Similar Documents at Surry |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating ML18153B0061994-07-14014 July 1994 Proposed Tech Specs Changes Will Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18152A1821994-06-0909 June 1994 Proposed TS Re Chemical & Vol Control Sys & Safety Injection Sys ML20065P6111994-04-19019 April 1994 Proposed Tech Specs,Modifying Control Rod Movement Surveillance Frequency ML18153A8821994-02-25025 February 1994 Proposed Tech Specs Modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys ML18153B4321993-12-27027 December 1993 Proposed Tech Specs Reflecting Revised Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B4081993-12-10010 December 1993 Proposed Tech Specs,Establishing Upper Limit on Allowable COLR Mtc Values ML18153B4021993-12-10010 December 1993 Proposed Tech Specs,Modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 & NUREG-1431 ML18153B4051993-12-10010 December 1993 Proposed Tech Specs,Updating Augmented Insp Program for Sensitized Stainless Steel by Incorporating Newer Code Requirements,While Maintaining Augmented Insp Philosophy ML18153B3751993-11-15015 November 1993 Proposed Tech Specs Implementing Revised 10CFR20,revising Frequency Radiological Release Repts from Semiannual to Annual & Clarifying Site Maps ML18153B3501993-10-19019 October 1993 Proposed Tech Specs for RSHX Svc Water Outlet Radiation Monitors ML18153B3321993-09-29029 September 1993 Proposed Tech Specs Modifying Required Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Be Performed Concurrent W/Disk & Hub Insp ML18152A0481993-07-20020 July 1993 Proposed Tech Specs Deleting Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3921993-07-16016 July 1993 Proposed Tech Specs for Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18152A0461993-07-16016 July 1993 Proposed Tech Specs Implementing Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from semi-annual to Annual,& Clarify Site Maps ML18152A4511993-07-0202 July 1993 Proposed Tech Specs to Include COLR Which Presents reload- Specific Limits for Key Core Operating Parameters ML18153D3811993-07-0202 July 1993 Proposed TS Table 4.2-1 Re Miscellaneous Insps & Sensitized Stainless Steel Exams ML18153D3331993-05-0606 May 1993 Proposed Tech Specs Supporting Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12 1999-08-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06
[Table view] |
Text
ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION UNIT NOS. 1 AND 2 e TS 6.1-7 f. Responsibilities The SNSOC shall be responsible for: 1. Review of 1) all proposed normal, abnormal,**
and emergency operating procedures and all proposed maintenance cedures and changes thereto, 2) any other proposed procedures or* changes thereto as determined by.the Station Manager which affect nuclear safety. 2. Review of all proposed test and experiment procedures and results thereof when applicable.
- 3. Review,of proposed changes to Technical Specifications.
- 4. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety. 5. Investigation of all violations of the Technical Specifi--cations including the preparation and forwarding of reports covering evaluation and recommendations to prevent currence to the Vice*President-Nuclear Operations and Maintenance and to the Director-Safety Evaluation and Control. 6. Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
- 7. Review of facility operations to detect potential nuclear safety hazards. 8. Performance of special reviews, investigations or analyses and report thereon as requested by the Chairman of the Station Nuclear Safety and Operating )Committee.
TS 6.1-8 9. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Station Nuclear Safety and Operating Committee.
- 10. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Station Nuclear Safety and Operating Committee.
- g. Authority The SNSOC shall: 1. Recommend to the Station Manager written approval or approval of items considered under (1) through (4) above. 2. Render determinations in writing with regard to whether or not each item considered under (1) through (5) above constitutes an unreviewed safety question.
- 3. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President-Nuclear
~perations and the Director-Safety Evaluation and Control of disagreement between SNSOC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such disagreements pursuant to 6.1-A above. h. Records The SNSOC shall maintain written minutes of each meeting and copies shall be provided to the Vice President-Nuclear Operations and to the Director-Safety Evaluation and Control.
I e e TS 6.1-15 c, Records I Records of the Quality Assurancl;!
Department audit's shall be prepared and maintained in the department files. Audit reports shall be disseminated as indicated below: 1. Nuclear Power Station Manager 2. Vice President-Nuclear Operations
- 3. Manager-Nuclear Technical Services 4. Manager-Quality Assurance, Operations
- 5. Director-Quality Assurance, Nuclear Operations
- 6. Director -Safety Evaluation and Control 7. Supervisor of area audited 8. Nuclear Power Station Resident Quality Control Engineer EXECUTIVE MANAGER QUALfrY ASSURANCE MANAGER QUALITY ASSURANCE OPERATIONS DIRP.CTOR QUAl,rrY ASSURANCE NUCLP.AR OPP.RATIONS NUCl,EAR STATION MANAGERS I DIRP.CTOR TRAINING *RF.SPONSIBLI!
POR CORPORATE PIKE PROTECTION PROGRAM EXP.CUTIVE VJCF. PR1'511lF.NT row1m SENIOR VICF. PU~~IDF.NT POWP.R OPP.RATIONS I VICP. PRF.Sll>P.NT NUCLP.AR OPP.RATIONS*
MANAGP.R NUCLP.AR OPP.RATIONS&:
MAINT. I DIRECToR OPERATION AND MAINTF.NANCP.
SUPPORT OIRP.CTOR ADMINISTRATIVE SP.RVJCES I DIRECTOR SAPF.TY P.VALUATION AND CONTROL I I L MANAGP.R NUCLP.AR TECHNICAL SP.RVICES DIRECTOR TECHNICAL ANAi, YSIS AND CONTROL l!NGINP.l!RING SUPP.RVISOR (SAPP.TY ENGINl!P.RING)
Offsite Organization for Facility Management and Technical Support. I DIRP.CTOH CIIHMISTHY AND IIP.ALTII PHYSICS e en >rj I-'* OQ ...... I ......
YICB Plll!IIID!IIT NUCLIIAII OPBRA110Nll lrl'ATIOII IIUCLl!Aa STA11011 MANAOIIII IAPlll'T
---I COllrrnlll 11un11111T111101111T OPIIIIA110NII Ill. IUPUVIIOa IIUPUVIIOa IIHIPT IIIJCIJIAa ftAIIIIIIO RIAL TH PHTIIICll IIUPIIIIVIIOII
! Ill. AmlSTAIITIIHln IIUPl!RVIIIOR IIL . CONTllOL 110011 OPERATOR OL . CONTllOL 110011 OPl!RATOR TRAINIII!
SURRY POWER STATION ORGANIZATION CHART fflRECTOa.
QUALITY AlllUllANCII NUCLIAH OPHHA110NII 1-------IIIIIIIDBIIT QUALffY COIITIIOL BNOINBIIII I AIIIISTAIIT lrl'A110N IIANAOIIII I I IIUPIIIUlffl!NDBIIT IIAIIITIINANCB IIUPIIHIIIOa IIHCHANICAL
-IIAINTIINAIICII IILl!CTIUCAL
-IIUPl!RVIIOa
- I IIUPIIIIIIITIINDIIIIT Tl!CHNICAL IIBRYICIIII IIUPl!llVIIOa CHIDlllll'l'llT
-IIIIITllUlll!lrr BUPIIRVIIIOa
-IIJIOIIIIIIIIIINO I-IIUPIIIIVIIIOU BNOllll!IIRINO SUPIIIIVlllOR
-(IIAPtn'T BNOINlllllllNO)
Ll!Ol!ND IIL -lll!Ntoa l.tCIIIIIIII OL -OPIIRATOa'II LICIINIIII
--COIIIIUNICAffONII IIUPDVIIOa ADMIIIISTllA'IIYm lll!llVICBII nu IIAUHALL -STATION IIIICuarrT IIUPU'90a
-' I -e en ,_. I N
- ~ e TS 6.2-1 6.2 ACTION TO BE TAKEN IN THE EVENT OF A REPORTABLE OCCURRENCE IN STATION OPERATION Specification A. The following actions shall be taken for reportable occurrences:
- 1. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.6. 2. Each reportable occurrence requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by the SNSOC/and submitted to the Director-Safety Evaluation and Control and the Vice Nuclear Operations.
e e -TS 6.3-1 6. 3 ACTION TO BE. TAK.EN'* IF A SAFETY LIMIT IS EXCEEDED Specification A. The following actions shall be taken in the event a Safety Limit is violated:
- 1. The facility shall be placed in at least hot shutdown within one hour. 2 *. The Safety Limit violation shall be reported to the Commission, 3. I the Vice President-Nuclear Operations,*and the Director-Safety Evaluation and Control within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the SNSOC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
- 4. The Safety Limit Violation Report shall be submitted to the Commission, the Director-Safety Evaluation and Control, and the Vice Nuclear Operations and Maintenance within 14 days of the violation.
e e TS 6.6-5 month covered by the report. 2. Reportable Occurrences Reportable occurrences, including corrective actions and measures to prevent recurrence, shall be reported to the NRC. Supplemental reports may be required to fully describe final resolution of occurrence.
In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be made to the original report date. a. Prompt Notification With Written Followup.
The types of events listed below shall be reported as expeditiously as possible, but within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone and confirmed by telegraph, mailgram, or facsimile transmission to the Regional Administrator of the appropriate Regional Office, or his designee no later than the first working day following the event, with a written followup report within two weeks. The written followup report shall include, as a minimum, a completed copy of a licensee event report form. Information pr~vided on the licensee event report form shall be supplemented, as needed, by additional narrative material to provide _complete explanation of the circumstances surrounding the event.
ATTACHMENT 2 DISCUSSION OF PROPOSED TECHNICAL SPECIFICATION CHANGES The proposed changes to the Technical Specifications reflect the t'ion and transfer of responsibilities within the Nuclear Operations Department from the Manager-Nuclear Operations and Maintenance to the Vice Nuclear Operations.
The proposed changes are discussed below. At present, the corporate organizational structure specified in the Technical Specifications indicates that the Nuclear Station Manager reports to the Manager-Nuclear Operations and Maintenance, who in turn reports to the Vice President-Nuclear Operations.
As a result of the proposed revisions, the Vice President-Nuclear Operations will have responsibility for the supervision of the Nuclear Station Managers in the operation and maintenance of the Company's operational nuclear units. TheVice President-Nuclear Operations will also be responsible for coordinating the technical services activities and the operational maintenance activities of the nuclear units. The transfer of the supervision responsibilities to the Vice President-Nuclear Operations will provide continued assurance of adequate managerial involvement in the . operational and maintenance activities of the nuclear units and will enhance managerial attention of safety activities for the units. The Manager-Nuclear Operations and Maintenance has responsibility for supervising the operational and maintenance activities of the Company's operational nuclear units. This responsiblity includes coordinating and directing all nuclear power plant operations and maintenance planning and scheduling, insuring qualified station staffing is in place at all times, providing the necessary information to and communications within the Company regarding nuclear unit operations, and providing input to and review of new nuclear unit design and existing plant modifications.
In order to implement the proposed corporate and station organizational revisions into the Surry Technical Specifications, several modifications to .the Administrative Controls (Section 6.0) are required.
Specifically the previous Technical Specification references to the Manager-Nuclear Operations and Maintenance should be revised to reference the Vice President-Nuclear Operations.
In addition, the corporate and station organizations depicted in Figures 6 .1-1 and 6 .1-2 have been revised to reflect the proposed tional relationship of the Station Manager, the Manager-Nuclear Operations and Maintenance, and the Vice President-Nuclear Operations.
A tabulation of the revised pages for the Surry Technical Specifications is provided in the enclosed Appendix A. ***--** *-*. ********l'*'"'";--:***-
APPENDIX A TABULATION OF PAGES PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY UNITS NO. 1 AND NO. 2 DELETE ADD 6.1-7 6.1-7 6.1-8 6.1-8 6 .1-15 6.1-15 TS Figure 6.1-1 TS Figure 6.1-1 TS Figure 6.1-2 TS Figure 6.1-2 6.2-1 6.2-1 6.3-1 6.3-1 6.6-5 6.6-5