11/28/03 - Ltr to F. Oshinowo, Edlow, Frm J. Shea, Nsir/Dns, Approval of Highway Route to Transport Spent Nuclear Fuel from Athens, AL, to Pleasonton, CA (NRC Route No. 209)ML033320093 |
Person / Time |
---|
Site: |
Browns Ferry, Zion, 07001252 ![Tennessee Valley Authority icon.png](/w/images/c/ce/Tennessee_Valley_Authority_icon.png) |
---|
Issue date: |
11/28/2003 |
---|
From: |
Shea J W NRC/NSIR/DNS |
---|
To: |
Oshinowo F Edlow International Co |
---|
Bennington G NSIR/DNS 301-415-8183 |
Shared Package |
---|
ML033320079 |
List: |
---|
References |
---|
+kBR1SISP20060113, -RFPFR, 07001252920R |
Download: ML033320093 (5) |
|
|
---|
Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23356A0072023-12-22022 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-592023-11-29029 November 2023 Amendment No. 15 to Indemnity Agreement No. B-59 CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23291A0802023-11-16016 November 2023 Issuance of Conforming Amendments Regarding Direct Transfer of DPR-39 and DPR-48 Facility Operating Licenses from Zionsolutions, LLC to Constellation Energy Generation LLC ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23286A3132023-11-14014 November 2023 EPA Phase 2 Closure Letter 10-13-23 IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 ML23310A3132023-11-0808 November 2023 Cover Letter, S.Anderson, NRC to J.Sauger, Energysolutions, Remaining Final Status Surveys RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments2023-11-0808 November 2023 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments ML23286A3092023-11-0808 November 2023 Partial Site Release, Zion Nuclear Power Station, Units 1 and 2 ML23310A1082023-11-0303 November 2023 Confirmatory Survey Report 2023 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter IR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A0712023-09-0808 September 2023 Confirmatory Survey Extent of Condition Review ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23237B4132023-08-25025 August 2023 Response to Summary of May 4, 2023, Clarification Meeting Regarding the Partial Site Release Request 2024-02-01
[Table view] |
Text
SAFEGUARDS INFORMATIONSAFEGUARDS INFORMATIONNovember 28, 2003Mrs. Franchone OshinowoVice President, Spent Fuel Program Edlow International Company 1666 Connecticut Ave., N.W., Suite 201 Washington, D.C. 20009
SUBJECT:
APPROVAL OF HIGHWAY ROUTE TO TRANSPORT SPENT NUCLEAR FUELFROM ATHENS, AL, TO PLEASANTON, CA (NRC ROUTE NO. 209)
Dear Mrs. Oshinowo:
On behalf of the U. S. Nuclear Regulatory Commission (NRC), I am responding to yoursubmittal of July 17, 2003, which requested the NRC approve a route for transporting spent nuclear fuel (SNF) from Browns Ferry Nuclear Plant, Athens, AL, to GE Vallecitos Nuclear Center, Pleasanton, CA (NRC Route No. 209). The NRC has reviewed Edlow International Company's submittal and concluded that theinformation satisfies the requirements of 10 CFR 73.37. Specific details of Route No. 209 are enclosed [Enclosure 1]. Specific details of Route No. 209 combined with additional Safeguards Information (SGI) are also enclosed [Enclosure 2]. Enclosure 2 will not be released to the public and you should protect it in accordance with the requirements of 10 CFR 73.21.
Approval of Route No. 209 will expire two years from the date of this letter. The NRC issued additional security measures for the transportation of SNF for NRC licenseeswho ship greater than 100 grams of SNF. Licensees are required to comply with the requirements of 10 CFR 73.37 and these measures when shipping SNF. Licensees are also required to comply with the U.S. Departments of Transportation and Homeland Security regulations on the shipment of hazardous materials.In addition, the NRC also issued Regulatory Issue Summary (RIS) 2002-12I, Rev. 1, onOctober 3, 2002, "Transportation of Spent Nuclear Fuel Greater than 100 Grams - NRC Threat Advisory and Protective Measures System." The RIS advised licensees shipping SNF to consider various recommendations to be taken in conjunction with changes to the national or transportation-sector threat levels.WARNING: Violation of Section 147 of the Atomic Energy Act, "Safeguards Information" is subject to Civil and Criminal PenaltiesWhen separated from Enclosure 2 this document is DECONTROLLED SAFEGUARDS INFORMATIONF. Oshinowo- 2 -SAFEGUARDS INFORMATIONIf you are requested by State officials to deviate from a portion of the approved route (due tohighway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail atGMB@nrc.sgov.gov
.Sincerely,/RA/Joseph W. Shea, Project DirectorNuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident ResponseDocket No. 70-1252
Enclosures:
(Note: Enclosure 2 contains Safeguards Information)1. Route No. 209 - Mileage Summary
- 2. Route No. 209 - Detailed Highway Route Plan (U)
SAFEGUARDS INFORMATIONF. Oshinowo- 2 -SAFEGUARDS INFORMATIONIf you are requested by State officials to deviate from a portion of the approved route (due tohighway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail atGMB@nrc.sgov.gov
.Sincerely,/RA/Joseph W. Shea, Project DirectorNuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident ResponseDocket No. 70-1252
Enclosures:
(Note: Enclosure 2 contains Safeguards Information)1. Route No. 209 - Mileage Summary
- 2. Route No. 209 - Detailed Highway Route Plan (U)DISTRIBUTION: (07001252920R) (TAC # D91386)w/enclosures 1 and 2:
DOCKETCase File 70-1252 OSmith, R-IIMShannon, R-IVw/o Enclosure 2RidsOgcRidsNsirDnsMtwsRidsNsirDNSRidsNsirPmda1 NJensen, OGCEPoteat, OCIOKJabbour, NRRADAMS Package Accession # ML033320079ADAMS Document Accession # ML033320093 is SGI and is not entered into ADAMS g:dns staff\bennington\edlowltr.209.wpd* see previous concurrenceOFCMTWSEMTWSnMTWSnNSP-PDNAMEGBennington/gb *PBrochman *MLayton *JSheaDATE 11/26/03 11/28/03 11/28/03 11/28 /03 OFFICIAL RECORD COPYC = COVERE = COVER & ENCLOSUREN = NO COPY Mailing Labels M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009