BYRON 2004-0043, 2003 Occupational Radiation Exposure Report | 30 April 2004 | 2003 Occupational Radiation Exposure Report | Deep Dose Equivalent |
BYRON 2004-0044, 2003 Annual Radiological Environmental Operating Report | 15 May 2004 | 2003 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
BYRON 2004-0045, 2003 Annual Radioactive Effluent Release Report | 30 April 2004 | 2003 Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
BYRON 2004-0049, April 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 May 2004 | April 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0060, Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | 2 June 2004 | Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Through-Wall Leak |
BYRON 2004-0061, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | 2 June 2004 | Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | Boric Acid |
BYRON 2004-0069, Addendum to 2003 Annual Radiological Environmental Operating Report | 10 June 2004 | Addendum to 2003 Annual Radiological Environmental Operating Report | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11) | 2 July 2004 | Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11) | Boric Acid Hydrostatic Nondestructive Examination VT-2 Moisture barrier Pressure Boundary Leakage |
BYRON 2004-0079, June 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 July 2004 | June 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0108, September 2004 Monthly Operating Report for Byron Station Units 1 and 2 | 15 October 2004 | September 2004 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0113, Response to Request for Additional Information Regarding Spring 2004 Steam Generator Inspection | 10 November 2004 | Response to Request for Additional Information Regarding Spring 2004 Steam Generator Inspection | |
BYRON 2004-0117, October 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 November 2004 | October 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0119, Report of Changes, Tests and Experiments | 16 December 2004 | Report of Changes, Tests and Experiments | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Post Accident Monitoring Temporary Modification Pressure Boundary Leakage Downpower |
BYRON 2004-0120, Issuance of Reactor Coolant System Pressure and Temperature Limits Reports | 12 November 2004 | Issuance of Reactor Coolant System Pressure and Temperature Limits Reports | Hydrostatic Pressure and Temperature Limits Report |
BYRON 2004-0128, November 2004 Monthly Operating Report Byron Station Units 1 and 2 | 15 December 2004 | November 2004 Monthly Operating Report Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0131, Notification of Deferral of a Generic Letter (GL) 89-13 Component Cooling Heat Exchanger Inspection | 17 December 2004 | Notification of Deferral of a Generic Letter (GL) 89-13 Component Cooling Heat Exchanger Inspection | Grace period |
BYRON 2005-0004, December 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | 14 January 2005 | December 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2005-0011, Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations. | 1 February 2005 | Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
BYRON 2005-0013, Control Room Envelope Unfiltered Air Inleakage Test Results in Response to Generic Letter 2003-01, Control Room Habitability. | 31 January 2005 | Control Room Envelope Unfiltered Air Inleakage Test Results in Response to Generic Letter 2003-01, Control Room Habitability. | |
BYRON 2005-0016, January 2005 Monthly Operating Report for Byron Station Units 1 and 2 | 15 February 2005 | January 2005 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2005-0024, Unit 2, 2004 Annual Environmental Operating Report | 16 April 2005 | Unit 2, 2004 Annual Environmental Operating Report | |
BYRON 2005-0030, February 2005 Monthly Operating Report for Byron Station Units 1 and 2 | 15 March 2005 | February 2005 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2005-0035, Regulatory Commitment Change Summary Report for 2004 | 1 April 2005 | Regulatory Commitment Change Summary Report for 2004 | |
BYRON 2005-0036, Steam Generator Tube Repairs Completed During Refueling Outage 13 | 28 March 2005 | Steam Generator Tube Repairs Completed During Refueling Outage 13 | |
BYRON 2005-0037, Cycle 14 Core Operating Limits Report | 23 March 2005 | Cycle 14 Core Operating Limits Report | Shutdown Margin |
BYRON 2005-0041, March 2005 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 April 2005 | March 2005 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2005-0049, Annual Dose Report for 2004 | 30 April 2005 | Annual Dose Report for 2004 | |
BYRON 2005-0050, Occupational Radiation Exposure Report | 30 April 2005 | Occupational Radiation Exposure Report | Deep Dose Equivalent |
BYRON 2005-0051, Annual Radiological Environmental Operating Report and Current Revision of the Offsite Dose Calculation Manual (ODCM) | 15 May 2005 | Annual Radiological Environmental Operating Report and Current Revision of the Offsite Dose Calculation Manual (ODCM) | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Chernobyl |
BYRON 2005-0052, Annual Radioactive Effluent Release Report and Addendum to 2003 Annual Radioactive Effluent Release Report | 30 April 2005 | Annual Radioactive Effluent Release Report and Addendum to 2003 Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
BYRON 2005-0053, Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication. | 29 April 2005 | Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication. | |
BYRON 2005-0054, Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. | 20 May 2005 | Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. | Boric Acid VT-2 Through-Wall Leak |
BYRON 2005-0063, April 2005 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 May 2005 | April 2005 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2005-0071, Steam Generator Inservice Inspection Summary Report | 3 June 2005 | Steam Generator Inservice Inspection Summary Report | Nondestructive Examination Flow Induced Vibration |
BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1 | 20 June 2005 | Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1 | Boric Acid Nondestructive Examination VT-2 Pressure Boundary Leakage |
BYRON 2005-0077, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | 22 June 2005 | Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | Boric Acid Nondestructive Examination |
BYRON 2005-0112, Lnservice Inspection Program Relief Request 12R-52 | 22 September 2005 | Lnservice Inspection Program Relief Request 12R-52 | |
BYRON 2005-0119, Cycle 13 Core Operating Limits Report | 7 October 2005 | Cycle 13 Core Operating Limits Report | Shutdown Margin |
BYRON 2005-0121, Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cycle 12 Refueling Outage | 17 October 2005 | Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cycle 12 Refueling Outage | |
BYRON 2005-0125, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. | 6 December 2005 | 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. | Boric Acid VT-2 Through-Wall Leak |
BYRON 2005-0132, Inservice Inspection Program Relief Request I3R-01 | 8 November 2005 | Inservice Inspection Program Relief Request I3R-01 | Incorporated by reference |
BYRON 2005-0135, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | 6 December 2005 | Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | Boric Acid VT-2 |
BYRON 2005-0155, Requests for Relief from ASME OM Code for the Third Inservice Test Interval | 29 December 2005 | Requests for Relief from ASME OM Code for the Third Inservice Test Interval | Safe Shutdown Stroke time |
BYRON 2006-0011, Submittal of Knowledge and Abilities (K/A) Statements That Will Be Suppressed from the Random Exam Generation Process | 17 January 2006 | Submittal of Knowledge and Abilities (K/A) Statements That Will Be Suppressed from the Random Exam Generation Process | Boric Acid Loop seal Power change |
BYRON 2006-0013, Byron June 2006 Examination Outline Submittal | 6 November 2006 | Byron June 2006 Examination Outline Submittal | Boric Acid Shutdown Margin Loop seal Power change Downpower |
BYRON 2006-0016, 2005 Regulatory Commitment Change Summary Report | 15 February 2006 | 2005 Regulatory Commitment Change Summary Report | Unidentified leakage |
BYRON 2006-0018, Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure | 31 January 2006 | Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure | |
BYRON 2006-0022, Withdrawal of Inservice Inspection Program Relief Request 12R-52 | 1 February 2006 | Withdrawal of Inservice Inspection Program Relief Request 12R-52 | |
BYRON 2006-0023, Response to Request for Additional Information Regarding the Byron Station, Unit 1 Spring 2005 Steam Generator Inspection | 13 February 2006 | Response to Request for Additional Information Regarding the Byron Station, Unit 1 Spring 2005 Steam Generator Inspection | |
BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval | 14 February 2006 | Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval | Boric Acid Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis Moisture barrier Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |