Finding | |
---|---|
Title | Failure to Follow Scaffold Control Procedure |
Description | The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to adequately implement scaffolding control procedural requirements related to post-installation inspections and engineering safety evaluations for scaffolding constructed within 2 inches of safety-related or fire protection equipment. During plant walkdowns, inspectors identified multiple examples of the licensee not properly implementing Entergys corporate and site procedures for the control of scaffolding. The licensees immediate corrective actions included inspecting the scaffolding that had been installed, modifying or removing it where appropriate, and properly posting the scaffolds. This issue was entered into the licensees corrective action program as Condition Reports CR-GGN-2011-03480, CR-GGN-2011-03601, CR-GGN-2011-03602, and CR-GGN-2011-03603. The inspectors determined that this finding is more than minor because it is associated with the external factors and equipment performance attributes of the Mitigating Systems Cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609.04, Phase 1 - Initial Screening and Characterization of Findings, inspectors determined the finding was of very low safety significance (Green), because it was not a design or qualification deficiency, did not represent a loss of a system safety function, and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The inspectors determined the apparent cause of this finding was lack of supervisor oversight during scaffold construction. Therefore the finding has a cross-cutting aspect in the area of human performance associated with work practices, in that the licensee did not provide effective supervisor oversight of workers constructing scaffolding to ensure these activities were performed per procedural requirements. |
Site: | Grand Gulf ![]() |
---|---|
Report | IR 05000416/2011003 Section 1R04 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | J Drake M Baquera R Kumana R Smith V Gaddy A Fairbanks B Rice E Uribe J Braisted |
CCA | H.2, Field Presence |
INPO aspect | LA.2 |
' | |