Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000254/LER-1982-020, Forwards LER 82-020/03L-04 October 1982Forwards LER 82-020/03L-0
05000254/LER-1982-021, Forwards LER 82-021/03L-023 August 1982Forwards LER 82-021/03L-0
05000254/LER-1982-023, Forwards LER 82-023/03L-07 September 1982Forwards LER 82-023/03L-0
05000254/LER-1982-024, Forwards LER 82-024/03L-09 September 1982Forwards LER 82-024/03L-0
05000254/LER-1982-025, Forwards LER 82-025/03L-029 September 1982Forwards LER 82-025/03L-0
05000254/LER-1982-026, Forwards Revised LER 82-026/03L-218 March 1983Forwards Revised LER 82-026/03L-2
05000254/LER-1982-027, Forwards LER 82-027/03L-029 September 1982Forwards LER 82-027/03L-0
05000254/LER-1982-028, Forwards LER 82-028/03L-016 September 1982Forwards LER 82-028/03L-0
05000254/LER-1982-029, Forwards LER 82-029/01T-028 September 1982Forwards LER 82-029/01T-0
05000254/LER-1982-030, Forwards LER 82-030/03L-01 October 1982Forwards LER 82-030/03L-0
05000254/LER-1982-031, Forwards LER 82-031/03L-030 September 1982Forwards LER 82-031/03L-0
05000254/LER-1982-032, Forwards LER 82-032/03L-030 September 1982Forwards LER 82-032/03L-0
05000254/LER-1982-034, Forwards LER 82-034/03L-01 November 1982Forwards LER 82-034/03L-0
05000254/LER-1982-035, Forwards LER 82-035/03L-016 November 1982Forwards LER 82-035/03L-0
05000254/LER-1982-039, Forwards LER 82-039/03L-010 January 1983Forwards LER 82-039/03L-0
05000254/LER-1983-001, Forwards LER 83-001/03L-01 February 1983Forwards LER 83-001/03L-0
05000254/LER-1983-002, Forwards LER 83-002/03L-014 February 1983Forwards LER 83-002/03L-0
05000254/LER-1983-003, Forwards LER 83-003/03L-024 January 1983Forwards LER 83-003/03L-0
05000254/LER-1983-004, Forwards LER 83-004/03L-024 January 1983Forwards LER 83-004/03L-0
05000254/LER-1983-005, Forwards LER 83-005/03L-028 January 1983Forwards LER 83-005/03L-0
05000254/LER-1983-006, Forwards LER 83-006/03L-023 February 1983Forwards LER 83-006/03L-0
05000254/LER-1983-007, Forwards LER 83-007/03L-09 March 1983Forwards LER 83-007/03L-0
05000254/LER-1983-008, Forwards LER 83-008/03L-02 March 1983Forwards LER 83-008/03L-0
05000254/LER-1983-010, Forwards LER 83-010/03L-022 March 1983Forwards LER 83-010/03L-0
05000254/LER-1983-011, Forwards LER 83-011/03L-08 March 1983Forwards LER 83-011/03L-0
05000254/LER-1983-012, Forwards LER 83-012/01T-024 March 1983Forwards LER 83-012/01T-0
05000254/LER-1983-013, Forwards LER 83-013/03L-012 April 1983Forwards LER 83-013/03L-0
05000254/LER-1983-014, Forwards LER 83-014/03L-020 April 1983Forwards LER 83-014/03L-0
05000254/LER-1983-015, Forwards LER 83-015/03L-022 April 1983Forwards LER 83-015/03L-0
05000254/LER-1983-019, Forwards LER 83-019/03L-03 May 1983Forwards LER 83-019/03L-0
05000254/LER-1986-001, Responds to NRC Re Violations Noted in Insp Repts 50-254/86-06 & 50-265/86-06.Corrective Actions:Response to Repetitive Local Leak Rate Failures Provided in Encl Rev 1 to LER 86-00124 July 1986Responds to NRC Re Violations Noted in Insp Repts 50-254/86-06 & 50-265/86-06.Corrective Actions:Response to Repetitive Local Leak Rate Failures Provided in Encl Rev 1 to LER 86-001Anchor Darling
05000254/LER-1986-007, Responds to NRC Re Violations Noted in Insp Repts 50-254/87-09 & 50-265/87-09 on 870407-09.Corrective Actions: LER 86-007-00 for Unit 2 Will Be Supplemented to Describe More Fully Root Cause,Investigation & Corrective Actions20 May 1987Responds to NRC Re Violations Noted in Insp Repts 50-254/87-09 & 50-265/87-09 on 870407-09.Corrective Actions: LER 86-007-00 for Unit 2 Will Be Supplemented to Describe More Fully Root Cause,Investigation & Corrective Actions
05000254/LER-1987-025, Forwards Addl Info Re Control Room Habitability to Support Narrative Contained in LER 87-025 (Rev 1),including Control Room Habitability Study,Updated FSAR (Rev 88),inplace Charcoal Absorber Leak Rate Testing & Calculations19 May 1989Forwards Addl Info Re Control Room Habitability to Support Narrative Contained in LER 87-025 (Rev 1),including Control Room Habitability Study,Updated FSAR (Rev 88),inplace Charcoal Absorber Leak Rate Testing & Calculations
05000254/LER-1991-003, Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F4129 May 1996Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F41
05000254/LER-1994-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr19 January 1998Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr
05000254/LER-1994-003, Forwards LER 94-003,Rev 0 Re Not Establishing Continuous Firewatch Following Impairment of Safe Shutdown Path. Commitments Listed18 February 1994Forwards LER 94-003,Rev 0 Re Not Establishing Continuous Firewatch Following Impairment of Safe Shutdown Path. Commitments ListedSafe Shutdown
05000254/LER-1994-004, Submits Reproduction of Original Text of LER 94-004 & Suppl Info5 December 1995Submits Reproduction of Original Text of LER 94-004 & Suppl Info
05000254/LER-1994-005, Forwards LER 94-005-00.Suppl Rept Will Be Issued,Documenting Valves & Penetrations That Had Excessive Leakage,What Caused Leakage & Corrective Actions11 April 1994Forwards LER 94-005-00.Suppl Rept Will Be Issued,Documenting Valves & Penetrations That Had Excessive Leakage,What Caused Leakage & Corrective Actions
05000254/LER-1994-015, Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition Occurred1 November 1994Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition OccurredUnanalyzed Condition
05000254/LER-1994-016, Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed22 December 1994Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed
05000254/LER-1995-001, Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 031 January 1995Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 0
05000254/LER-1995-004, Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories28 April 1995Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories
05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure20 March 1996Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure
05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels27 June 1996Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels
05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated6 August 1996Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations InvestigatedHot Short
Safe Shutdown
05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 97030130 August 1996Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301
05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed11 September 1996Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,ListedZebra Mussel
05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed24 October 1996Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed
05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 96123111 September 1996Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231
05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items13 September 1996Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items