Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML062020728 | 21 July 2006 | Summary of 07/21/2006 Regulatory Conference with Entergy Operations, Inc. Apparent Violation at River Bend Station | |
ML062270077 | 23 May 2006 | Weld Overlay of Cast Material | Weld Overlay Dissimilar Metal Weld |
ML063520314 | 18 December 2006 | Summary of Meeting with Entergy Operations, Inc. River Bend Station | |
ML070870718 | 3 April 2007 | Summary of Meeting with Entergy Operations, Inc. Re Steam Generator Batwing Degradation Issue Entergy'S Investigation of the Batwing Degradation Condition, to Review Analysis Supporting Safe Plant Operation, to Review the Mitigation | |
ML071200525 | 30 April 2007 | Summary of Annual Performance Assessment Meeting for River Bend Station | |
ML071200527 | 30 April 2007 | Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 | Aging Management Continuous fire watch |
ML071450505 | 21 May 2007 | Summary of Waterford-3 Steam Electric Station End-of-cycle Public Meeting | |
ML071800426 | 29 June 2007 | Summary of Arkansas Nuclear One End-Of-Cycle Public Meeting | |
ML071900202 | 9 July 2007 | Summary of Meeting with Entergy Operations, Inc., Regarding Discussion of River Bend Station Plans for Improving Human Performance and Corrective Action Program | |
ML072270570 | 24 August 2007 | Summary of 4/30/07 and 5/3/07 Conference Calls and Enclosure - 2007 Steam Generator Tube Inspections | |
ML072670102 | 10 October 2007 | 9/06/2007 Summary of Meeting with Representatives of EOI for Waterford 3 Batwing Issues and Planned Actions During the Mid-Cycle Outage | |
ML080510251 | 20 February 2008 | Summary of Meeting with Entergy Operations, Inc. Degraded Batwings Metal Support Structures for Tubes in Waterford 3's Steam Generators | |
ML080730155 | 13 March 2008 | Arkansas Heightened Oversight Summary - Conference Call on February 13, 2008 | |
ML081430674 | 22 May 2008 | Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One | |
ML081780404 | 28 October 2008 | Summary of May 5, 8, 9, 12, and 16, 2008, Discussions on Steam Generator Tube Inspections | |
ML083110206 | 6 November 2008 | Summary of Meeting with Entergy to Discuss an Open Substantive Crosscutting Issue at Arkansas Nuclear One | |
ML083290585 | 1 December 2008 | Summary of Meeting with Entergy Operations, Inc. to Discuss the First Inservice Inspection (Lsi) Results for the New Steam Generators at Arkansas Nuclear One, Unit 1 | |
ML083380334 | 31 December 2008 | Summary of Conference Call with Arkansas Nuclear One Unit 1, Regarding 2008 Steam Generator Tube Inspections | Nondestructive Examination Finite Element Analysis |
ML090640444 | 28 January 2009 | Enclosure 10: Case Study 6: Arkansas Nuclear One Use of LCO 3.0.5 - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf | Temporary Modification |
ML090960327 | 6 April 2009 | Summary of Public Meeting with Entergy on Waterford Steam Electric Station Unit -3 2008 Performance | |
ML091310417 | 11 May 2009 | Summary of Meeting with Entergy to Discuss Arkansas Nuclear One 2008 Performance | |
ML091870150 | 10 July 2009 | Summary of June 29, 2009, Conference Call with Entergy Operations, Inc., Related to Decommission Funding Assurance | |
ML091900312 | 14 July 2009 | Summary of June 29, 2009, Conference Call with Entergy Operations, Inc., on Decommissioning Funding Assurance | |
ML092151044 | 19 August 2009 | Summary of Meeting with Entergy Operations, Inc., River Bend Station, Unit 1, Relief Requests Related to Code Case N-716 and RR-ISI-012 to Extend Second Interval | Grace period |
ML092370657 | 3 September 2009 | Summary of Conference Call with Entergy Operations, Inc. on Draft Response to the RAI for GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis | |
ML093520058 | 6 January 2010 | Summary of Meeting with Entergy Operations, Inc. to Discuss Results of Arkansas Nuclear One, Unit 1, Steam Generator Tube Inspection During Refueling Outage and Issue of Bowed Tie Rods and Tube Support Plate Wear | |
ML100050664 | 7 January 2010 | Summary of Conference Calls on 11/13/09 and 11/17/09 with Entergy Operations, Inc., Discussed Steam Generator Tube Inspections | |
ML100700301 | 7 April 2010 | Summary Follow-Up Conference Call with Entergy Operations, Inc. to Discuss Draft Response for Waterford, Unit 3, to the Request for Additional Information for Generic Letter 2004-02 | |
ML100980583 | 8 April 2010 | Summary of Meeting with Entergy Operations, Inc. to Discuss the 2009 Nuclear Safety Culture Assessment Performed at Arkansas Nuclear One, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station, Unit 3 | |
ML101120971 | 16 April 2010 | Summary of Meeting to Discuss the Safety Performance at the River Bend Station Between January 1 and December 31, 2009 | |
ML101460630 | 26 May 2010 | Summary of Public Meeting with Entergy Operations on Arkansas Nuclear One Units 1 and 2 2009 Performance | |
ML101460631 | 26 May 2010 | Summary of Public Meeting with Entergy Operations on Waterford Steam Electric Station Unit 3 2009 Performance | |
ML101530232 | 9 June 2010 | Summary of Conference Call Meeting with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 | Coatings |
ML101670428 | 17 June 2010 | Meeting Summary Notice | Fire Protection Program |
ML102670545 | 24 September 2010 | Public Meeting with Entergy, Inc., to Discuss Licensee Activities Associated with Emergency Diesel Generators and Control Building Chillers | |
ML102940351 | 19 October 2010 | 10/182010 Summary of Public Meeting with Entergy Operations to Discuss Initiatives to Improve Plant Reliability | |
ML103190416 | 17 November 2010 | Summary of Meeting with Entergy Operations, Inc. to Discuss Request for Additional Information for Waterford Unit 3 License Amendment Request to Approve FSAR Change for Leak-Before-Break of the Pressurizer Surge Line | |
ML103340494 | 10 December 2010 | November 19, 2010 Summary of Meeting with Entergy Operation Inc, to Discuss River Bend Preliminary Enforcement | |
ML110810467 | 14 April 2011 | Summary of Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 License Amendment Request to Revise Technical Specifications Related to Completion Times for One Inoperable RCS Cooling Loop | |
ML111040171 | 27 April 2011 | 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements | |
ML111050398 | 23 May 2011 | 4/13/11 Summary of Preapplication Meeting with Entergy Operations, Inc., on Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 (TAC Nos. ME5925 and ME5926), Palisades Nuclear Plant, and Waterford Un | Probabilistic Risk Assessment |
ML111100924 | 29 April 2011 | Summary of 3/15/11 (P.M. Session) Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 Planned License Amendment Request for Technical Specification Change Service Water System Related Support Features | Probabilistic Risk Assessment |
ML111300020 | 9 May 2011 | Summary of Category 3 Open House/Public Meeting, Annual Performance Assessment with Arkansas Nuclear One, Units 1 & 2 | Open House |
ML111380641 | 23 May 2011 | Summary of February 7 and April 18, 2011, Discussions on Steam Generator Tube Inspections During the Spring 2011 Refueling Outage 17 | |
ML111390859 | 19 May 2011 | Summary of Meeting with Open House Meeting Summary for Arkansas Nuclear One 2010 Performance | Open House |
ML111390883 | 19 May 2011 | Open House Meeting Summary for Waterford Steam Electric Station 2010 Performance | Open House |
ML111790152 | 20 May 2011 | Summary of Annual Performance Assessment Meeting for River Bend Station | |
ML111790639 | 28 June 2011 | Summary of Meeting with Entergy Operations Inc | |
ML112790381 | 1 November 2011 | Summary of Meeting with Entergy Operations, Inc. to Discuss Amendment Request to Revise Arkansas Nuclear One, Unit 2's Fuel Handling Accident (FHA) Analysis and Several TSTFs 51, 272, 286, and 471 That Support FHA | |
ML120270416 | 13 February 2012 | 1/26/2012 - Summary of Meeting with Entergy and Exelon to Discuss Recent Once-Through Steam Generator Inservice Inspection Results |