ML111390859

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Open House Meeting Summary for Arkansas Nuclear One 2010 Performance
ML111390859
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/19/2011
From: Clark J
NRC/RGN-IV/DRP/RPB-E
To: Schwarz C
Entergy Operations
References
Download: ML111390859 (3)


Text

May 19, 2011 Christopher Schwarz Vice President, Operations Entergy Operations Inc.

Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802

SUBJECT:

OPEN HOUSE MEETING

SUMMARY

FOR ARKANSAS NUCLEAR ONE 2010 PERFORMANCE

Dear Mr. Schwarz:

On May 4, 2011, NRC personnel held an open house meeting for members of the community at the Lake Point Conference Center. The purpose of this open house session was to discuss issues related to Arkansas Nuclear One, Unit 1 and Unit 2, including the performance results for the NRC inspection period of January 1 through December 31, 2010. The list of attendees is included as Enclosure 1.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Jeff Clark, P.E.

Chief, Project Branch E Division of Reactor Projects Docket: 50-313; 368 License: DPR-51; NPF-6

Enclosure:

1. Attendance List cc:

Distribution via ListServe UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125

Electronic distribution by RIV:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov )

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov )

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Jeff.Rotton@nrc.gov )

Resident Inspector (William.Schaup@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Project Engineer (Chris.Smith@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

RIV/ETA:EDO (Stephanie.Bush-Goddard@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEWEB Resource (Sue.Bogle@nrc.gov)

OEMail Resource R:\\_REACTORS\\_ANO\\2011\\ANO EOC MS 05-04-11 SUNSI Rev Compl.

Yes No ADAMS Yes No Reviewer Initials RVA Publicly Avail Yes No Sensitive Yes No Sens. Type Initials RVA RIV/SPE:DRP/E C:DRP/E RVAzua JAClark

/RA/

/RA/

5/19/11 5/19/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax