Letter Sequence Meeting |
---|
|
|
MONTHYEARML1109004362011-03-30030 March 2011 Correction Notice of Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Standard (NFPA) 805 License Amendment Request Submittal for Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting ML1108804522011-03-30030 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting ML1110503982011-05-23023 May 2011 4/13/11 Summary of Preapplication Meeting with Entergy Operations, Inc., on Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 (TAC Nos. ME5925 and ME5926), Palisades Nuclear Plant, and Waterford Un Project stage: Meeting 2011-03-30
[Table View] |
4/13/11 Summary of Preapplication Meeting with Entergy Operations, Inc., on Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 (TAC Nos. ME5925 and ME5926), Palisades Nuclear Plant, and Waterford UnML111050398 |
Person / Time |
---|
Site: |
Palisades, Arkansas Nuclear, Waterford |
---|
Issue date: |
05/23/2011 |
---|
From: |
Kalyanam N Plant Licensing Branch IV |
---|
To: |
|
---|
Kalyanam N, NRR/DLPM, 415-1480 |
References |
---|
TAC ME5925, TAC ME5926 |
Download: ML111050398 (4) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24303A1162024-11-0606 November 2024 Summary of Meeting with Holtec Decommissioning International, LLC Regarding LAR Request to Approve the Biasi Critical Heat Flux Correlation for Use with the Main Steam Line Break Analysis to Support Potential ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24257A0582024-09-26026 September 2024 Summary of August 1, 2024, Hybrid Public Meeting on the Potential Palisades Nuclear Plant Restart ML24212A0592024-08-0606 August 2024 May 15, 2024, Summary of Meeting with Holtec Decommissioning International,Llc Regarding LAR to Approve Biasi Critical Heat Flux Correlation for Use with Main Steam Line Break Analysis to Support Potential Reauthorization of Power Operation ML24166A2912024-06-25025 June 2024 April 29, 2024, Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a Quality Assurance Program Manual to Support Potential Reauthorization of Power Operations at Palisades Nuclear Plant ML24141A0632024-05-23023 May 2024 Summary of April 17, 2024, Hybrid Public Outreach Meeting ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24089A2472024-04-0808 April 2024 March 18, 2024, Summary of Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Proposed Emergency Plan for Resumption of Power Operations at the Palisades Nuclear Plant ML24051A0942024-02-27027 February 2024 Summary of February 6, 2024, Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Technical Specifications Administrative Controls and Quality Assurance Program ML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23257A2412023-09-19019 September 2023 Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22215A1912022-08-0909 August 2022 Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22151A1302022-06-0202 June 2022 May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML22125A2452022-05-0909 May 2022 May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis ML22003A0562022-01-10010 January 2022 Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21145A0482021-06-0202 June 2021 Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21117A0262021-05-0505 May 2021 Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20337A1572020-12-0808 December 2020 Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20309A2372020-11-0606 November 2020 Summary of Public Teleconference with Entergy Nuclear Operations, Inc. to Discuss Future Request for One-Time Exemption from Certain Requirements of 10 CFR 50, Appendix E, Section Iv.F. at Palisades Nuclear Plant (EPID L-2020-LRM-0091 ML20304A1442020-11-0202 November 2020 Summary of September 21, 2020, Public Teleconference with Entergy Nuclear Operations Inc. Regarding a Proposed Alternative for Repair of Reactor Vessel Head Penetrations for Palisades Nuclear Plant 2024-09-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 23, 2011 LICENSEE: Entergy Operations, Inc.
FACILITIES: Arkansas Nuclear One, Units 1 and 2, Waterford Steam Electric Station, Unit 3, and Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF APRIL 13, 2011, PRE-APPLICATION MEETING WITH ENTERGY OPERATIONS, INC., ON NFPA 805 PROPOSED LICENSE AMENDMENT REQUESTS FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (TAC NOS. ME5925 AND ME5926), WATERFORD STEAM ELECTRIC STATION, UNIT 3, AND PALISADES NUCLEAR PLANT On April 13, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (Entergy, the licensee), to discuss the licensee's plans for proposed National Fire Protection Association (NFPA) 805 license amendment requests (LARs) for Arkansas Nuclear One (ANO), Units 1 and 2, Waterford Steam Electric Station, Unit 3 (Waterford 3), and Palisades Nuclear Plant (PLP) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The meeting notice was issued on March 30, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110900436). The licensee's handouts for the meeting are available at ADAMS Accession No. ML111040153. A list of attendees is enclosed.
The licensee outlined the Integrated Fleet Project management approach to include corporate and individual site teams, coordination, and execution. The licensee forecasted the LAR submittal for all four plants in the fleet to be June 29, 2011, and that the submittals will meet acceptance criteria provided in LlC-109.
In discussing the NFPA 805 probabilistic risk assessment (PRA) peer review status, Entergy stated that while portions of the review have been completed, all of the reviews will be completed before the LAR is submitted. Additionally, Entergy presented the challenges, gaps, and technical issues faced by ANO, Units 1 and 2, Waterford 3, and PLP.
Other salient points:
- 1. The licensee expects a license amendment supplement related to alternative fire PRA methods if these alternative treatments are completed by the industry's fire PRA methods task force prior to the LAR approval.
- 2. In the area of PRA, fire is the most significant contributor to plant risk.
- 3. Items related to fire PRA peer review Facts and Observations will be resolved prior to the submittal of the LAR.
- 4. Implementation will be completed in 180 days from the date of the LAR approval and the related plant modifications will be completed within 18 to 36 months.
-2
- 5. ANO and LPL will be ready to submit on June 29, 2011, but could use additional time to re-evaluate their fire risk evaluations to reduce conservatisms.
Members of the public were in attendance via the teleconference bridge. Public Meeting Feedback forms were not received.
Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalvanam@nrc.gov.
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313, 50-368, 50-382, and 50-255
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES APRIL 13, 2011, MEETING WITH ENTERGY OPERATIONS, INC.
PRE-APPLICATION MEETING ON NFPA 805 LICENSE AMENDMENT REQUESTS ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 WATERFORD STEAM ELECTRIC STATION, UNIT 3 PALISADES NUCLEAR PLANT DOCKET NOS. 50-313, 50-368, 50-382, AND 50-255 Nuclear Regulatory Commission S. Lee, NRC/DRA S. Laur, NRR/DRA D. Harrison, NRR/DRAIAPLA J. Robinson, NRR/DLR/RPOB A. Klein, NRR/DRAlAFPB S. Dinsmore, NRRlDRAIAPLA P. Lain, NRRlDRAlAFPB N. Kalyanam, NRR/DORLlLPL4 Entergy Operations, Inc.
Bryan Ford Luis Terrazas Doug Kibler David Bice Deepak Rao Andy Thomas David Ferris Jessica Walker Tom Swiecicki Dennis Kunas David Mannai Rex Putnam Jim Miksa Jaime McCoy Jim Kuemin Public (over the Telephone)
Kelly Taylor, App. R Solutions, Inc.
Peter Barbadoro Phil. Bradley, Dominion Adam Dobson, New York William Cross, NextEraEnergy Brian Brogan - Palisades engineering Howard Brodt - Entergy Corporate engineering Richard Harris - ANO PRA Usama Farradj, Tom Sarver, and Bob White, ERIN (Engineering & Research, Inc.) (licensee's contractor):
Enclosure
-2
- 5. ANO and LPL will be ready to submit on June 29, 2011, but could use additional time to re-evaluate their fire risk evaluations to reduce conservatisms.
Members of the public were in attendance via the teleconference bridge. Public Meeting Feedback forms were not received.
Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov.
IRAJ N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313, 50-368, 50-382, and 50-255
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcRp Resource LPL4 Reading RidsRgn3MailCenter Resource RidsAcrsAcnw MailCTR Resource RldsRgn4MailCenter Resource RidsNrrDorlLpl3-1 Resource CSteger, NRR RidsNrrDorlLpl4 Resource DPickett, NRR/DORL/LPL 1-1 RidsNrrDra Resource PLain, NRR/DRAJAFPB RidsNrrDraAfpb Resource SLee, NRRIDRA RidsNrrDraApla Resource SLaur, NRRIDRA RidsNrrPMANO Resource JRobinson, NRR/DLR/RPOB RidsNrrPMPalisades Resource SDinsmore, NRR/DRAJAPLA RidsNrrPMWaterford 3 Resource DMertz, EDO Rill RidsNrrLABTully Resource SBush-Goddard, EDO RIV RidsNrrLABurkhardt Resource DRAIAFPBIBC DORLlLPL4/BC DORLlLPL4/PM JBurkhardt DHarrison AKlein MMarkley NKalyanam 4120/11 4126/11 512111 5/23111 5123111 OFFICIAL RECORD COPY