ML17292A969

From kanterella
Revision as of 15:51, 18 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days
ML17292A969
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/12/1997
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17292A968 List:
References
NUDOCS 9708210068
Download: ML17292A969 (2)


Text

il)~pic t Programs and Hanuals 5.5 5.5 Programs.-and Hanuals (continued)

5.5.6 Inservice

Testin Pro ram This program provides controls for inservice testing of ASHE Code Class I, 2, and 3 pumps and valves.4 Pm~C&Cg&CG a~Testing Frequencies specified in Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as follows: ASHE Boil errand Pressure Vessel Code and applicable Addenda terminology for inservice testing activities Required Frequencies for performing

'inservice testin activities Weekly Honthly quarterly or every'months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days b.The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing'activities; c.The provisions of SR 3.0.3 are applicable to inservice testing activities';

and d.Nothing in the ASHE Boiler'nd Pressure Vessel Code shall be construed to supersede the requirements of any TS.5.5.7 Ventilation Filter Testin Pro ram VFTP The VFTP shall establish the required testing of Engineered Safety Feature (ESF)filter ventilation systems.Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months;after each complete or partial replacement of the HEPA filter train or charcoal adsorber filter;continued 4 TIP'-g-(is ese~pbd Qow+4.X'Sl Progr~reg~revne<t.

Qr Wll~K exercise+sh'ng cE+ead mq I'otage,, pI s eae~phon.sha'lI ScpIre-ufo~co~m~c'<~cKt o6+4c, I99S Cinngai rAaei;n o~+a~e.or NIaq IS, I998.M4c4ver occurs ter~+.WNP-2 5.b-ll'mendment No.149+7082%0068

~0003q7Q pDR gDQCK 0@ORE P cuewC*

~I~