Pages that link to "B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl"
Jump to navigation
Jump to search
The following pages link to B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl:
Displayed 50 items.
- A05085, Notifies of Change in 850816 Commitment to Provide Improved Plant Operations Review Committee Review of Plant Design Change Records in Response to Insp 50-213/85-15.Commitment Now Considered W/O Merit & Therefore Eliminated (← links)
- B13150, Forwards Topical Rept NUSCO-165, Large Break LOCA Fuel Rod Response (NUFRAP-T6) & Core Oxidation Evaluation Models (Nucom). Final Rept Providing plant-specific Large Break LOCA Analysis Remains Scheduled for Submittal in Jul 1989 (← links)
- B12687, Forwards Relief Request 6.0 for Relief from ASME Code Section XI Requirements for Sys Hydrostatic Test.Request Due to Variations in Elevation Test Boundary That Do Not Allow for Testing within Pressure Range Required by Code.Fee Paid (← links)
- B12669, Forwards Relief Requests 5.0 & 4.0 for Relief from ASME Code Section XI Requirements for Inservice Insp of Category B-J Welds & Specific Valve Internal Surface Visual Exams, Respectively.W/One Oversize Drawing.Fee Paid (← links)
- B12565, Provides Info Re Design of New Rod Cluster Control Assemblies.Assemblies Will Be Placed Into Core During end- of-cycle 14 Refueling Outage.Mechanical Changes Listed (← links)
- B12561, Forwards Rev 14 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790) (← links)
- B12577, Forwards Connecticut Yankee Third 10-Yr Interval Inservice Test Pump & Valve Program Submittal & ...Inservice Insp Plan Summary Submittal, for Third 10-yr Insp Interval Commencing on 880101.Fee Paid (← links)
- B12307, Clarifies 860312 Request for Exemption from Type C Testing Requirements of 10CFR50,App J for Reactor Coolant Charging Penetration P-8.Util Intends to Evaluate Mods to P-8 Pending Results of Integrated Assessment (← links)
- B12244, Forwards Reviews for Isap Topics 1.29, Flooding Evaluation, 1.53, Containment Emergency Sump Performance & 1.62, Feed & Bleed Sys Mod (← links)
- B12248, Forwards Reviews for Isap 1.04, Seismic Qualification of Safety-Related Piping, Isap 1.50, Fracture Toughness of Supports & Isap 1.56, Bolting Degradation, in Accordance W/Jf Opeka (← links)
- B12295, Forwards Review for Isap 2.17, Zircaloy Clad Conversion, Per 850731 Request (← links)
- B12250, Forwards Reviews for Isap Topics 1.24, Tech Spec Surveillance for Hydraulic Snubbers, 1.25, Tech Spec Surveillance for Mechanical Snubbers & 1.46, Inservice Testing for Diesel Generator Auxiliaries (← links)
- A06149, Forwards Fee for Request for Relief from Insp of Longitudinal & Circumferential Pipe Welds for Facility (← links)
- A06070, Requests That Portion of 850510 Amend Request Re Movement of Fuel within Reactor Pressure Vessel Be Retracted,Per Fm Akstulewicz 860903 Request That Util Reconsider Amend Request (← links)
- B12270, Forwards Reviews of Listed Isap Topics Re Generic Ltr 83-28, Including Topic 1.32, Item 2.1,Equipment Classification & Vendor Interface... & Topic 1.41, Item 4.5.1,Reactor Trip Sys Functional Testing, Per Util 850517 Commitment (← links)
- A06472, Forwards Response to NRC 870402 Request for Addl Info Re Nusco 140-1, Nusco Thermal Hydraulic Model Qualifcation Vol 1 (Retran). Util Staff Available to Hold Meeting During Wk of 870518 (← links)
- A05457, Forwards Results of RCS Seismic Reevaluations & Final Plans for Mods Identified in NRC Safety Evaluation of SEP Topic III-6.All Outstanding Issues Re Generic Ltr 84-04 & SEP Topic III-6 Resolved (← links)
- A05041, Forwards Review of Isap Topic 1.21, Reg Guide 1.97 Instrumentation, Per 850517 Commitment.Nrc 850703 Concerns Re Status of Compliance W/Rev 2 to Reg Guide 1.97 Also Addressed (← links)
- B12249, Forwards Reviews of Isap Topics 1.59, Addl Low Temp Overpressure Protection & 1.60, Rcs/Rhr Suction Line Valve Interlock, Per 850517 Commitment (← links)
- B12193, Forwards Reviews for Listed Isap Topics,Including Topics 1.08, Seimic Mods to RCS & 1.13, Inadequate Core Cooling Instrumentation, Per 850517 Commitment (← links)
- B12192, Forwards Reviews for Listed Isap Topics,Including Topic 1.44, Diesel Generator Reliability, Per 850517 Commitment (← links)
- B12245, Forwards Reviews for Listed Isap Topics,Including Topic 1.43, Tech Specs from Generic Ltr 83-37, Per 850517 Commitment (← links)
- B12289, Updates Status of Evaluation,Within Context of Isap,Of Proposed Plant Mod to Reduce Oxygen in Demineralized Water Storage Tank. Failure of Breather Valves on Sys Could Cause Unavailability of Feedwater Sys & Raise Core Melt Frequency (← links)
- B12246, Forwards Reviews of Isap 1.14.2, Install New 480-Volt Load Ctr & Rearrange Equipment in Fire Area S-8, 1.14.4, Install Remote Shutdown Instrumentation Panel & 1.61, Pressurized Thermal Shock, Per 850517 Commitment (← links)
- B12262, Clarifies Commitment Made in Util Re Startup Physics Rept.Review of Safety Analysis,Amend & Rev to Startup Rept Required to Resolve Issue.Amend Request Will Be Submitted During Fourth Quarter 1986 (← links)
- B12207, Submits Summary of Facility PORV Setpoint Issue & Addl Info Supporting Conclusion That Evaluation Unnecessary to Assure Public Safety or Conform to NRC Requirements (← links)
- A06102, Forwards Application Fee for Review & Approval of Interim Acceptance Criteria for Steam Generator Tubes,Per 860724 Submittal,In Response to 860922 Request (← links)
- B11652, Discusses Status of Resolution of Unresolved Item 50-213/85-08-04.Inservice Date of 871201 Planned (← links)
- B12279, Forwards Major Milestone Schedule for Const & Implementation Phases of Erecting New Switchgear Bldg,Per NRC Approval of Exemption from Schedular Requirements of 10CFR50.48 (← links)
- A05951, Suppls Response to Violations Noted in Insp Rept 50-213/86-17,per 860903 Mgt Meeting.Info Consisting of Review of Actual Tank Levels & Annunciator Response Procedures for Tank Low Level Alarms Forwarded on 860908-12 (← links)
- B12219, Requests Extension of 860428 Single Failure Exemption to Respond to Small Break Locas.Plant Mods Cannot Be Completed Until End of Cycle 15 Outage.Probabilistic Safety Study for Permanent Small Break LOCA Response Measures Encl.Fee Paid (← links)
- B12558, Withdraws 860312 Request for Exemption from 10CFR50,App J, Section III.A.4.(a) to Allow Continued Integrated Leak Rate Testing (ILRT) at Reduced Pressure of 15 Psig.Ilrt Will Be Conducted at Test Pressure of 40 Psig (← links)
- B12258, Clarifies 860819 Response to Potential Violation Item 86-17-08 Re Inadequate Emergency Lighting,Radio Communications & Breakers for Stated Valves Action Items, Per App R Insp During Wk of 860616 (← links)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps (← links)
- B12501, Proposes Rev to Bases Section 2.4, Max Safety Settings - Protective Instrumentation. Rev Increases PORV Setpoint Above High Pressure Trip Setpoint (← links)
- B12198, Forwards Reviews of Isap Topic 2.06, Evaluation of RCS Loop Isolation Valves to Mitigate Steam Generator Tube Rupture & Isap Topic 2.07, Auxiliary Pressurizer Spray Nozzle (← links)
- B12194, Forwards Reviews of Isap Topics 1.18,1.26 & 1.42, Reactor Coolant Pump Seal Cooling Mods, Relief Valve & Safety Valve Testing & RCS Vents Tech Specs, Respectively (← links)
- B12556, Clarifies 861231 Application to Amend License DPR-61, Revising Tech Specs Re Significance of Value Represented as Three Loop Power Level,Per NRC Request (← links)
- B12190, Forwards Reviews for Isap Topic 1.02, High/Low Pressure Valve Interlocks, Isap Topic 1.07, Vital Bus Feed Realignment Mods, Isap Topic 1.11, Primary Auxiliary Bldg Ventilation Sys Mods & Isap Topic 1.19, Control Room.. (← links)
- B12204, Forwards Reviews of Isap Topic 1.14.1, Curbs Ramps Water Control Structures,Seals & Shields & Isap Topic 1.49, Steam Generator Tube Integrity (← links)
- B12197, Forwards Reviews of Isap Topic 2.01, Secondary Side Chemistry Monitoring, Isap Topic 2.04, Modernize Reactor Protection & Control Sys & Isap Topic 2.05, Process Computer Replacement (← links)
- B12559, Forwards Addl Info Re Piping Stress Analysis for ECCS Mods, Per NRC 870520 & 0604 Requests.Results of Analysis Indicate That Piping Stress Levels for Deadweight,Thermal & Seismic Loading Conditions within Allowable Limits & Acceptable (← links)
- B12205, Forwards Reviews of Isap Topic 2.02, Demineralized Water Storage Tank Oxygen Reduction & Isap Topic 2.10, Administration Bldg Upgrade (← links)
- B12340, Forwards Bimonthly Progress Rept 1 Re Const of New Switchgear Bldg (← links)
- B12337, Requests Approval to Defer Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First 8-wk Outage Commencing After 870101.Performing Mods During Operation Could Have Significant Impact on Sys & Components (← links)
- B12196, Forwards Reviews for Listed Isap Topics,Per 850517 Commitment Re Isap Program,Including Isap Topic 1.51, Sys Interactions, Isap Topic 1.54, Safety Implications of Control Sys & Isap Topic 1.58, Steam Binding.. (← links)
- B12412, Forwards Summary of Results & Insights Gained from Fire PRA & Planned Actions to Reduce the Probabilistic Risk Due to Fires (← links)
- A06421, Forwards Response to 870427 Request for Addl Info Re NULAP5. Lack of Water Slug Formation Due to HPI Would Be Independent of Nodalization in Sys Representation (← links)
- B12343, Forwards Rev 2 to Environ Qualification Electrical Equipment Master List.Changes Made Based on Equipment Replacement & Clarification of Equipment/Component Certification Data (← links)
- B12351, Forwards Rev 12 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)) (← links)