| | Q | CCA | Title |
|---|
| 05000416/FIN-2009201-02 | 2009Q4 | | Security |
| 05000416/FIN-2009201-01 | 2009Q4 | P.2 | Security |
| 05000416/FIN-2009008-02 | 2009Q4 | P.5 P.2(b) | Failure to Identify and Correct Oil-Impregnated Insulation on Pump Turbines |
| 05000416/FIN-2009008-01 | 2009Q4 | P.3 | Inadequate Procedure Used to Vent the Reactor Core Isolation Cooling System |
| 05000416/FIN-2010002-01 | 2010Q1 | H.14 | Failure to Restore Control Room Air Conditioning Subsystem B to Operable Status Within the Required Time of 30 days |
| 05000416/FIN-2010002-04 | 2010Q1 | H.12 | Failure to Follow Procedures Results in Damage to Fuel Assembly and Fuel Handling Platform Mast |
| 05000416/FIN-2010002-03 | 2010Q1 | P.2 | Inadequate Actions in Response to a Steam Leak Result in an Automatic Reactor Scram |
| 05000416/FIN-2010002-02 | 2010Q1 | H.2 | Failure to Follow Work Instructions Results in Loss of Buss and a Plant Transient |
| 05000416/FIN-2010003-02 | 2010Q2 | H.12 | Failure to Follow Procedure Results in Loss of Decay Heat Removal to the Spent Fuel Pool |
| 05000416/FIN-2010003-01 | 2010Q2 | H.9 | Failure to Perform an Adequate Risk Assessment for Emergent |
| 05000416/FIN-2010004-06 | 2010Q3 | H.7 | Failure to Properly Implement an Adequate Structural Monitoring Program |
| 05000416/FIN-2010004-05 | 2010Q3 | H.5 | Failure to Follow the Radiological Protection Job Coverage Procedure |
| 05000416/FIN-2010004-04 | 2010Q3 | H.5 | Primary Meteorological Tower Inoperable Without Compensatory Actions in Place |
| 05000416/FIN-2010004-03 | 2010Q3 | P.3 | Failure to Remove Foreign Material from the Control Room Air Conditioning Systems |
| 05000416/FIN-2010403-01 | 2010Q3 | H.8 | Security |
| 05000416/FIN-2010004-02 | 2010Q3 | H.13 | Inadequate Risk Assessment for Switchyard Battery Replacement |
| 05000416/FIN-2010004-01 | 2010Q3 | H.1 | Degraded Fire Door Barrier Protecting the Safeguards Switchgear Rooms |