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation J. Shea Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov.
Sincerely, IRA SLingam for! Farideh E. Saba, Senior Project Manager Plant Licensing 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296 cc: Mr. Morris Byram Manager, Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsACRS_MailCTR Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML 16125A084 OFFICE NRR/DORL/LPLIV-1/PM NAME SLingam DATE 6/28/2016 OFFICE NRR/DSS/SNPB/BC NAME JDean DATE 7/07/2016 RidsNrrDorllpl2-2 Resource RidsNrrPMBrownsFerry Resource KWood, NRR RidsNrrDssSnpb Resource N RR/DORL/LP LI 1-2/PM NRR/DORL/LPLll-2/LA FSaba (PB/echman for) BClayton 6/28/2016 6/28/2016 NRR/DORL/LPLll-2/BC(A)
NRR/DORL/LPLll-2/PM TOrf ( SLingam for) FSaba 7/07/2016 7/07/2016 OFFICIAL RECORD COPY