|
---|
Category:- No Document Type Applies
MONTHYEARML24173A0802024-05-0202 May 2024 Retake Exam Form 2.3-1 Outline Quality Checklist ML22081A0732022-03-0202 March 2022 EGLE Wetland Permit No. WRP032246 v.1 ML22041B1072022-02-10010 February 2022 LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML16270A5672016-12-15015 December 2016 Record of Decision, U.S. Nuclear Regulatory Commission, Docket No. 50-341, License Renewal Application for Fermi, Unit 2 Nuclear Power Plant ML16187A3662016-06-30030 June 2016 Final ASP Program Analysis - Reject - Fermi Unit 2 Reactor Scram Due to Loss of Turbine Building Closed Cooling Water (LER 341/2015-006) L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process NRC-14-0035, Fermi 2 LRA Drawing List2014-04-24024 April 2014 Fermi 2 LRA Drawing List ML14125A1882014-04-24024 April 2014 Fermi 2 LRA Drawing List ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML11186A8962011-03-21021 March 2011 NUREG Section 5.3 Recommendation ML11186A5832011-03-21021 March 2011 NUREG Section 3.4 Recommendation ML11186A6402011-03-21021 March 2011 NUREG Section 3.1.1.2 Recommendation ML11186A7282011-03-21021 March 2011 NUREG Section 4.2.1 Recommendation ML11186A7912011-03-21021 March 2011 NUREG Section 4.4.2 Recommendation ML1021608072010-08-0404 August 2010 ISI Request for Information ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0911306562009-04-23023 April 2009 04/23/09 Request for Information Mod 50.59 Review - Initial Selection Scope ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0905602932009-02-25025 February 2009 RFI for ISFSI Pad Inspection - Docket Number 072-00071 and 050-00341 ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues 2024-05-02
[Table view] |
Text
Home > Facility Locator > Operating Nuclear Power Reactors by Location or Name > Davis-Besse Nuclear Power Station, Unit 1 Davis-Besse Nuclear Power Station, Unit 1 Location: Oak Harbor, OH (21 miles ESE of Toledo, OH) in Region III Operator: FirstEnergy Nuclear Operating Company Operating License:
Issued - 04/22/1977 License Expires:
04/22/2017 Docket Number:
05000346 Reactor Type: Pressurized Water Reactor Electrical Output:
913 MWe Reactor Vendor/Type:
Babcock & Wilcox Raised Loop Containment Type:
Dry, Ambient Pressure Plant DiagramPlant Information Contacts Reactor Status Report (Daily)
- Reactor Event Notification
- Safety Performance Summary
- Inspection Reports l Dataset (Prev. 12 Mos.) l Data Dictionary
- US Plant Inspections following Japan Event
- Severe Accident Inspections
- FEMA After Action Reports (Emergency Exercises)
- Sr. Public Affairs Officer:
Viktoria Mitlyng - 630-829-9662
Prema Chandrathil - 630-829-9663
D. Kimble - 419-244-4494
A. Wilson - 419-244-4496
- Plant Environmental Report
- Reactor Oversight Process
- NRC Emergency Prepar edness and Response
- FEMA's State Offices and Agencies of Emergency Management
- ADAMS - for additional documents
- Subscribe to E-mail Notices for Reactor Correspondence
- Pa ge 1of 2 N RC: Davis-Besse Nuclear Power Station, Unit 1 9/23/2011 htt p://www.nrc.
g ov/info-finder/reactor/davi.html P a ge Last Reviewed/Updated Frida y , June 24, 2011
©2000- 2011 NRC Pa ge 2of 2 N RC: Davis-Besse Nuclear Power Station, Unit 1 9/23/2011 htt p://www.nrc.
g ov/info-finder/reactor/davi.html