|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20136A2552020-04-21021 April 2020 10 CFR Part 21 Report Notification for Curtiss Wright Scientech Certain RTL500 and RTL851 Modules ML19261A1942019-09-0606 September 2019 Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16076A2612016-03-11011 March 2016 Part 21 - Commercial Grade Cap Screws Provided with Safety Related Fisher Type 3570 Positioners ML15205A2892015-07-24024 July 2015 Notification of Part 21 Report - Deviation in Nozzle Modeling Internal Reports ML15188A0662015-06-25025 June 2015 Part 21 Report - Deviation in Nozzle Modeling Internal Reports ML15155A5752015-05-29029 May 2015 C&D Technologies, Inc. - Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars at Indian Point ML15155A5762015-05-29029 May 2015 C&D Technologies, Inc., Interim Part 21 Report - Inability to Complete Evaluation Regarding Cracking in KCR-13 Standby Battery Jars at Indian Point ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14210A0072014-07-18018 July 2014 Part 21 Report - Cracking in KCR-13 Standby Battery Jars ML14212A4012014-07-18018 July 2014 Final Report - 10 CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars ML14134A1222014-05-0909 May 2014 Notification of Potential Part 21 Report - Cracking in KCR-13 Standby Battery Jars ML14139A0172014-04-28028 April 2014 Updated Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML14063A4342014-02-24024 February 2014 Part 21 Report - Cracking in KCR-13 Standby Battery Jars ML14034A1892014-01-23023 January 2014 Part 21 - Loose Battery Vent Assemblies ML14006A0052013-12-20020 December 2013 Cracking in KCR-13 Standby Battery Jars ML13358A3062013-12-20020 December 2013 Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML11228A0862011-08-0101 August 2011 Submittal of 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0102, Rev. 0, Air Start Motors with Friction-Clutch Inertia Drives ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves ML1017204862010-06-16016 June 2010 Part 21 Notification - Tyco Electronic Relay Recall ML0926802462009-09-23023 September 2009 Notification of Potential Part 21 on Reportable Occurrence Under 10 CFR Part 21: Firmware Anomaly in the Model RM-80 Radiation Monitoring System ML0914904882009-05-28028 May 2009 Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency ML0904104852009-02-0606 February 2009 Notification of Potential Part 21 Report (Draft) Re Defective ASME SA-193, Grade 6 Cap Screw Material ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0903502172009-01-27027 January 2009 Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches 2023-03-07
[Table view] |
Text
FAIRBANKS MORSE 701 White Avenue Dominic D. Dedolph Beloit, Wisconsin 53511 Manager, Quality Assurance Tel: 608-364-8132 ASQ-CQM, CQE, CQA, CQT Fax: 608-364-8480 Dominic.Dedolph@fairbanksmorse.com www.fairbanksmorse.com U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 April 29, 2008
Subject:
10 CFR 21 NOTIFICATION
-IDENTIFICATION OF DEFECT ALCO SNUBBER VALVE MICRO-CRACKING Greetings, Pursuant to 10 CFR 21.21 (d)(3)(ii), Fairbanks Morse Engine is submitting a written notification on the identification of a defect that is considered to be a substantial safety hazard.There is a three page attachment to this letter. This attached document is the FME"Notification Report Serial Number 08-01, providing the information requested by 10 CFR 21.21 (d)(4). Should there be any questions, please contact me at the phone number listed above or Ted Stevenson at 608-364-8424.
Sincerely, Dominic Dedolph Manager, Quality Assurance Attachment c: A. Gioffredi A. Elovic T. Stevenson M. Cunningham B. Schoenike an E~ro ndusriescompny Pge 1of an EnPro Industries company Page 1 of 1 FME Notification Report Serial Number 08-01 Fairbanks Morse Engine 1 OCFR 21.21 (d)(3)(ii)
Notification (i) Name and address-of the individual or individuals informing the Commission.
Mr. Dominic Dedolph Manager, Quality Assurance Fairbanks Morse Engine 701 White Avenue Beloit, WI 53511 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.Facility: Entergy (Indian Point)Basic component which fails to comply or contains a defect: ALCO Fuel Snubber Valve P/N 2402466-1 The snubber valves in the Emergency Diesel Generator are installed in the high pressure fuel line between the fuel injection pump and the injection nozzle and serve as a pulsation dampener.(iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.Fairbanks Morse Engine (FME)701 White Avenue Beloit, WI 53511 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.FME form BF5548 Page] of3 FME Notification Report Serial Number 08-01 Fairbanks Morse Engine 1OCFR 21.21 (d)(3)(ii)
Notification Nature of defect: Fairbanks Morse Engine (FME) evaluation has determined that a potential safety hazard exists for ALCO fuel injection snubber valves due to micro-cracking in the tip of the snubber valve created during the material surface hardening process when the tips of the snubber valve were quenched in water.Up until 2007, the snubber valves were a purchased item. FME elected to begin manufacturing the snubber valves in order to attain better quality control over this item. The FME manufactured snubber valves, including the heat treatment process, were initially qualified via destructive analysis which revealed no micro-cracking.
Ongoing process controls included destructive analysis to verify the heat treatment process. During this ongoing sampling, FME metallurgical evaluation found micro-cracking in the fuel passage near the tip on one sample. Additional destructive analysis showed micro-cracking occurred on approximately 2 of 5 pieces that are quenched in water during the heat treatment process.No failures of FME manufactured snubber valves have been reported by any of FME's customers.
Safety hazard which could be created by such defect: Micro-cracking in the tip of the snubber valve could potentially lead to material "flaking".
It has been postulated that the "flakes" (or particles) could be flushed downstream and become lodged in the nozzle, causing excessive fuel to enter the combustion space and wash the cylinder liner dry and lead to a piston seizure.(v) The date on which the information of such defect or failure to comply was obtained.Deviation discovered on February 29, 2008 Evaluation completed on April 28, 2008 FME form BF5548 Page 2 of 3 FME Notification Report Serial Number 08-01 Fairbanks Morse Engine 10CFR 21.21 (d)(3)(ii)
Notification (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part.Fairbanks Morse Engine manufactured and shipped twelve (12)ALCO Fuel Snubber Valves to Entergy (Indian Point) PO 4500551476.
No other nuclear facilities received product suspected to have this defect.(vii) The corrective action which has been, is being, or will be taken;the name of the individual or organization responsible for the action;and the length of time that has been or will be taken to-complete the action.Root cause analysis was performed and found that water quenching during the heat treatment process resulted in approximately 40% of the tips of the snubber valves to have micro-cracking present. When oil was substituted for the quenching medium, no snubber valves showed any signs of micro-cracking.
The heat treatment process documentation has been updated to specify the quenching medium as oil. Oil has been used exclusively in the heat treatment process of all snubber valves produced by FME since March 1, 2008.(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
FME is notifying Entergy (Indian Point) of the twelve (12) suspect pieces.FME form BF5548 Page 3 of 3