Acceptance for Review of Electric Power Research Institute Motor-operated Valve Performance Prediction Methodology Software (TAC No. MD3236)
ML063120335
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 11/14/2006
From: Rosenberg S L
NRC/NRR/ADRA/DPR/PSPB
To: Riley J H
Nuclear Energy Institute
Mensah T
References
TAC MD3236
Download: ML063120335 (3)


Text

November 14, 2006Mr. James H. Riley, DirectorEngineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF "ELECTRIC POWER RESEARCHINSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE" (TAC NO. MD3236)

Dear Mr. Riley:

By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the NuclearEnergy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 "Motor-Operated Valve Performance Prediction Methodology Software." The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.In accordance with the letter dated September 2, 2004 (Agencywide Documents Access andManagement System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TRreview.Sincerely,/RA/Stacey L. Rosenberg, ChiefSpecial Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationProject Nos. 669 and 689 cc: See next page November 14, 2006Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF "ELECTRIC POWER RESEARCHINSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE" (TAC NO. MD3236)

Dear Mr. Riley:

By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the NuclearEnergy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 "Motor-Operated Valve Performance Prediction Methodology Software." The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.In accordance with the letter dated September 2, 2004 (Agencywide Documents Access andManagement System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TRreview.Sincerely,/RA/Stacey L. Rosenberg, ChiefSpecial Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationProject Nos. 669 and 689 cc: See next pageDISTRIBUTION

PUBLICPSPB Reading File TScarborough RidsNrrDprRidsNrrDprPspbRidsNrrDciCptb RidsNrrLADBaxleyRidsAcrsAcnwMailCenter RidsNrrPMTMensahRidsOgcMailCenterRidsNrrDciCfebRidsNrrDciCpnbADAMS ACCESSION NO.: ML063120335 NRR-106OFFICEPSPB/PMPSPB/LAPSPB/BCNAMETMensahDBaxleySRosenberg DATE11/14/0611/13/0611/14/06OFFICIAL RECORD COPY Nuclear Energy InstituteProject No. 689Electric Power Research InstituteProject No. 669 cc:Mr. Anthony Pietrangelo, Senior DirectorRisk Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Mr. H. A. Sepp, ManagerRegulatory and Licensing Engineering Westinghouse Electric Company P. O. Box 355 Pittsburgh, PA 15230-0355Mr. Jack RoeNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852Mr. Gary L. Vine, Executive Director EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036-4907Mr. Pedro Salas Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005Mr. Gary WelshInstitute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957Mr. David J. ModeenVice President and Chief Nuclear Officer

EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550