2008/05/01 Indian Point Lr Hearing - Advanced E-Copy of RAI Letter on FP and Elastomers
ML081500678
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/01/2008
From:
NRC/NRR/ADRO
To:
Entergy Nuclear Operations
References
Download: ML081500678 (8)


Text

1 IPRenewal NPEmails From: Kimberly Green Sent: Thursday, May 01, 2008 11:16 AM To: STROUD, MICHAEL D Cc: dtyner@entergy.com

Subject:

Advanced E-Copy of RAI letter on FP and Elastomers Attachments:

ML0811504350 RAI on FP and Elastomers.docMike, Attached is an advanced copy of the RAI letter on fire protection and elastomers. The formal paper copy is in the mail.

KimberlyGreenSafetyPM(301)4151627kimberly.green@nrc.gov Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 86 Mail Envelope Properties (Kimberly.Green@nrc.gov20080501111500)

Subject:

Advanced E-Copy of RAI letter on FP and Elastomers Sent Date: 5/1/2008 11:15:32 AM Received Date: 5/1/2008 11:15:00 AM From: Kimberly Green Created By: Kimberly.Green@nrc.gov Recipients: "dtyner@entergy.com" <dtyner@entergy.com> Tracking Status: None "STROUD, MICHAEL D" <MSTROUD@entergy.com>

Tracking Status: None Post Office: Files Size Date & Time MESSAGE 261 5/1/2008 11:15:00 AM ML0811504350 RAI on FP and Elastomers.doc 105466 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

April 29, 2008

Vice President, Operations

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE

RENEWAL APPLICATION - METAL ENCLOSED BUSES AND FIRE

PROTECTION

Dear Sir or Madam:

By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the

Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or

the staff). The staff is reviewing the information contained in the license renewal application

and has identified, in the enclosure, areas where additional information is needed to complete

the review. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Mr. Robert Walpole, and a mutually agreeable date

for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1627 or via e-mail at kimberly.green@nrc.gov. Sincerely, /RA/

Kimberly Green, Safety Project Manager

Projects Branch 2

Division of License Renewal

Office of Nuclear Reactor Regulation

Docket Nos. 50-247 and 50-286

Enclosure:

As stated

cc w/encl: See next page

ML081150435 OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR NAME KGreen IKing RFranovich (JRowley for)

DATE 04/29/08 04/29/08 0429/08 Letter to M. Balduzzi from K. Green, dated April 29, 2008

DISTRIBUTION

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE

RENEWAL APPLICATION - METAL ENCLOSED BUSES AND FIRE

PROTECTION HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr

RidsNrrDlrRpb1

RidsNrrDlrRpb2

RidsNrrDlrRer1

RidsNrrDlrRer2

RidsNrrDlrRerb

RidsNrrDlrRpob

RidsNrrDciCvib

RidsNrrDciCpnb

RidsNrrDraAfpb

RidsNrrDraAplb

RidsNrrDeEmcb

RidsNrrDeEeeb

RidsNrrDssSrxb

RidsNrrDssSbpb RidsNrrDssScvb

RidsOgcMailCenter


RFranovich EDacus, OCA BPham GMeyer, RI KGreen MMcLaughlin, RI NIqbal NMcNamara, RI RAuluck DScrenci, RI OPA KChang NSheehan, RI OPA MKowal PCataldo, RI JBoska CHott, RI STurk, OGC DJackson, RI LSubin, OGC BWelling, RI BMizuno, OGC RConte, RI SBurnell, OPA ECobey, RI DMcIntyre, OPA MCox, RI

TMensah, OEDO

DNguyen Indian Point Nuclear Generating Units 2 and 3 cc:

Senior Vice President

Entergy Nuclear Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President Oversight

Entergy Nuclear Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety &

Licensing

Entergy Nuclear Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and COO

Entergy Nuclear Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Assistant General Counsel

Entergy Nuclear Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Manager, Licensing

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

Mr. Paul D. Tonko

President and CEO

New York State Energy Research and

Development Authority

17 Columbia Circle

Albany, NY 12203-6399

Mr. John P. Spath

New York State Energy, Research and

Development Authority

17 Columbia Circle

Albany, NY 12203-6399

Mr. Paul Eddy New York State Department

of Public Service

3 Empire State Plaza

Albany, NY 12223-1350

Regional Administrator, Region I

U.S. Nuclear Regulatory Commission

475 Allendale Road

King of Prussia, PA 19406

Senior Resident Inspector's Office

Indian Point 2

U.S. Nuclear Regulatory Commission

P.O. Box 59

Buchanan, NY 10511

Senior Resident Inspector's Office

Indian Point 3

U.S. Nuclear Regulatory Commission

P.O. Box 59

Buchanan, NY 10511

Mr. Charles Donaldson, Esquire

Assistant Attorney General

New York Department of Law

120 Broadway

New York, NY 10271

Mr. Raymond L. Albanese

Four County Coordinator

200 Bradhurst Avenue

Unit 4 Westchester County

Hawthorne, NY 10532

Mayor, Village of Buchanan

236 Tate Avenue

Buchanan, NY 10511

Mr. William DiProfio

PWR SRC Consultant

48 Bear Hill Road

Newton, NH 03858

Indian Point Nuclear Generating Units 2 and 3 cc:

Mr. Garry Randolph

PWR SRC Consultant

1750 Ben Franklin Drive, 7E

Sarasota, FL 34236

Mr. William T. Russell

PWR SRC Consultant

400 Plantation Lane

Stevensville, MD 21666-3232

Mr. Jim Riccio

Greenpeace

702 H Street, NW

Suite 300

Washington, DC 20001

Mr. Phillip Musegaas

Riverkeeper, Inc.

828 South Broadway

Mr. Mark Jacobs

IPSEC 46 Highland Drive

Garrison, NY 10524

Mr. R. M. Waters

Technical Specialist Licensing

450 Broadway

P.O. Box 0249

Buchanan, NY 10511-0249

Mr. Sherwood Martinelli

351 Dyckman

Peekskill, NY 10566

Ms. Susan Shapiro, Esq.

21 Perlman Drive

Spring Valley, NY 10977

Tarrytown, NY 10591

John Sipos

Assistant Attorney General

New York State Department of Law

Environmental Protection Bureau

The Capitol

Albany, NY 12224

Robert Snook Assistant Attorney General

Office of the Attorney General

State of Connecticut

55 Elm Street

P.O. Box 120

Hartford, CT 06141-0120

Ms. Kathryn M. Sutton, Esq.

Morgan, Lewis & Bockius, LLP

1111 Pennsylvania Avenue, NW

Washington, DC 20004

Mr. Paul M. Bessette, Esq.

Morgan, Lewis & Bockius, LLP

1111 Pennsylvania Avenue, NW

Washington, DC 20004

Mr. Martin J. O'Neill, Esq.

Morgan, Lewis & Bockius, LLP

1111 Pennsylvania Avenue, NW

Washington, DC 20004

The Honorable Nita Lowey

222 Mamaroneck Avenue, Suite 310

White Plains, NY 10605

Joan Leary Matthews

Senior Counsel for Special Projects

Office of General Counsel

NYS Department of Environmental

Conservation

625 Broadway

Albany, NY 12233-5500 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION DRAFT REQUEST FOR ADDITIONAL INFORMATION METAL ENCLOSED BUSES AND FIRE PROTECTION RAI 3.6.2.3-1 License renewal application (LRA), Table 3.6.1, under Item Number 3.6.1-10, "Metal enclosed

bus - Enclosure assemblies," states that the only elastomers are access door gaskets and are

considered consumables. NUREG-1801, Volume 2, Item VI.A-12, identifies elastomers as a commodity type that requires an aging management re view (AMR). Confirm that for in-scope metal enclosed buses, there are no other elastomers or gaskets other than the access door

gaskets. For access door elastomers, provide a technical justification of why these components

are excluded from an AMR.

RAI 3.0.3.2.7-2 In response to RAI 3.0.3.2.7-1 in a letter dated March 12, 2008, Entergy states that fire stops (penetration seals) are visually inspected at least once every seven operating cycles (15%

every 24 months). During an audit, the NRC staff reviewed bases documents (for Indian Point

Unit 3) associated with the fire protection AMP. One of the bases documents states that 15% of

fire seals located in fire barriers are demonstrated to be operable by visual inspection on a

frequency of 24 months. However, for those penetration seals that are inaccessible, the

frequency of inspection is given as "not required." Justify the lack of visual inspections of

inaccessible penetration seals.