Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20070K726 | 19 July 1994 | Proposed TS SR 4.7.6.k,ensuring That Each Control Room Ventilation Sys Has Capability to Remove Required Heat Load | Earthquake |
ML20070P396 | 20 March 1991 | Proposed Tech Specs to Permit Use of Continuous Pressure Testing of Containment Airlock Door Seal Gaskets in Lieu of Manual Testing | |
ML20070U080 | 31 January 1991 | Proposed Tech Specs Reducing RHR Min Flow Rate,Removing RHR Autoclosure Interlock on RHR Sys Suction Isolation Valves & Allowing Operation of Safety Injection Pump to Mitigate Effects of Loss of DHR | Safe Shutdown Unanalyzed Condition Shutdown Margin Stroke time Fuel cladding |
ML20071G377 | 6 July 1994 | Proposed Tech Specs Re Steam Generator Tube Sleeving Methodology | |
ML20071K973 | 26 July 1994 | Proposed Tech Specs Adding Unit & Cycle Specific Footnotes Relative to Positive Moderator Temp Coefficient & Reduced Thermal Design Flow | Shutdown Margin Fuel cladding |
ML20071L487 | 1 August 1994 | Proposed Tech Specs Incorporating 1.0 V SG Tube Interim Plugging Criteria Beginning W/Unit Cycle 7 | |
ML20071P030 | 2 August 1994 | Proposed TS 3.3.3.5, Remote Shutdown Instrumentation | Safe Shutdown Enforcement Discretion |
ML20072U256 | 7 September 1994 | Proposed Tech Specs for Consistency W/Model TS in Draft GL, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20072U437 | 8 April 1991 | Revised Tech Specs Re Use of Continuous Pressure Testing of Containment Airlock Door Seal Gaskets in Lieu of Manual Testing | |
ML20073B925 | 19 April 1991 | Proposed Tech Specs Re Operability Requirements for Radiation Monitoring Instrumentation Channels | |
ML20073C042 | 17 September 1994 | Proposed TS 3/4.4.5, Steam Generators, Allowing EC Bobbin Coil Probe voltage-based SG Tube Support Plate Interim Plugging Criteria to Be Applied for Byron Unit 1 Beginning W/Cycle 7 | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20073C318 | 16 September 1994 | Proposed Tech Specs 4.3.1.2, RTS Response Time & 4.3.2.2, ESF Response Time, Eliminating Periodic Response Time Testing & Indicating That Sys Response Time Shall Be Verified Using Sensor Response Time | |
ML20073D345 | 17 September 1994 | Proposed Tech Spec Section 3/4.4.5, Steam Generators, Attachment F,Page 2 | |
ML20073K761 | 7 October 1994 | Proposed TS 6.3.1,defining Who Is Designated as Radiation Protection Manager | |
ML20073S032 | 10 February 1994 | Proposed Tech Specs 4.8.2.1.2.e & 4.8.2.1.2.f Re Dc Sources | |
ML20078H978 | 2 February 1995 | Proposed Tech Specs,Requesting Approval of Amend to Permit Use of Alternate Tuge Repair Criteria,F*,For SG at Facilities | Boric Acid Operating Basis Earthquake |
ML20078Q539 | 15 February 1995 | Proposed Tech Specs Re Positive Moderator Temp Coefficient | Boric Acid Shutdown Margin Probabilistic Risk Assessment Annual Radiological Environmental Operating Report |
ML20080H351 | 13 February 1995 | Proposed Tech Specs,Increasing Interim Plugging Criteria Value for Plants SG | Non-Destructive Examination Safe Shutdown Earthquake Operating Basis Earthquake |
ML20080J417 | 21 February 1995 | Proposed Tech Specs Re RTD Bypass Elimination Mod That Will Remove Bypass Piping & Valves & Be Replaced W/Fast Response RTDs Mounted in Thermowells Welded in RCS Loop Piping | Shutdown Margin |
ML20082A236 | 28 June 1991 | Proposed Tech Specs Tables 2.2-1 & 3.3-4 Re Reactor Trip Sys Instrumentation Trip Setpoints & ESF Actuation Sys Instrumentation Trip Setpoints | |
ML20082A284 | 28 June 1991 | Proposed Tech Specs 3/4.4.4 & 3/4.4.9.3,addressing Concerns of Generic Ltr 90-06 Re PORVs & LTOP | Stroke time Pressure Boundary Leakage |
ML20082G578 | 10 June 1991 | Proposed Tech Specs Deleting Radioactive Liquid Effluent Monitoring Instrumentation,Radioactive Gaseous Effluent Monitoring Instrumentation & Radioactive Gaseous Waste Sampling | Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Power change |
ML20082U235 | 6 September 1983 | Draft Tech Specs Re Containment Sys Primary Containment Leakage.Related Info Encl | |
ML20084A614 | 17 May 1995 | Proposed Tech Specs Section 3/4.4.5,allowing SG Tubes to Be Repaired Using Tungsten Inert Gas Welded Sleeve Process Described in Abb C-E Licensing Rept CEN-621-P,Rev 0, Comm Ed...Sg Tube Repair Using Leak Tight Sleeves | Safe Shutdown Operating Basis Earthquake Earthquake Fire Protection Program |
ML20084D275 | 30 January 1974 | Proposed Tech Spec 15.4.11 Re Hydraulic Shock Suppressors | |
ML20084U307 | 8 June 1995 | Proposed Tech Specs Re Revised SRs & Administrative Requirements Associated W/Edgs | Safe Shutdown Offsite Circuit |
ML20085F868 | 17 October 1991 | Proposed Tech Spec Pages 3/4 3-57 & 3/4 3-59 Re Relocating Procedural Details of Current Radioactive Effluent Program, Radiological Environ Monitoring Program & Solid Radwaste Program | |
ML20086D999 | 7 July 1995 | Proposed Tech Specs,Implementing 3.0 Volt Bobbin Coil Probe, Voltage Based,Sg TSP Alternative Plugging Criteria Limit for Outside Diameter Stress Corrosion Cracking Indications at hot-leg TSP Intersections | Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Power change |
ML20086E180 | 18 November 1991 | Revised Tech Spec Tables 2.2-1 & 3.3-4 Re Reactor Trip Instrumentation Trip Setpoints & ESFAS Instrumentation Trip Setpoints,Respectively,Reducing Setpoint for lo-lo Steam Generator Level Reactor Trip from 40.8% to 34.8% | |
ML20087D838 | 13 January 1992 | Proposed Tech Specs Table 3.3-6 & 4.3-3 Re Radiation Monitors Assigned to Each Train of Control Room Ventilation | |
ML20090A254 | 27 February 1992 | Revised TS Pages 3/4 2-9 Re Measurement of RCS Total Flow Rate | |
ML20090G390 | 4 March 1992 | Proposed Tech Specs Bases Pages 3/4 3-3 & 3/4 3-4 | |
ML20092B055 | 1 September 1995 | Proposed Tech Specs Re Increase in Interim Plugging Criteria | Non-Destructive Examination Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Power change |
ML20092C838 | 6 February 1992 | Proposed Tech Specs Tables 3.3-6 & 4.3-3 Re Radiation Monitoring Instrumentation | |
ML20092H326 | 14 September 1995 | Proposed Tech Specs 5.3.1, Fuel Assemblies, Allowing Use of Alternate Zirconium Based Fuel Cladding,Zirlo & 5.4.1.a, Referring to UFSAR Rather than FSAR | Fuel cladding |
ML20092P333 | 1 February 1984 | Proposed Deleted Tech Spec 7.2.2.1, Sensor Time Response Testing, License Condition 20.Deletion Requested on Basis of Prohibitive Limitations of Process Noise Methodology. Methodology Will Be Used as Backup | |
ML20094P167 | 31 March 1992 | Proposed Tech Specs 3/4.7.5 & Bases Section 3/4.7.5 for Ultimate Heat Sink | Ultimate heat sink |
ML20095B395 | 15 April 1992 | Proposed TSs 2.2.1,Table 2.2-1 & 3.3.2,Table 3.3-4 & Associated Bases in Ref to Setpoint Reconciliation Program | |
ML20095D627 | 6 December 1995 | Proposed Tech Specs,Revising TS Section 3/4.6.1, Primary Containment, to Incorporate Requirements of Revised 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Effective on 951026 | Packing leak Offsite Dose Calculation Manual Pressure Boundary Leakage |
ML20095J512 | 21 December 1995 | Proposed Tech Specs,Expanding Plants Operating Limits Rept to Include Limits Suggested by GL 88-16, Removal of Cycle- Specific Parameter Limits from Ts | |
ML20096C026 | 11 January 1996 | Proposed Tech Specs,Revising TS 3.3.1, Rt Sys Instrumentation, Table 3.3-1,Functional Unit 6, Source Range,Neutron Flux, Consistent W/Improved STS | Shutdown Margin |
ML20098C709 | 3 October 1995 | Proposed Tech Specs Re line-item Improvements to Reduce Surveillance Requirements for Testing During Power Operation,Per GL 93-05 | |
ML20099E070 | 5 August 1992 | Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Re Quarterly Testing of ESFs | Shutdown Margin |
ML20099K172 | 1 March 1976 | Proposed Tech Specs Changing Rod Block Monitor/Rod Block Setpoint During Single Loop Operation | |
ML20099K268 | 19 March 1976 | Proposed Tech Specs Re Boron Concentration in Moderator Water for Standby Liquid Control Sys | Shutdown Margin |
ML20099K512 | 7 September 1976 | Proposed Tech Specs Allowing Operation at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed | Abnormal operational transient |
ML20099K559 | 12 January 1977 | Proposed Tech Spec Change RTS-74,allowing Single Loop Operation W/Bypass Flow Holes Plugged | High Radiation Area Hydrostatic Abnormal operational transient Scram Discharge Volume Fuel cladding |
ML20100L234 | 27 February 1996 | Proposed Tech Specs,Implementing 10CFR50,App J,Option B Which Allows Use of Performance Based Surveillance Frequencies for Type A,B & C Tests,Rather than Predetermined Fixed Intervals | Packing leak Offsite Dose Calculation Manual Pressure Boundary Leakage |
ML20101K013 | 28 March 1996 | Proposed Tech Specs SR 4.6.1.2,reflecting Exception to Min 24 Month Interval Between Type a Tests Specified in Section 9.2.3 of NEI 94-01,using Nominal 18 Month Interval Instead, to Correspond W/Plants Refueling Interval | |
ML20101M758 | 2 April 1996 | Proposed TS Page 3/4 5-2 Re GL 93-05 Line Item Improvements |