Letter Sequence Approval |
---|
|
|
MONTHYEARML0631203352006-11-14014 November 2006 Acceptance for Review of Electric Power Research Institute Motor-operated Valve Performance Prediction Methodology Software Project stage: Acceptance Review ML0710703702007-04-23023 April 2007 Request for Additional Information (RAI) Regarding Topical Report (TR) -103237, Electric Power Research Institute Motor-Operated Valve Performance Prediction Methodology Software Project stage: RAI ML0811301332008-06-0303 June 2008 Request for Additional Information Nuclear Energy Institute (NEI) Topical Report (TR) - 103237, EPRI (EPRI Power Research Institute) MOV (Motor-operated Valve) Performance Prediction Program - Topical Report Project stage: RAI ML0834300642009-01-14014 January 2009 to Draft Safety Evaluation for Nuclear Energy Institute Addenda 3,4,5,6 & 7 to Electric Power Research Institute Topical Report 103237, EPRI Mov (Motor-Operated Valve) Performance Prediction Program, Rev. 2 Project stage: Draft Approval ML0904006212009-02-24024 February 2009 to Final Safety Evaluation for Nuclear Energy Institute (NEI) Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute (EPRI) Topical Report (TR) 103237, EPRI Mov (Motor-Operated Valve) Performance Prediction Program, Rev. 2. Project stage: Approval ML0904006102009-02-24024 February 2009 to Final Safety Evaluation for Nuclear Energy Institute (NEI) Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute (EPRI) Topical Report (TR) 103237, EPRI Mov (Motor-Operated Valve) Performance Prediction Program, Revision 2. Project stage: Approval 2008-06-03
[Table View] |
to Final Safety Evaluation for Nuclear Energy Institute (NEI) Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute (EPRI) Topical Report (TR) 103237, EPRI Mov (Motor-Operated Valve) Performance Prediction Program, Revision 2.ML090400610 |
Person / Time |
---|
Site: |
Nuclear Energy Institute |
---|
Issue date: |
02/24/2009 |
---|
From: |
Bone S Division of Policy and Rulemaking |
---|
To: |
Jeffrey Riley Nuclear Energy Institute |
---|
Tanya Mensah, NRR/DPR, 415-3610 |
Shared Package |
---|
ML090430444 |
List: |
---|
References |
---|
TAC MD3236, TR-103237, Rev 1 |
Download: ML090400610 (4) |
|
|
---|
Category:Letter
MONTHYEARML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations ML22195A1662022-07-14014 July 2022 NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML22195A0202022-07-13013 July 2022 07-13-22 NRC Fee Exemption Request for NEI 21-05 Review ML22195A0672022-07-13013 July 2022 Fee Exemption Request for Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 21-05, Reporting Guidance for Licensees with Risk-Informed Licensing Bases ML22159A2772022-06-28028 June 2022 Response Letter to Richard Mogavero for Fee Exemption for the Nuclear Regulatory Commission Review Ad Endorsement of NEI 15-09, Revision 1 ML22153A2782022-06-0202 June 2022 Nie, Fee Exemption Request for Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated May 2022 ML22154A2962022-06-0202 June 2022 LTR from R. Mogavero to M. Sampson Dated Jun 2 2022 Endorsement of NEI 15-09 Cyber Security Event Notifications Rev 1 Dated May 2022 ML22152A2712022-06-0101 June 2022 Digital Instrumentation and Control Common Cause Failure Policy Considerations, Revision 1 ML22143A9362022-05-20020 May 2022 May 13, 2022, Public Meeting on Draft Regulatory Issue Summary Operational Leakage, 87 Fed. Reg. 2361 (Jan. 14, 2022) (Docket Id NRC-2021-0173) ML22110A1752022-05-0303 May 2022 NRC Response to the Nuclear Energy Institute April 1, 2022, Letter, Regarding the Nrc'S CUI Implementation Plan ML22109A2082022-04-0808 April 2022 April 8, 2022, NEI White Paper on Digital Instrumentation and Control Common Cause Policy Considerations Version 2.0 ML22110A1782022-04-0101 April 2022 April 1, 2022, Letter from NEI Regarding Nrc'S Controlled Unclassified Information Program Implementation ML22048A5812022-02-16016 February 2022 NEI 22-02: Guidelines for Weather-Related Administrative Controls for Short Duration Outdoor Dry Cask Storage Operations ML22019A2922022-01-12012 January 2022 NEI, Submittal of Proposed Revisions to Aging Management Programs XI.M33, Selective Leaching and XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements ML21343A2922021-12-0808 December 2021 NEI, Transmittal of NEI 21-07 Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactor Safety Analysis Report: for Applicants Utilizing NEI 18-04 Methodology ML21337A3802021-12-0303 December 2021 NEI Technical Report NEI 17-06 - Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications, Revision 1 ML21319A3522021-11-10010 November 2021 NRC NEI Fee Waiver Request Changes to NEI 10-04 and NEI 13-10, Dated November 10, 2021 ML21306A3652021-10-29029 October 2021 NEI Letter from D. Young to NRC S. Atack to Cease Work on Draft D of NEI 20-05, Methodological Approach and Considerations for a Technical Analysis to Demonstrate Compliance with the Eligibility Criteria of 10 CFR 73.55(a)(7) ML21342A1682021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 10-04, Identifying Systems and Assets Subject to the Cyber Security Rule, Revision 3, Dated October 29, 2021 ML21342A2032021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 13-10, Cyber Security Control Assessments, Revision 7, Dated October 29, 2021 ML22081A2002021-10-29029 October 2021 NEI Backfitting Concerns with NRCs Developing Position on Protection of Dry Storage Systems from Natural Phenomena During Short Term Operations 2024-01-22
[Table view] |
Text
February 24, 2009 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
SUPPLEMENT 4 TO FINAL SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE (NEI) ADDENDA 3, 4, 5, 6, AND 7 TO ELECTRIC POWER RESEARCH INSTITUTE (EPRI) TOPICAL REPORT (TR) 103237, EPRI MOV
[MOTOR-OPERATED VALVE] PERFORMANCE PREDICTION PROGRAM, REVISION 2 (TAC NO. MD3236)
Dear Mr. Riley:
In February 1994, the NEI submitted for U.S. Nuclear Regulatory Commission (NRC) review EPRI TR-103237, Revision 0. In November 1995, the NEI submitted for NRC review EPRI TR-103237, Revision 1. On March 15, 1996, the NRC staff issued a safety evaluation (SE) documenting the NRC staff's acceptance of the EPRI MOV Performance Prediction Methodology (PPM) described in the subject TR, with certain conditions and limitations. The SE addressed the EPRI computer model for globe and butterfly valves and various gate valves, and EPRI hand-calculation models for Anchor/Darling double disk gate valves and Westinghouse Electric Company flexible wedge gate valves. On February 20, 1997, the NRC staff issued Supplement 1 to the SE dated March 15, 1996. This supplemental SE discussed two additional gate valve (WKM parallel expanding and Aloyco split wedge) hand-calculation methods and highlighted other aspects of the TR.
On September 8, 1999, the NEI submitted for NRC review Addendum 1, PPM Version 2.0, and Addendum 2, Thrust Uncertainty Method, to EPRI TR-103237, Revision 2. Version 2.0 of the EPRI MOV PPM described in Addendum 1 to the TR resolves several previous modeling errors and incorporates other improvements to the modeling software. In Addendum 2 to TR-103237, Revision 2, the EPRI describes the development of its Thrust Uncertainty Method that takes into account conservatism in the EPRI MOV PPM to predict a more realistic thrust requirement for closing gate valves. On April 20, 2001, the NRC staff issued Supplement 2 to the SE dated March 15, 1996, concluding that the changes made to the PPM in Addendum 1 to TR-103237, Revision 2, improve the ability of the EPRI model to predict the applicable thrust or torque required to operate gate, globe, and butterfly valves.
On January 5 and December 6, 2001, and June 10, 2002, the NEI submitted for NRC review revisions to Addendum 2 to EPRI TR-103237, Revision 2. These revisions involved the establishment of additional criteria for application of the Thrust Uncertainty Method for gate valves under cold water applications within the scope of the Thrust Uncertainty Method.
J. Riley On September 30, 2002, the NRC staff issued Supplement 3 to the SE dated March 15, 1996, concluding that the Thrust Uncertainty Method developed by the EPRI is acceptable for the prediction of minimum allowable thrust at control switch trip (or flow isolation) for applicable gate valves under cold water applications within the scope of the Thrust Uncertainty Method subject to the applicable limitations and conditions specified in the Thrust Uncertainty Method.
On June 8, 2004, the NEI submitted Addendum 5, PPM Version 3.1 Software Changes, Addendum 6, PPM Version 3.2 Software Changes, and recent PPM error and information notices to TR-103237, Revision 2, for NRC review. Addendum 5 provided PPM Software Version 3.1; updated the PPM to a Window-based application; automated certain manual calculations; adjusted the software to allow more ready use for air-operated valve (AOV) and hydraulic-operated valve (HOV) applications; and incorporated software and documentation improvements. Addendum 6 provided PPM Software Version 3.2; corrected potential non-conservative effects from upstream disturbances; and prevented incorrect use of best estimate butterfly valve torque predictions.
On January 6, 2006, the NEI submitted Addendum 3, An Improved and Validated Method for Predicting Gate Valve Unwedging Thrust Requirements, Addendum 4, Use of Static Closure Data for Determining Stem Stem-Nut Coefficients of Friction at Unwedging, and Addendum 7, PPM Version 3.3 Software Changes, to TR-103237, Revision 2, for NRC review. Addenda 3, 4, and 7 document changes made to the EPRI PPM computer code between Versions 3.2 and 3.3, and also provide improved methods for evaluating gate valve undwedging thrust requirements.
On April 23, 2007, and June 3, 2008, the NRC staff requested that the NEI submit additional information to support its request. The NEI submitted the requested information in letters dated September 27, 2007, and August 7, 2008. By letter dated January 14, 2009, an NRC draft SE for the TR, Supplement 4 to Safety Evaluation Dated March 15, 1996: Addenda 3, 4, 5, 6, and 7 to EPRI TR-103237, Revision 2, was provided for your review and comments. In an email dated January 30, 2009, from Mike Melton, Senior Project Manager, NEI, to Tanya Mensah, Senior Project Manager, NRC, the NEI commented on the draft SE. The NRC staffs disposition of NEIs comments on the draft SE are discussed in the Attachment to the final SE enclosed with this letter.
The NRC staff has found that Addenda 3, 4, 5, 6, and 7 to EPRI TR-103237, Revision 2, is acceptable for referencing in licensing applications as discussed in the enclosed final SE. The final SE defines the basis for our acceptance of the TR.
Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
In accordance with the guidance provided on the NRC website, we request that NEI publish accepted proprietary and non-proprietary versions of this TR within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed final SE after the title page. Also, they must contain historical review information, including NRC requests for
J. Riley additional information and your responses. The accepted versions shall include an "-A" (designating accepted) following the TR identification symbol. If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely,
/RA/
Sheri L. Bone, Acting Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
Final SE cc w/encl: See next page
J. Riley February 24, 2009 additional information and your responses. The accepted versions shall include an "-A" (designating accepted) following the TR identification symbol. If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely,
/RA/
Sheri L. Bone, Acting Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
Final SE cc w/encl: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDci RidsNrrDciCptb SRosenberg (Hardcopy)
ADAMS ACCESSION NOS.
Package: ML090430444 Letter: ML090400610 Final SE: ML090400621 *No major changes to SE input. NRR-043 OFFICE PSPB/PM PSPB/LA DCI/CPTB* PSPB/BC DPR/DD (A)
NAME TMensah DBaxley JMcHale SRosenberg SBone DATE 2/19/09 2/19/09 10/30/08 2/23/09 2/24/09 OFFICIAL RECORD COPY
Nuclear Energy Institute Project No. 689 cc:
Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Acting Vice President Regulatory Affairs for Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. John Butler, Director Security Operations Support Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jcb@nei.org Mr. Charles B. Brinkman Mike Melton, Senior Project Manager Washington Operations 1776 I Street, NW, Suite 400 ABB-Combustion Engineering, Inc. Washington, DC 20006-3708 12300 Twinbrook Parkway, Suite 330 man@nei.org Rockville, MD 20852 brinkmcb@westinghouse.com Dennis Buschbaum PWROG Chairman Mr. James Gresham, Manager Comanche Peak Steam Electric Station Regulatory Compliance and Plant Licensing 6322 North Farm to Marked Rd 56 Westinghouse Electric Company Mail Code E15 P.O. Box 355 Glen Rose, TX 76043 Pittsburgh, PA 15230-0355 Dennis.Buschbaum@luminant.com greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com