05000275/FIN-2011002-01
From kanterella
Revision as of 14:05, 30 September 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Inadequate Design Control for the Preferred Offsite Power System |
Description | The inspectors identified a Green noncited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, after Pacific Gas and Electric failed to ensure that the preferred offsite power system design basis was correctly translated into electrical dynamic loading Calculations 357A-DC, Units 1 and 2 Load Flow, Short Circuit and Motor Starting Analysis, Revision 12 and 359-DC, Offsite Power Dynamic Analysis, Revision 8. The licensee did not include the limiting load flow cases representing the largest total onsite demand for both units as required by the plant design basis. On July 7, 2010, the NRC clarified that the Diablo Canyon current licensing basis required the preferred offsite power system to have adequate capacity and capability to supply the most limiting loading requirements, including a dual unit trip. The licensee subsequently entered the condition into the corrective action program as Notification 50289590 and revised the station dynamic loading analysis to reflect the increased onsite power demand. The inspectors concluded that the failure to ensure that the dynamic loading analysis included all design basis requirements was a performance deficiency. This performance deficiency is more than minor because the finding was associated with the Mitigating Systems Cornerstone initial design control attribute and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Because the inspectors were unable to conclude that the preferred offsite power system had not been inoperable for greater than the allowed Technical Specification outage time, a senior reactor analyst performed a bounding Phase 3 analysis. The Phase 3 analysis demonstrated that the subject finding was of very low safety significance (Green), because of the small increase of probability of a loss of offsite power that the finding represented. This finding had a crosscutting aspect in the area of problem identification and resolution associated with the corrective action program component because the licensee did not thoroughly evaluate the current licensing basis requirements to ensure that resolutions addressed causes and extent of conditions, as necessary P.1(c). |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2011002 Section 1R01 |
Date counted | Mar 31, 2011 (2011Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.01 |
Inspectors (proximate) | D Reinert J Braisted C Denissen P Goldberg M Peck G Miller |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |
Finding - Diablo Canyon - IR 05000275/2011002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Diablo Canyon) @ 2011Q1